[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893352":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},893352,580,1,"单选题","现场采用重叠法预制钢筋混凝土桩时，上层桩的浇筑应等到下层桩混凝土强度达到设计强度等级的（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","30%",true,{"key":16,"text":17,"correct":18},"B","60%",false,{"key":20,"text":21,"correct":18},"C","70%",{"key":23,"text":24,"correct":18},"D","100%","制作预制桩有并列法、间隔法、重叠法、翻模法等。现场预制桩多用重叠法预制，重叠层数不宜超过4层，层与层之间应涂刷隔离剂，上层桩或邻近桩的灌注，应在下层桩或邻近桩混凝土达到设计强度等级的30%以后方可进行。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]