[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893287":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},893287,580,1,"单选题","下列关于钢筋混凝土预制桩的制作、起吊、运输和堆放，表述正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","现场预制桩，多采用重叠法制作",true,{"key":16,"text":17,"correct":18},"B","长度小于10m的短桩，工艺简单，宜现场预制",false,{"key":20,"text":21,"correct":18},"C","钢筋混凝土预制桩应在混凝土达到设计强度的50%时方可起吊",{"key":23,"text":24,"correct":18},"D","不同规格的预制桩应上小下大的模式堆放，堆放层数不宜超过4层","本题考查的是地基与基础工程施工技术。选项B错误，长度小于10m的短桩，一般多在工厂预制；较长的桩，因不便运输，通常在打桩现场附近预制；选项C错误，钢筋混凝土预制桩应在混凝土达到设计强度的70%时方可起吊；选项D错误，不同规格的预制桩应分别堆放。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]