[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893277":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},893277,580,1,"单选题","某先张法预应力施工中，预应力筋长度为25m，其张拉方式为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","宜采用两端张拉",true,{"key":16,"text":17,"correct":18},"B","宜采用一端张拉",false,{"key":20,"text":21,"correct":18},"C","应采用一段张拉",{"key":23,"text":24,"correct":18},"D","应采用两端张拉","本题考查的是建筑工程主体结构施工技术。先张法预应力施工中，预应力筋长度大于20m的宜采用两端张拉，长度小于20m的可采用一端张拉。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]