[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893223":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},893223,580,1,"单选题","下列关于混凝土工程施工的说法，正确的为( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","混凝土运输、输送及浇筑过程中可以加水",false,{"key":16,"text":17,"correct":14},"B","同一施工段的混凝土应在底层混凝土终凝之前将上一层混凝土浇筑完毕",{"key":19,"text":20,"correct":14},"C","大体积混凝土结构目前应用较多的是分段分层方案",{"key":22,"text":23,"correct":24},"D","振动器按工作方式可分为内部振动器、外部振动器、表面振动器和振动台四种",true,"混凝土运输、输送及浇筑过程中严禁加水。同一施工段的混凝土应连续浇筑，并应在底层混凝土初凝之前将上一层混凝土浇筑完毕。目前应用较多的是斜面分层方案。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]