[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-579-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":728},{"id":5,"name":6,"category":7,"favorite":8},579,"[水利工程]建设工程计量与计价实务","建筑工程",0,5,50,329,[13,38,53,68,82,97,112,126,141,156,171,185,200,214,228,243,257,272,286,300,314,328,343,357,371,386,400,413,427,441,455,469,483,496,510,524,538,552,565,575,589,602,616,629,643,658,672,686,700,714],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},892831,2,"多选题","关于质量保证金，下列说法中正确的有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","质量保证金的计算额度不包括预付款的支付与扣回金额",true,{"key":24,"text":25,"correct":26},"B","在合同工程完工证书颁发后7天内，发包人将质量保证金总额的一半支付给承包人",false,{"key":28,"text":29,"correct":22},"C","在合同约定的缺陷责任期满时，发包人将在30个工作日内会同承包人核实承包人是否完成保修责任，如无异议，发包人将剩余的质量保证金支付给承包人",{"key":31,"text":32,"correct":22},"D","在合同约定的缺陷责任期（工程质量保修期）满时，承包人未完成缺陷责任的，发包人有权扣留与未履行责任剩余工作所需金额相应的质量保证金余额",{"key":34,"text":35,"correct":26},"E","监理人在颁发了缺陷责任证书后，若仍发现有工程缺陷，由发包人维修，剩余保留金可暂不退还","ACD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},892832,"发包人向承包人的索赔包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"施工缺陷索赔",{"key":24,"text":45,"correct":26},"工程变更引起的索赔",{"key":28,"text":47,"correct":22},"发包人合理终止合同",{"key":31,"text":49,"correct":22},"工程拖期索赔",{"key":34,"text":51,"correct":22},"对指定分包商的付款索赔","ACDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},892833,"关于工程预付款支付的说法，正确的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"第一次预付款应在协议书签订后14d内，由承包人向发包人提交经发包人认可的预付款保函，并经监理工程师出具付款凭证书报送发包人批准后予以支付",{"key":24,"text":60,"correct":22},"保函金额为本次预付款金额",{"key":28,"text":62,"correct":22},"第二次预付款需待承包人主要设备进入工地后，其估算值已达到本次预付款金额时",{"key":31,"text":64,"correct":22},"工程预付款保函在预付款被发包人扣回前一直有效",{"key":34,"text":66,"correct":26},"第二次预付支付时，发包人收到监理工程师出具的付款证书后28d内支付给承包人","BCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":67,"analysis":37},892834,"关于不可抗力造成损失的承担，下列说法中正确的有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"运至施工场地用于施工的材料和待安装的设备的损害，由承包人承担",{"key":24,"text":75,"correct":22},"因工程损害导致第三方人员伤亡和财产损失，由发包人承担",{"key":28,"text":77,"correct":22},"发包人、承包人人员伤亡由其所在单位负责并承担相应费用",{"key":31,"text":79,"correct":22},"停工期间，承包人应发包人要求留在施工场地的必要的管理人员的费用，由发包人承担",{"key":34,"text":81,"correct":26},"工程所需的清理、修复费用，由承包人承担",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},892835,"根据《水利水电工程标准文件》中的合同条款，承包人可同时获得工期补偿和费用补偿，但是不能获得利润补偿的是（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"施工过程发现文物古迹",{"key":24,"text":89,"correct":26},"异常恶劣气候条件",{"key":28,"text":91,"correct":22},"承包人遇到不利物质条件",{"key":31,"text":93,"correct":26},"发包人原因引起暂停施工",{"key":34,"text":95,"correct":26},"发包人提供的材料设备不符合合同要求","AC",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},892836,"在履行合同中发生（ ），应进行工程变更。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"取消合同中任何一项工作，但被取消工作不能转由发包人或其他人实施",{"key":24,"text":104,"correct":22},"改变或补充合同中任何一项工作的技术标准和要求",{"key":28,"text":106,"correct":22},"改变合同工程的基线、标高、位置或尺寸",{"key":31,"text":108,"correct":26},"改变现场的施工人员数量",{"key":34,"text":110,"correct":26},"提高施工管理的效率","ABC",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":111,"analysis":37},892837,"根据水利水电工程性质，其项目分别按枢纽工程、引水工程及河道工程划分，工程各部分下设（ ）项目。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"一级",{"key":24,"text":119,"correct":22},"二级",{"key":28,"text":121,"correct":22},"三级",{"key":31,"text":123,"correct":26},"四级",{"key":34,"text":125,"correct":26},"五级",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},892838,"关于工程量计算规则及工程量计算的基本要求，下列说法错误的有（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"不同工程的工程量计算规则基本相同",{"key":24,"text":133,"correct":26},"清单计价规范适用于引（调）水、灌溉等新建、改建工程的招标投标工程量清单编制",{"key":28,"text":135,"correct":26},"项目建议书阶段工程量的计算选取的阶段系数应与设计阶段相符",{"key":31,"text":137,"correct":22},"除定额另有规定外，工程量计算包括材料在建筑安装施工过程中的损耗量",{"key":34,"text":139,"correct":26},"按现行规定，尽可能杜绝工程量计算错漏等问题","AD",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},892839,"关于疏浚工程的设计工程量计算，下列说法正确的有（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"疏浚工程量计算宜按设计水下方计量",{"key":24,"text":148,"correct":26},"吹填工程量计算只需考虑吹填区填筑量",{"key":28,"text":150,"correct":22},"疏浚与吹填工程提供给造价专业的疏浚与吹填工程量计量单位均应为水下方",{"key":31,"text":152,"correct":26},"多个疏浚区只需计算总工程量",{"key":34,"text":154,"correct":22},"取土区土质变化较大，应按地质柱状剖面图分别计算各类土的工程量","ACE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},892840,"根据《水利工程工程量清单计价规范》（GB 50501—2007），以“m2”为计量单位的项目有（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":26},"岩石层帷幕灌浆",{"key":24,"text":163,"correct":26},"岩石层固结灌浆",{"key":28,"text":165,"correct":22},"回填灌浆",{"key":31,"text":167,"correct":22},"岩石面喷浆",{"key":34,"text":169,"correct":22},"混凝土地下连续墙","CDE",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":155,"analysis":37},892841,"关于钻孔灌浆与锚固工程工程量的计算，下列说法错误的有（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"地下工程的固结灌浆，其钻孔和灌浆工程量根据设计要求以体积计",{"key":24,"text":178,"correct":26},"回填灌浆工程量按设计的回填接触面积计算",{"key":28,"text":180,"correct":22},"接触灌浆和接缝灌浆的工程量，按设计接触面积计算",{"key":31,"text":182,"correct":26},"振冲桩应按不同孔深以桩长计算",{"key":34,"text":184,"correct":22},"钻机钻灌浆孔需明确钻孔上部岩石级别",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},892842,"水利建筑工程工程量清单项目包括（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"土方开挖工程",{"key":24,"text":192,"correct":22},"土石方填筑工程",{"key":28,"text":194,"correct":22},"预制混凝土工程",{"key":31,"text":196,"correct":22},"原料开采及加工工程",{"key":34,"text":198,"correct":26},"机电设备安装工程","ABCD",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":199,"analysis":37},892843,"关于混凝土工程量的说法，正确的有（ ）。",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"计算应以成品实体方计量",{"key":24,"text":207,"correct":22},"项目建议书阶段混凝土工程量宜按工程各建筑物分项、分强度、分级配计算",{"key":28,"text":209,"correct":22},"可行性研究和初步设计阶段混凝土工程量应根据设计图纸分部位、分强度、分级配计算",{"key":31,"text":211,"correct":22},"碾压混凝土宜提出工法",{"key":34,"text":213,"correct":26},"钢筋混凝土的钢筋应单独列出",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":155,"analysis":37},892844,"施工临时供电线路工程量可按设计的（ ）计算。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"线路走向",{"key":24,"text":221,"correct":26},"电流等级",{"key":28,"text":223,"correct":22},"电压等级",{"key":31,"text":225,"correct":26},"电阻等级",{"key":34,"text":227,"correct":22},"回路数",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":242,"analysis":37},892845,"影响施工超挖工程量的因素主要有（ ）。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"施工方法",{"key":24,"text":235,"correct":22},"施工技术及管理水平",{"key":28,"text":237,"correct":26},"操作人员的理论知识",{"key":31,"text":239,"correct":26},"自然天气",{"key":34,"text":241,"correct":22},"地质条件","ABE",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":36,"analysis":37},892846,"《水利建筑工程预算定额》内容包括（ ）。",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"土方工程",{"key":24,"text":250,"correct":26},"动力机械工程",{"key":28,"text":252,"correct":22},"砌石工程",{"key":31,"text":254,"correct":22},"模板工程",{"key":34,"text":256,"correct":26},"变电站设备安装工程",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":271,"analysis":37},892847,"预算定额的调整换算可以分为（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"用量换算",{"key":24,"text":264,"correct":22},"乘系数换算",{"key":28,"text":266,"correct":26},"品种换算",{"key":31,"text":268,"correct":22},"厚度换算",{"key":34,"text":270,"correct":22},"配合比换算","ABDE",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":155,"analysis":37},892848,"对于某些大型工程和重要的中型工程一般采用，三阶段设计包括（ ）。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"初步设计",{"key":24,"text":279,"correct":26},"技术设计",{"key":28,"text":281,"correct":22},"招标设计",{"key":31,"text":283,"correct":26},"施工方案设计",{"key":34,"text":285,"correct":22},"施工图设计",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":111,"analysis":37},892849,"以下属于项目施工准备阶段工作的有（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"组织招标设计",{"key":24,"text":293,"correct":22},"设备、物资采购",{"key":28,"text":295,"correct":22},"编制建设项目的实施计划",{"key":31,"text":297,"correct":26},"组织工程建设监理和施工招标投标",{"key":34,"text":299,"correct":26},"施工现场的进度管理",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":52,"analysis":37},892850,"以下属于生产准备工作的有（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"招收和培训人员",{"key":24,"text":307,"correct":26},"技术交底",{"key":28,"text":309,"correct":22},"生产技术准备",{"key":31,"text":311,"correct":22},"生产物资准备",{"key":34,"text":313,"correct":22},"制定必要的管理制度",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":96,"analysis":37},892851,"完工结算与竣工决算的主要区别有（ ）。",[318,320,322,324,326],{"key":20,"text":319,"correct":22},"范围",{"key":24,"text":321,"correct":26},"计算方法",{"key":28,"text":323,"correct":22},"成本内容",{"key":31,"text":325,"correct":26},"完成的人员",{"key":34,"text":327,"correct":26},"准确性",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":342,"analysis":37},892852,"材料预算价格受（ ）影响。",[332,334,336,338,340],{"key":20,"text":333,"correct":22},"材料原价",{"key":24,"text":335,"correct":22},"采购及保管费率",{"key":28,"text":337,"correct":26},"进场验收时间",{"key":31,"text":339,"correct":22},"运杂费",{"key":34,"text":341,"correct":26},"损耗率","ABD",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":155,"analysis":37},892853,"施工用电价格由（ ）组成。",[347,349,351,353,355],{"key":20,"text":348,"correct":22},"基本电价",{"key":24,"text":350,"correct":26},"机械设备价格",{"key":28,"text":352,"correct":22},"电能损耗摊销费",{"key":31,"text":354,"correct":26},"管理人员费用",{"key":34,"text":356,"correct":22},"供电设施维修摊销费",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":370,"analysis":37},892854,"设备费由（ ）组成。",[361,363,365,366,368],{"key":20,"text":362,"correct":26},"设备损耗费",{"key":24,"text":364,"correct":22},"设备原价",{"key":28,"text":339,"correct":22},{"key":31,"text":367,"correct":22},"运输保险费",{"key":34,"text":369,"correct":22},"采购保管","BCDE",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":385,"analysis":37},892855,"生产准备费包括（ ）。",[375,377,379,381,383],{"key":20,"text":376,"correct":22},"生产及管理单位提前进厂费",{"key":24,"text":378,"correct":22},"生产职工培训费",{"key":28,"text":380,"correct":22},"管理用具购置费",{"key":31,"text":382,"correct":26},"生产人员工资",{"key":34,"text":384,"correct":22},"工器具及生产家具购置费","ABCE",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":199,"analysis":37},892856,"安全监测设备采购及安装工程清单项目包括（ ）。",[390,392,394,396,398],{"key":20,"text":391,"correct":22},"工程变形监测控制网设备采购及安装",{"key":24,"text":393,"correct":22},"变形监测设备采购及安装",{"key":28,"text":395,"correct":22},"结构振动监测设备采购及安装",{"key":31,"text":397,"correct":22},"工程安全监测自动化采集系统设备采购及安装",{"key":34,"text":399,"correct":26},"油压启闭机设备安装",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":170,"analysis":37},892857,"水利安装工程工程量清单项目包括（ ）。",[404,406,408,410,411],{"key":20,"text":405,"correct":26},"围护设备安装工程",{"key":24,"text":407,"correct":26},"地质勘测安装工程",{"key":28,"text":409,"correct":22},"安全监测设备采购及安装工程",{"key":31,"text":198,"correct":22},{"key":34,"text":412,"correct":22},"金属结构设备安装工程",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":52,"analysis":37},892858,"预应力混凝土中（ ）所占用的空间体积不予扣除。",[417,419,421,423,425],{"key":20,"text":418,"correct":22},"钢筋",{"key":24,"text":420,"correct":26},"螺丝",{"key":28,"text":422,"correct":22},"锚索",{"key":31,"text":424,"correct":22},"钢管",{"key":34,"text":426,"correct":22},"埋件",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":242,"analysis":37},892859,"机电主要设备安装工程项目组成内容包括（ ）。",[431,433,435,437,439],{"key":20,"text":432,"correct":22},"大型泵站水泵",{"key":24,"text":434,"correct":22},"大型泵站电动机",{"key":28,"text":436,"correct":26},"起重设备",{"key":31,"text":438,"correct":26},"电流互感器",{"key":34,"text":440,"correct":22},"励磁系统",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":199,"analysis":37},892860,"关于金属结构设备安装工程其他相关问题的处理，下列说法正确的有（ ）。",[445,447,449,451,453],{"key":20,"text":446,"correct":22},"闸门按招标设计图示尺寸计算的有效重量计量",{"key":24,"text":448,"correct":22},"设备及附属设备验收、接货所发生的费用属于金属结构设备安装工程费",{"key":28,"text":450,"correct":22},"升船机设备是金属结构设备安装工程项目组成内容",{"key":31,"text":452,"correct":22},"金属结构设备安装工程十至十二位为清单项目名称顺序码自000起顺序编码",{"key":34,"text":454,"correct":26},"高压钢管以根数为单位计算工程量",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":385,"analysis":37},892861,"关于土方开挖工程的说法，正确的有（ ）。",[459,461,463,465,467],{"key":20,"text":460,"correct":22},"除场地平整按招标设计图示场地平整面积计量外，其他项目都按招标设计图示轮廓尺寸计算的有效自然方体积计量",{"key":24,"text":462,"correct":22},"施工过程中增加的超挖量和施工附加量所发生的费用，应摊入有效工程量的工程单价中",{"key":28,"text":464,"correct":22},"夹有孤石的土方开挖，大于0.7m3的孤石按石方开挖计量",{"key":31,"text":466,"correct":26},"土方开挖工程清单项目不包括弃土运输的工作内容",{"key":34,"text":468,"correct":22},"开挖与运输不在同一标段的工程，应分别选取开挖和运输的工作内容计量",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":36,"analysis":37},892862,"（ ）按招标设计图示尺寸计算的有效实体方体积计量。",[473,475,477,479,481],{"key":20,"text":474,"correct":22},"预制混凝土构件",{"key":24,"text":476,"correct":26},"混凝土预制件吊装",{"key":28,"text":478,"correct":22},"预制混凝土模板",{"key":31,"text":480,"correct":22},"预制预应力混凝土构件",{"key":34,"text":482,"correct":26},"预应力钢筒混凝土（PCCP）输水管道",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":271,"analysis":37},892863,"以质量为单位计算工程量的金属结构设备或装置性材料有（ ）。",[487,489,491,493,494],{"key":20,"text":488,"correct":22},"闸门",{"key":24,"text":490,"correct":22},"拦污栅",{"key":28,"text":492,"correct":26},"启闭机",{"key":31,"text":426,"correct":22},{"key":34,"text":495,"correct":22},"高压钢管",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":52,"analysis":37},892864,"投标人填入工程量清单中的单价应包括（ ）。",[500,502,504,506,508],{"key":20,"text":501,"correct":22},"直接费",{"key":24,"text":503,"correct":26},"间接费",{"key":28,"text":505,"correct":22},"施工管理费",{"key":31,"text":507,"correct":22},"利润",{"key":34,"text":509,"correct":22},"税金",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":271,"analysis":37},892865,"投标报价的编制程序包括（ ）。",[514,516,518,520,522],{"key":20,"text":515,"correct":22},"确定利润",{"key":24,"text":517,"correct":22},"复核工程量",{"key":28,"text":519,"correct":26},"确定工程量清单计价规范",{"key":31,"text":521,"correct":22},"确定单价",{"key":34,"text":523,"correct":22},"确定风险费",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":342,"analysis":37},892866,"独立费用包括（ ）。",[528,530,532,534,536],{"key":20,"text":529,"correct":22},"生产准备费",{"key":24,"text":531,"correct":22},"建设管理费",{"key":28,"text":533,"correct":26},"冬雨季施工增加费",{"key":31,"text":535,"correct":22},"工程建设监理费",{"key":34,"text":537,"correct":26},"技术转让费",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":111,"analysis":37},892867,"根据水利工程性质，工程项目下设（ ）。",[542,544,546,548,550],{"key":20,"text":543,"correct":22},"一级项目",{"key":24,"text":545,"correct":22},"二级项目",{"key":28,"text":547,"correct":22},"三级项目",{"key":31,"text":549,"correct":26},"四级项目",{"key":34,"text":551,"correct":26},"五级项目",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":342,"analysis":37},892868,"建设管理费包括（ ）。",[556,558,560,561,563],{"key":20,"text":557,"correct":22},"项目管理费",{"key":24,"text":559,"correct":22},"建设单位开办费",{"key":28,"text":376,"correct":26},{"key":31,"text":562,"correct":22},"建设单位人员费",{"key":34,"text":564,"correct":26},"工程勘测设计费",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":370,"analysis":37},892869,"生产准备费包含（ ）。",[569,571,572,573,574],{"key":20,"text":570,"correct":26},"工程质量检测费",{"key":24,"text":378,"correct":22},{"key":28,"text":376,"correct":22},{"key":31,"text":380,"correct":22},{"key":34,"text":384,"correct":22},{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":155,"analysis":37},892870,"下列各项中，属于直接费的有（ ）。",[579,581,583,585,587],{"key":20,"text":580,"correct":22},"施工机械使用费",{"key":24,"text":582,"correct":26},"固定资产使用费",{"key":28,"text":584,"correct":22},"材料费",{"key":31,"text":586,"correct":26},"工具用具使用费",{"key":34,"text":588,"correct":22},"临时设施费",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":52,"analysis":37},892871,"运杂费包括（ ）。",[593,595,596,598,600],{"key":20,"text":594,"correct":22},"运输费",{"key":24,"text":367,"correct":26},{"key":28,"text":597,"correct":22},"装卸费",{"key":31,"text":599,"correct":22},"包装绑扎费",{"key":34,"text":601,"correct":22},"大型变压器充氮费",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":385,"analysis":37},892872,"下列各项中，属于企业管理费的有（ ）。",[606,608,610,612,614],{"key":20,"text":607,"correct":22},"职工福利费",{"key":24,"text":609,"correct":22},"办公费",{"key":28,"text":611,"correct":22},"管理人员工资",{"key":31,"text":613,"correct":26},"材料保管部门人员工资",{"key":34,"text":615,"correct":22},"城市维护建设税",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":628,"analysis":37},892873,"下列各项中，属于采购及保管费用的有（ ）。",[620,621,623,625,626],{"key":20,"text":597,"correct":26},{"key":24,"text":622,"correct":22},"采购保管部门工作人员的工资",{"key":28,"text":624,"correct":22},"转运站的运行费",{"key":31,"text":599,"correct":26},{"key":34,"text":627,"correct":22},"仓库的固定资产折旧费","BCE",{"id":630,"libraryId":5,"type":15,"typeLabel":16,"stem":631,"options":632,"answer":155,"analysis":37},892874,"下列关于设备原价的说法中，正确的有（ ）。",[633,635,637,639,641],{"key":20,"text":634,"correct":22},"国产设备的原价为其出厂价",{"key":24,"text":636,"correct":26},"进口设备以到岸价为原价",{"key":28,"text":638,"correct":22},"进口设备以到岸价和进口征收的税金、手续费、商检费及港口费等各项费用之和为原价",{"key":31,"text":640,"correct":26},"大型机组及其他大型设备分瓣运至工地后的拼装费用，不包括在设备原价内",{"key":34,"text":642,"correct":22},"大型机组及其他大型设备分瓣运至工地后的拼装费用，应包括在设备原价内",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":657,"analysis":37},892875,"以下属于辅助工资的有（ ）。",[647,649,651,653,655],{"key":20,"text":648,"correct":26},"探亲假期间的工资",{"key":24,"text":650,"correct":22},"施工津贴",{"key":28,"text":652,"correct":26},"女工哺乳期间的工资",{"key":31,"text":654,"correct":22},"夜餐津贴",{"key":34,"text":656,"correct":22},"节假日加班津贴","BDE",{"id":659,"libraryId":5,"type":15,"typeLabel":16,"stem":660,"options":661,"answer":52,"analysis":37},892876,"水利工程概算项目划分为（ ）。",[662,664,666,668,670],{"key":20,"text":663,"correct":22},"工程部分概算",{"key":24,"text":665,"correct":26},"安全文明施工概算",{"key":28,"text":667,"correct":22},"建设征地移民补偿",{"key":31,"text":669,"correct":22},"环境保护工程概算",{"key":34,"text":671,"correct":22},"水土保持工程概算",{"id":673,"libraryId":5,"type":15,"typeLabel":16,"stem":674,"options":675,"answer":155,"analysis":37},892877,"根据工程实际情况可单独列示的有（ ）。",[676,678,680,682,684],{"key":20,"text":677,"correct":22},"缆机平台",{"key":24,"text":679,"correct":26},"施工交通",{"key":28,"text":681,"correct":22},"掘进机泥水处理系统",{"key":31,"text":683,"correct":26},"施工房屋建筑",{"key":34,"text":685,"correct":22},"管片预制系统土建设施",{"id":687,"libraryId":5,"type":15,"typeLabel":16,"stem":688,"options":689,"answer":385,"analysis":37},892878,"建设征地移民安置补偿费用包括（ ）。",[690,692,694,696,698],{"key":20,"text":691,"correct":22},"补偿补助费",{"key":24,"text":693,"correct":22},"工程建设费",{"key":28,"text":695,"correct":22},"其他费用",{"key":31,"text":697,"correct":26},"财务费",{"key":34,"text":699,"correct":22},"预备费",{"id":701,"libraryId":5,"type":15,"typeLabel":16,"stem":702,"options":703,"answer":199,"analysis":37},892879,"环境保护工程投资包括（ ）。",[704,706,708,710,712],{"key":20,"text":705,"correct":22},"环境保护措施",{"key":24,"text":707,"correct":22},"环境监测设施",{"key":28,"text":709,"correct":22},"环境保护仪器设备及安装",{"key":31,"text":711,"correct":22},"环境保护预备费",{"key":34,"text":713,"correct":26},"安全文明施工费",{"id":715,"libraryId":5,"type":15,"typeLabel":16,"stem":716,"options":717,"answer":111,"analysis":37},892880,"林草措施包括（ ）。",[718,720,722,724,726],{"key":20,"text":719,"correct":22},"造林工程",{"key":24,"text":721,"correct":22},"水土保持种草工程",{"key":28,"text":723,"correct":22},"苗圃工程",{"key":31,"text":725,"correct":26},"机械固沙工程",{"key":34,"text":727,"correct":26},"补植补种工程",[729,733,736,739,742,745],{"id":730,"name":731,"category":7,"favorite":732},1,"领导干部任职前廉政法规知识测试题",92,{"id":734,"name":735,"category":7,"favorite":730},595,"建筑结构与设备",{"id":737,"name":738,"category":7,"favorite":730},715,"招标采购专业知识与法律法规",{"id":740,"name":741,"category":7,"favorite":730},848,"市政方向-通用基础",{"id":743,"name":744,"category":7,"favorite":8},534,"BIM工程师",{"id":746,"name":744,"category":7,"favorite":8},535]