[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-579-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":606},{"id":5,"name":6,"category":7,"favorite":8},579,"[水利工程]建设工程计量与计价实务","建筑工程",0,1,50,329,[13,33,45,55,67,79,91,103,115,127,138,146,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,441,453,465,477,489,499,511,522,534,546,558,570,582,594],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":26,"analysis":32},892629,"单选题","不实行招标投标的工程由（ ）订立合同。",[18,22,25,29],{"key":19,"text":20,"correct":21},"A","发包人",false,{"key":23,"text":24,"correct":21},"B","承包人",{"key":26,"text":27,"correct":28},"C","发承包双方",true,{"key":30,"text":31,"correct":21},"D","造价管理部门","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":19,"analysis":32},892630,"实行工程量清单计价的建筑工程，鼓励发承包双方采用（ ）确定合同价款。",[37,39,41,43],{"key":19,"text":38,"correct":28},"单价方式",{"key":23,"text":40,"correct":21},"总价方式",{"key":26,"text":42,"correct":21},"成本加酬金方式",{"key":30,"text":44,"correct":21},"单价方式或成本加酬金方式",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":19,"analysis":32},892631,"单位工程竣工结算由（ ）编制。",[49,50,51,53],{"key":19,"text":24,"correct":28},{"key":23,"text":20,"correct":21},{"key":26,"text":52,"correct":21},"监理工程师",{"key":30,"text":54,"correct":21},"政府验收部门",{"id":56,"libraryId":5,"type":9,"typeLabel":15,"stem":57,"options":58,"answer":30,"analysis":32},892632,"关于单价子目的计量的说法，错误的是（ ）。",[59,61,63,65],{"key":19,"text":60,"correct":21},"承包人对已完成的工程进行计量，向监理人提交进度付款申请单、已完工程量报表和有关计量资料",{"key":23,"text":62,"correct":21},"监理人对承包人提交的工程量报表进行复核",{"key":26,"text":64,"correct":21},"对数量有异议的，可要求承包人进行共同复核和抽样复测",{"key":30,"text":66,"correct":28},"承包人完成工程量清单中每个子目的工程量后，监理工程师应要求承包人派员单独对每个子目的历次计量报表进行汇总",{"id":68,"libraryId":5,"type":9,"typeLabel":15,"stem":69,"options":70,"answer":30,"analysis":32},892633,"关于总价子目的分解和计量的说法，正确的是（ ）。",[71,73,75,77],{"key":19,"text":72,"correct":21},"总价子目的计量和支付应以总价为基础，需要根据物价变动因素而进行调整",{"key":23,"text":74,"correct":21},"承包人应按建设单位的要求对总价子目进行分解",{"key":26,"text":76,"correct":21},"建设单位对承包人提交的上述资料进行复核",{"key":30,"text":78,"correct":28},"总价子目的工程量是承包人用于结算的最终工程量",{"id":80,"libraryId":5,"type":9,"typeLabel":15,"stem":81,"options":82,"answer":30,"analysis":32},892634,"预付款从付款月后的6个月内在月进度付款中每月按该预付款金额的（ ）平均扣还。",[83,85,87,89],{"key":19,"text":84,"correct":21},"1\u002F3",{"key":23,"text":86,"correct":21},"1\u002F4",{"key":26,"text":88,"correct":21},"1\u002F5",{"key":30,"text":90,"correct":28},"1\u002F6",{"id":92,"libraryId":5,"type":9,"typeLabel":15,"stem":93,"options":94,"answer":26,"analysis":32},892635,"发包人应在监理人收到进度付款申请单后的（ ）天内，将进度应付款支付给承包人。",[95,97,99,101],{"key":19,"text":96,"correct":21},"7",{"key":23,"text":98,"correct":21},"14",{"key":26,"text":100,"correct":28},"28",{"key":30,"text":102,"correct":21},"30",{"id":104,"libraryId":5,"type":9,"typeLabel":15,"stem":105,"options":106,"answer":26,"analysis":32},892636,"根据《水利水电工程标准文件》中的合同条款，下列索赔事件中，承包人可以同时获得工期补偿和费用补偿的是（ ）。",[107,109,111,113],{"key":19,"text":108,"correct":21},"发包人要求承包人提前交付材料和工程设备",{"key":23,"text":110,"correct":21},"异常恶劣的气候条件",{"key":26,"text":112,"correct":28},"发包人原因引起的暂停施工",{"key":30,"text":114,"correct":21},"不可抗力",{"id":116,"libraryId":5,"type":9,"typeLabel":15,"stem":117,"options":118,"answer":30,"analysis":32},892637,"工程计量的原则不包括（ ）。",[119,121,123,125],{"key":19,"text":120,"correct":21},"不符合合同文件要求的工程不予计量",{"key":23,"text":122,"correct":21},"按合同文件所规定的方法、范围、内容和单位计量",{"key":26,"text":124,"correct":21},"因承包人原因造成的超出合同工程范围施工或返工的工程量，发包人不予计量",{"key":30,"text":126,"correct":28},"工程变更的工程量不予计量",{"id":128,"libraryId":5,"type":9,"typeLabel":15,"stem":129,"options":130,"answer":23,"analysis":32},892638,"关于工程计量的方法的说法，错误的是（ ）。",[131,133,135,136],{"key":19,"text":132,"correct":21},"工程计量可选择按月或按工程形象进度分段计量，具体计量周期在合同中约定",{"key":23,"text":134,"correct":28},"水利工程项目除专用合同条款另有约定外，单价子目已完成工程量按天计量",{"key":26,"text":124,"correct":21},{"key":30,"text":137,"correct":21},"总价子目的计量周期按批准的支付分解报告确定",{"id":139,"libraryId":5,"type":9,"typeLabel":15,"stem":140,"options":141,"answer":26,"analysis":32},892639,"承包人应在知道或应当知道索赔事件发生后（ ）天内，向监理人递交索赔意向通知书，并说明发生索赔事件的事由。",[142,143,144,145],{"key":19,"text":96,"correct":21},{"key":23,"text":98,"correct":21},{"key":26,"text":100,"correct":28},{"key":30,"text":102,"correct":21},{"id":147,"libraryId":5,"type":9,"typeLabel":15,"stem":148,"options":149,"answer":26,"analysis":32},892640,"承包人应按工程量清单的要求对总价子目进行分解，并在签订协议书后的（ ）内将各子目的总价支付分解表提交监理工程师审批。",[150,151,152,153],{"key":19,"text":96,"correct":21},{"key":23,"text":98,"correct":21},{"key":26,"text":100,"correct":28},{"key":30,"text":102,"correct":21},{"id":155,"libraryId":5,"type":9,"typeLabel":15,"stem":156,"options":157,"answer":19,"analysis":32},892641,"包工包料工程的预付款的支付比例不得低于签约合同价（扣除暂列金额）的（ ）。",[158,160,162,164],{"key":19,"text":159,"correct":28},"10%",{"key":23,"text":161,"correct":21},"20%",{"key":26,"text":163,"correct":21},"30%",{"key":30,"text":165,"correct":21},"40%",{"id":167,"libraryId":5,"type":9,"typeLabel":15,"stem":168,"options":169,"answer":30,"analysis":32},892642,"关于工程量偏差的说法，错误的是（ ）。",[170,172,174,176],{"key":19,"text":171,"correct":21},"单价项目的工程量增加超过合同约定幅度时，增加部分工程量的综合单价宜予调低",{"key":23,"text":173,"correct":21},"工程量减少超过合同约定幅度时，减少后剩余部分工程量的综合单价宜予调高",{"key":26,"text":175,"correct":21},"合同履行期间，当应予以计算的实际工程量与招标工程量清单出现偏差",{"key":30,"text":177,"correct":28},"引起相关一般项目相应发生变化，按合同计价原则调整一般项目费和（或）其他项目费时，发承包双方应调整合同价款",{"id":179,"libraryId":5,"type":9,"typeLabel":15,"stem":180,"options":181,"answer":19,"analysis":32},892643,"为了合理划分发承包双方的合同风险，施工合同中应当约定一个基准日，对于招标工程，一般以（ ）前的第28天作为基准日。",[182,184,186,188],{"key":19,"text":183,"correct":28},"投标截止",{"key":23,"text":185,"correct":21},"中标通知书发出",{"key":26,"text":187,"correct":21},"施工合同签订",{"key":30,"text":189,"correct":21},"施工组织设计批准",{"id":191,"libraryId":5,"type":9,"typeLabel":15,"stem":192,"options":193,"answer":23,"analysis":32},892644,"某工程项目合同规定，因人工、材料等价格波动影响合同价时，采用公式 计算差额，调整合同价格。规定定值权重A＝0.15，可调值因子有人工费、水泥、钢材和混凝土，其变值权重分别为0.2、0.1、0.25和0.3。各可调值因子的基本价格指数均为100。工程进展到某月结算时，该月完成合同金额100万元，无其他应扣或应支付款额，各可调值因子的现行价格指数是：人工费110，水泥105，钢材106，混凝土108，则按合同规定该月应调整的价格差额为（ ）万元。",[194,196,198,200],{"key":19,"text":195,"correct":21},"5.9",{"key":23,"text":197,"correct":28},"6.4",{"key":26,"text":199,"correct":21},"8.6",{"key":30,"text":201,"correct":21},"13.7",{"id":203,"libraryId":5,"type":9,"typeLabel":15,"stem":204,"options":205,"answer":19,"analysis":32},892645,"现场签证工作完成后（ ）内，承包人应按照现场签证内容计算价款。",[206,208,210,212],{"key":19,"text":207,"correct":28},"7d",{"key":23,"text":209,"correct":21},"14d",{"key":26,"text":211,"correct":21},"28d",{"key":30,"text":213,"correct":21},"30d",{"id":215,"libraryId":5,"type":9,"typeLabel":15,"stem":216,"options":217,"answer":26,"analysis":32},892646,"关于暂列金额，下列说法中正确的是（ ）。",[218,220,222,224],{"key":19,"text":219,"correct":21},"暂列金额是初步设计及概算内难以预料的费用",{"key":23,"text":221,"correct":21},"暂列金额的使用，必须事先得到监理人的许可并遵循其指示",{"key":26,"text":223,"correct":28},"暂列金额包括以计日工方式支付的金额",{"key":30,"text":225,"correct":21},"监理人可以视需要增加一笔暂列金额",{"id":227,"libraryId":5,"type":9,"typeLabel":15,"stem":228,"options":229,"answer":30,"analysis":32},892647,"采用计日工计价的任何一项工作，承包人应在该项的实施过程中，按合同约定提交的资料不包含（ ）。",[230,232,234,236],{"key":19,"text":231,"correct":21},"工作名称、内容和数量",{"key":23,"text":233,"correct":21},"投入该工作所有人员的姓名",{"key":26,"text":235,"correct":21},"投入该工作的施工设备型号",{"key":30,"text":237,"correct":28},"投入该工作的其他单位人员详细资料",{"id":239,"libraryId":5,"type":9,"typeLabel":15,"stem":240,"options":241,"answer":19,"analysis":32},892648,"关于工程计量的计算规则，下列说法正确的是（ ）。",[242,244,246,248],{"key":19,"text":243,"correct":28},"设计工程量为图纸工程量乘以工程量阶段系数",{"key":23,"text":245,"correct":21},"采用的规范或定额不同，工程量计算规则大致相同",{"key":26,"text":247,"correct":21},"工程量计价规则是工程量数值的取定方法",{"key":30,"text":249,"correct":21},"施工过程中一切非有效工程量发生的费用，不得摊入有效工程量的工程单价中",{"id":251,"libraryId":5,"type":9,"typeLabel":15,"stem":252,"options":253,"answer":23,"analysis":32},892649,"关于永久工程建筑工程量的说法，错误的是（ ）。",[254,256,258,260],{"key":19,"text":255,"correct":21},"若采用混凝土立模面系数乘以混凝土工程量计算模板工程量时，不再考虑模板阶段系数",{"key":23,"text":257,"correct":28},"若采用混凝土含钢率或含钢量乘以混凝土工程量计算钢筋工程量时，需要考虑钢筋阶段系数",{"key":26,"text":259,"correct":21},"截流工程的工程量阶段系数可取1.25～1.35",{"key":30,"text":261,"correct":21},"水利水电工程设计工程量阶段系数表中工程量是工程总工程量",{"id":263,"libraryId":5,"type":9,"typeLabel":15,"stem":264,"options":265,"answer":26,"analysis":32},892650,"枢纽工程对外公路工程量，初步设计阶段应根据不小于（ ）的地形图按设计确定的公路等级提出长度或具体工程量。",[266,268,270,272],{"key":19,"text":267,"correct":21},"1∶500",{"key":23,"text":269,"correct":21},"1∶1000",{"key":26,"text":271,"correct":28},"1∶5000",{"key":30,"text":273,"correct":21},"1∶10000",{"id":275,"libraryId":5,"type":9,"typeLabel":15,"stem":276,"options":277,"answer":19,"analysis":32},892651,"根据《水利水电工程设计工程量计算规定》（SL 328—2005），疏浚工程量的计算（ ）。",[278,280,282,284],{"key":19,"text":279,"correct":28},"按设计水下方计量，不计超挖及回淤量",{"key":23,"text":281,"correct":21},"按实际开挖计量，包含超挖及回淤量",{"key":26,"text":283,"correct":21},"按设计实体方计量，计入超挖量，不计回淤量",{"key":30,"text":285,"correct":21},"按设计开挖量计量，计入超挖量，不计回淤量",{"id":287,"libraryId":5,"type":9,"typeLabel":15,"stem":288,"options":289,"answer":26,"analysis":32},892652,"关于工程量的作用，下列说法不正确的是（ ）。",[290,292,294,296],{"key":19,"text":291,"correct":21},"是确定工程造价的重要依据",{"key":23,"text":293,"correct":21},"是建设单位管理工程建设的重要依据",{"key":26,"text":295,"correct":28},"是工程设计的决定性数据",{"key":30,"text":297,"correct":21},"是承包单位生产经营的重要依据",{"id":299,"libraryId":5,"type":9,"typeLabel":15,"stem":300,"options":301,"answer":26,"analysis":32},892653,"关于工程计量的基本原理，下列说法错误的是（ ）。",[302,304,306,308],{"key":19,"text":303,"correct":21},"工程量计算规则是工程计量的主要依据之一",{"key":23,"text":305,"correct":21},"工程量计算是工程计价活动的重要环节",{"key":26,"text":307,"correct":28},"工程量即工程的消耗量，是工程计量的结果",{"key":30,"text":309,"correct":21},"水利水电工程的工程量，是确定水利工程造价的重要依据",{"id":311,"libraryId":5,"type":9,"typeLabel":15,"stem":312,"options":313,"answer":30,"analysis":32},892654,"关于工程量计算的基本要求，下列说法错误的是（ ）。",[314,316,318,320],{"key":19,"text":315,"correct":21},"工程量计量单位的单位名称、单位符号，应符合《量和单位》的有关规定",{"key":23,"text":317,"correct":21},"项目建议书、可行性研究、初步设计阶段工程量的计算应该符合《水利水电工程设计工程量计算规定》的规定",{"key":26,"text":319,"correct":21},"招标投标阶段的工程量清单编制应执行《水利工程工程量清单计价规范》的规定",{"key":30,"text":321,"correct":28},"除定额另有规定外，工程量计算包括材料在建筑安装施工过程中的损耗量，计算安装工程中的装置性材料时，另按规定的损耗率计入工程单价",{"id":323,"libraryId":5,"type":9,"typeLabel":15,"stem":324,"options":325,"answer":30,"analysis":32},892655,"下列不属于施工损失量的是（ ）。",[326,328,330,332],{"key":19,"text":327,"correct":21},"运输损耗",{"key":23,"text":329,"correct":21},"操作损耗",{"key":26,"text":331,"correct":21},"体积变化损耗",{"key":30,"text":333,"correct":28},"物理损耗",{"id":335,"libraryId":5,"type":9,"typeLabel":15,"stem":336,"options":337,"answer":30,"analysis":32},892656,"包括了体积变化损失量、运输及操作损耗量和其他损耗量的水利工程工程量是（ ）。",[338,340,342,344],{"key":19,"text":339,"correct":21},"图纸工程量",{"key":23,"text":341,"correct":21},"设计工程量",{"key":26,"text":343,"correct":21},"施工超挖量",{"key":30,"text":345,"correct":28},"施工损失量",{"id":347,"libraryId":5,"type":9,"typeLabel":15,"stem":348,"options":349,"answer":30,"analysis":32},892657,"水利部批准发布的《水利水电工程设计工程量计算规定》（SL 328—2005）的正文部分不包括（ ）。",[350,352,354,356],{"key":19,"text":351,"correct":21},"总则",{"key":23,"text":353,"correct":21},"永久工程建筑工程量",{"key":26,"text":355,"correct":21},"施工临时工程工程量",{"key":30,"text":357,"correct":28},"混凝土结构工程量",{"id":359,"libraryId":5,"type":9,"typeLabel":15,"stem":360,"options":361,"answer":26,"analysis":32},892658,"关于混凝土地下连续墙的成槽和混凝土浇筑工程量的说法，错误的是（ ）。",[362,364,366,368],{"key":19,"text":363,"correct":21},"混凝土地下连续墙的成槽和混凝土浇筑工程量应分别计算",{"key":23,"text":365,"correct":21},"成槽工程量按不同墙厚、孔深和地层以面积计算",{"key":26,"text":367,"correct":28},"混凝土浇筑工程量，按不同墙厚和地层以成墙长度计算",{"key":30,"text":369,"correct":21},"混凝土浇筑和运输的工程量在定额中已进行换算",{"id":371,"libraryId":5,"type":9,"typeLabel":15,"stem":372,"options":373,"answer":30,"analysis":32},892659,"鉴于概算定额尚未颁布，工程概算单价应采用预算定额编制，考虑概算工作的深度和精度以及施工中允许的超挖、超填量，合理的施工附加量等的合理消耗，单价乘以（ ）扩大系数。",[374,376,378,380],{"key":19,"text":375,"correct":21},"2%",{"key":23,"text":377,"correct":21},"3%",{"key":26,"text":379,"correct":21},"4%",{"key":30,"text":381,"correct":28},"5%",{"id":383,"libraryId":5,"type":9,"typeLabel":15,"stem":384,"options":385,"answer":26,"analysis":32},892660,"以下不属于《水利水电设备安装工程概算定额》内容的是（ ）。",[386,388,390,392],{"key":19,"text":387,"correct":21},"电气设备安装",{"key":23,"text":389,"correct":21},"水轮发电机安装",{"key":26,"text":391,"correct":28},"钻孔灌浆",{"key":30,"text":393,"correct":21},"起重设备安装",{"id":395,"libraryId":5,"type":9,"typeLabel":15,"stem":396,"options":397,"answer":19,"analysis":32},892661,"（ ）是对水利工程实行静态控制、动态管理的基础。",[398,400,402,404],{"key":19,"text":399,"correct":28},"《水利工程设计概（估）算编制规定》",{"key":23,"text":401,"correct":21},"《水利工程概预算补充定额》",{"key":26,"text":403,"correct":21},"《水利工程施工机械台时费定额》",{"key":30,"text":405,"correct":21},"《水利水电设备安装工程预算定额》",{"id":407,"libraryId":5,"type":9,"typeLabel":15,"stem":408,"options":409,"answer":19,"analysis":32},892662,"生产运营（ ）后，进行项目后评价。",[410,412,414,416],{"key":19,"text":411,"correct":28},"1年",{"key":23,"text":413,"correct":21},"2年",{"key":26,"text":415,"correct":21},"3年",{"key":30,"text":417,"correct":21},"4年",{"id":419,"libraryId":5,"type":9,"typeLabel":15,"stem":420,"options":421,"answer":26,"analysis":32},892663,"项目建议书被批准后，由（ ）向社会公布。",[422,424,426,428],{"key":19,"text":423,"correct":21},"建设单位",{"key":23,"text":425,"correct":21},"监理单位",{"key":26,"text":427,"correct":28},"政府",{"key":30,"text":429,"correct":21},"可研单位",{"id":431,"libraryId":5,"type":9,"typeLabel":15,"stem":432,"options":433,"answer":19,"analysis":32},892664,"当开工准备基本就绪后，应由（ ）提出申请开工报告。",[434,436,438,439],{"key":19,"text":435,"correct":28},"项目法人",{"key":23,"text":437,"correct":21},"施工单位",{"key":26,"text":425,"correct":21},{"key":30,"text":440,"correct":21},"分包单位",{"id":442,"libraryId":5,"type":9,"typeLabel":15,"stem":443,"options":444,"answer":26,"analysis":32},892665,"关于竣工验收阶段的说法，错误的是（ ）。",[445,447,449,451],{"key":19,"text":446,"correct":21},"水利工程按照设计文件所规定的内容建成以后，在办理竣工验收以前，必须进行试运行",{"key":23,"text":448,"correct":21},"竣工验收的目的是全面考核建设成果，检查设计和施工质量",{"key":26,"text":450,"correct":28},"竣工验收包括单位工程验收和整个工程项目的全部验收",{"key":30,"text":452,"correct":21},"对于大型工程，因建设时间长或建设过程中逐步投产，应分批组织验收",{"id":454,"libraryId":5,"type":9,"typeLabel":15,"stem":455,"options":456,"answer":23,"analysis":32},892666,"（ ）是建设项目的“纲要”设计。",[457,459,461,463],{"key":19,"text":458,"correct":21},"招标设计",{"key":23,"text":460,"correct":28},"初步设计",{"key":26,"text":462,"correct":21},"施工图设计",{"key":30,"text":464,"correct":21},"施工方案设计",{"id":466,"libraryId":5,"type":9,"typeLabel":15,"stem":467,"options":468,"answer":30,"analysis":32},892667,"后评估阶段的内容不包括（ ）。",[469,471,473,475],{"key":19,"text":470,"correct":21},"影响评价",{"key":23,"text":472,"correct":21},"经济效益评价",{"key":26,"text":474,"correct":21},"过程评价",{"key":30,"text":476,"correct":28},"社会效益评价",{"id":478,"libraryId":5,"type":9,"typeLabel":15,"stem":479,"options":480,"answer":26,"analysis":32},892668,"投资估算主要建筑、安装工程单价编制与初步设计概算单价相同，一般均采用（ ）。",[481,483,485,487],{"key":19,"text":482,"correct":21},"施工定额",{"key":23,"text":484,"correct":21},"预算定额",{"key":26,"text":486,"correct":28},"概算定额",{"key":30,"text":488,"correct":21},"概算指标",{"id":490,"libraryId":5,"type":9,"typeLabel":15,"stem":491,"options":492,"answer":19,"analysis":32},892669,"采购及保管费按材料运到工地仓库价格的（ ）计算。",[493,495,496,498],{"key":19,"text":494,"correct":28},"2.5%",{"key":23,"text":377,"correct":21},{"key":26,"text":497,"correct":21},"3.5%",{"key":30,"text":381,"correct":21},{"id":500,"libraryId":5,"type":9,"typeLabel":15,"stem":501,"options":502,"answer":30,"analysis":32},892670,"施工用水价格组成不包括（ ）。",[503,505,507,509],{"key":19,"text":504,"correct":21},"基本水价",{"key":23,"text":506,"correct":21},"供水损耗",{"key":26,"text":508,"correct":21},"供水设施维修摊销费",{"key":30,"text":510,"correct":28},"供水设备费",{"id":512,"libraryId":5,"type":9,"typeLabel":15,"stem":513,"options":514,"answer":19,"analysis":32},892671,"冬雨期施工增加费按基本直接费的（ ）计算。",[515,517,519,521],{"key":19,"text":516,"correct":28},"1.0%",{"key":23,"text":518,"correct":21},"0.4%",{"key":26,"text":520,"correct":21},"0.6%",{"key":30,"text":494,"correct":21},{"id":523,"libraryId":5,"type":9,"typeLabel":15,"stem":524,"options":525,"answer":26,"analysis":32},892673,"以下计算公式错误的是（ ）。",[526,528,530,532],{"key":19,"text":527,"correct":21},"人工费＝定额劳动量（工日）×人工预算单价（元\u002F工日）",{"key":23,"text":529,"correct":21},"料费＝定额材料用量×材料预算单价（或材料基价）",{"key":26,"text":531,"correct":28},"税金＝（直接费＋利润＋材料价差＋未计价材料费）×税率",{"key":30,"text":533,"correct":21},"材料价差＝∑[定额材料消耗量×（材料预算价格－材料基价）]",{"id":535,"libraryId":5,"type":9,"typeLabel":15,"stem":536,"options":537,"answer":26,"analysis":32},892674,"（ ）按招标设计图示尺寸计算的有效面积计量。",[538,540,542,544],{"key":19,"text":539,"correct":21},"混凝土凿除",{"key":23,"text":541,"correct":21},"沥青混凝土",{"key":26,"text":543,"correct":28},"伸缩缝",{"key":30,"text":545,"correct":21},"止水工程",{"id":547,"libraryId":5,"type":9,"typeLabel":15,"stem":548,"options":549,"answer":30,"analysis":32},892675,"关于模板工程的说法，错误的是（ ）。",[550,552,554,556],{"key":19,"text":551,"correct":21},"立模面积为混凝土与模板的接触面积",{"key":23,"text":553,"correct":21},"不与混凝土面接触的模板面积不予计量",{"key":26,"text":555,"correct":21},"不构成混凝土永久结构、作为模板周转使用的预制混凝土模板，应计入吊运、吊装的费用",{"key":30,"text":557,"correct":28},"模板工程结算的工程量，按计划完成周转使用的有效立模面积计算",{"id":559,"libraryId":5,"type":9,"typeLabel":15,"stem":560,"options":561,"answer":30,"analysis":32},892676,"关于喷锚支护工程的说法，错误的是（ ）。",[562,564,566,568],{"key":19,"text":563,"correct":21},"钢支撑加工、钢支撑安装、钢筋格构架加工、钢筋格构架安装，按招标设计图示尺寸计算的钢支撑或钢筋格构架及附件的有效质量计量",{"key":23,"text":565,"correct":21},"喷浆按招标设计图示范同的有效面积计量",{"key":26,"text":567,"correct":21},"一般情况下钢支撑或钢筋格构架不拆除",{"key":30,"text":569,"correct":28},"计算钢支撑或钢筋格构架质量时，扣除孔眼的质量",{"id":571,"libraryId":5,"type":9,"typeLabel":15,"stem":572,"options":573,"answer":23,"analysis":32},892677,"下列不属于机电设备安装工程费的是（ ）。",[574,576,578,580],{"key":19,"text":575,"correct":21},"安装前的开箱检查费用",{"key":23,"text":577,"correct":28},"焊缝检查及处理费用",{"key":26,"text":579,"correct":21},"仓储保管费用",{"key":30,"text":581,"correct":21},"主体设备及随机成套供应的管路与附件安装费用",{"id":583,"libraryId":5,"type":9,"typeLabel":15,"stem":584,"options":585,"answer":26,"analysis":32},892678,"下列关于石方开挖工程的说法错误的是（ ）。",[586,588,590,592],{"key":19,"text":587,"correct":21},"超挖量和施工附加量所发生的费用，应摊入有效工程量的工程单价中",{"key":23,"text":589,"correct":21},"石方开挖均包括弃土运输的工作内容",{"key":26,"text":591,"correct":28},"开挖与运输在同一标段的工程，应分别选取开挖与运输的工作内容计量",{"key":30,"text":593,"correct":21},"石方开挖工程工程量除预裂爆破项目外按设计图示轮廓尺寸计算的有效自然方体积计量",{"id":595,"libraryId":5,"type":9,"typeLabel":15,"stem":596,"options":597,"answer":19,"analysis":32},892679,"关于安全监测设备采购及安装工程其他相关问题的处理，下列说法正确的是（ ）。",[598,600,602,604],{"key":19,"text":599,"correct":28},"在分类分项工程量清单中的单价或合价可分别以设备费、安装工程费分列表示",{"key":23,"text":601,"correct":21},"安全监测设备采购及安装工程项目编码的十至十二位均为000",{"key":26,"text":603,"correct":21},"安全监测设备采购及安装工程包括设备费和结构施工费",{"key":30,"text":605,"correct":21},"施工过程中仪表设备损耗备品备件等所发生的费用，不能摊入的工程单价中",[607,610,613,616,619,622],{"id":9,"name":608,"category":7,"favorite":609},"领导干部任职前廉政法规知识测试题",92,{"id":611,"name":612,"category":7,"favorite":9},595,"建筑结构与设备",{"id":614,"name":615,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":617,"name":618,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":620,"name":621,"category":7,"favorite":8},534,"BIM工程师",{"id":623,"name":621,"category":7,"favorite":8},535]