[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892879":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},892879,579,2,"多选题","环境保护工程投资包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","环境保护措施",true,{"key":16,"text":17,"correct":14},"B","环境监测设施",{"key":19,"text":20,"correct":14},"C","环境保护仪器设备及安装",{"key":22,"text":23,"correct":14},"D","环境保护预备费",{"key":25,"text":26,"correct":27},"E","安全文明施工费",false,"ABCD","环境保护工程投资包括环境保护措施、环境监测设施、环境保护仪器设备及安装、环境保护临时措施和环境保护独立费用，以及这五部分之外的环境保护预备费，是因工程兴建对环境造成的不利影响而需投入的资金。",{"id":6,"name":31,"category":32,"favorite":33},"[水利工程]建设工程计量与计价实务","建筑工程",0]