[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892869":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},892869,579,2,"多选题","生产准备费包含（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工程质量检测费",false,{"key":16,"text":17,"correct":18},"B","生产职工培训费",true,{"key":20,"text":21,"correct":18},"C","生产及管理单位提前进厂费",{"key":23,"text":24,"correct":18},"D","管理用具购置费",{"key":26,"text":27,"correct":18},"E","工器具及生产家具购置费","BCDE","生产准备费。①生产及管理单位提前进厂费。②生产职工培训费。③管理用具购置费。④工器具及生产家具购置费。",{"id":6,"name":31,"category":32,"favorite":33},"[水利工程]建设工程计量与计价实务","建筑工程",0]