[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892857":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},892857,579,2,"多选题","水利安装工程工程量清单项目包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","围护设备安装工程",false,{"key":16,"text":17,"correct":14},"B","地质勘测安装工程",{"key":19,"text":20,"correct":21},"C","安全监测设备采购及安装工程",true,{"key":23,"text":24,"correct":21},"D","机电设备安装工程",{"key":26,"text":27,"correct":21},"E","金属结构设备安装工程","CDE","水利安装工程工程量清单项目包括机电设备安装工程、金属结构设备安装工程和安全监测设备采购及安装工程三部分，56个子目。",{"id":6,"name":31,"category":32,"favorite":33},"[水利工程]建设工程计量与计价实务","建筑工程",0]