[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892845":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},892845,579,2,"多选题","影响施工超挖工程量的因素主要有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","施工方法",true,{"key":16,"text":17,"correct":14},"B","施工技术及管理水平",{"key":19,"text":20,"correct":21},"C","操作人员的理论知识",false,{"key":23,"text":24,"correct":21},"D","自然天气",{"key":26,"text":27,"correct":14},"E","地质条件","ABE","为保证建筑物的安全，施工开挖一般不允许欠挖，以保证建筑物的设计尺寸，施工超挖自然不可避免。影响施工超挖工程量的因素主要有施工方法、施工技术及管理水平、地质条件等。",{"id":6,"name":31,"category":32,"favorite":33},"[水利工程]建设工程计量与计价实务","建筑工程",0]