[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892841":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},892841,579,2,"多选题","关于钻孔灌浆与锚固工程工程量的计算，下列说法错误的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","地下工程的固结灌浆，其钻孔和灌浆工程量根据设计要求以体积计",true,{"key":16,"text":17,"correct":18},"B","回填灌浆工程量按设计的回填接触面积计算",false,{"key":20,"text":21,"correct":14},"C","接触灌浆和接缝灌浆的工程量，按设计接触面积计算",{"key":23,"text":24,"correct":18},"D","振冲桩应按不同孔深以桩长计算",{"key":26,"text":27,"correct":14},"E","钻机钻灌浆孔需明确钻孔上部岩石级别","ACE","钻孔灌浆与锚固工程工程量的计算应符合下列规定：①基础固结灌浆与帷幕灌浆工程量，自起灌基面算起，钻孔长度自实际孔顶高程算起。基础帷幕灌浆采用孔口封闭的，还应计算灌注孔口管的工程量，根据不同孔口管长度以孔为单位计算。地下工程的固结灌浆，其钻孔和灌浆工程量根据设计要求以长度计；②回填灌浆工程量按设计的回填接触面积计算；③接触灌浆和接缝灌浆的工程量，按设计所需面积计算；④振冲桩应按不同孔深以桩长计算；⑤钻机钻灌浆孔需明确钻孔部位岩石级别。",{"id":6,"name":31,"category":32,"favorite":33},"[水利工程]建设工程计量与计价实务","建筑工程",0]