[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892692":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},892692,579,1,"单选题","为便于进行工程单价分析，（ ）的设置应与所采用的定额相适应。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","一级项目",false,{"key":16,"text":17,"correct":14},"B","二级项目",{"key":19,"text":20,"correct":21},"C","三级项目",true,{"key":23,"text":24,"correct":14},"D","四级项目","水利工程项目划分应注意的问题包括：①为便于进行工程单价分析，三级项目的设置应与所采用的定额相适应。②注意不同设计专业、不同设计人员的习惯与工程项目划分的差异问题。",{"id":6,"name":27,"category":28,"favorite":29},"[水利工程]建设工程计量与计价实务","建筑工程",0]