[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892686":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},892686,579,1,"单选题","投标报价的编制方法是以（ ）为主。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","定额法",true,{"key":16,"text":17,"correct":18},"B","实物量法",false,{"key":20,"text":21,"correct":18},"C","工料单价法",{"key":23,"text":24,"correct":18},"D","清单计价法","投标报价的编制方法是以定额法为主、实物量法和其他方法为辅、多种方法并用的综合分析法。",{"id":6,"name":27,"category":28,"favorite":29},"[水利工程]建设工程计量与计价实务","建筑工程",0]