[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892680":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},892680,579,1,"单选题","下列不属于金属结构设备安装工程费的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","仓储保管费用",false,{"key":16,"text":17,"correct":14},"B","焊缝检查及处理费用",{"key":19,"text":20,"correct":14},"C","安装现场运输费用",{"key":22,"text":23,"correct":24},"D","设备回收费用",true,"金属结构设备安装工程费。包括设备及附属设备验收、接货、涂装、仓储保管、焊缝检查及处理、安装现场运输、设备本体和附件及埋件安装、设备安装调试、试运行、质量检查和验收、完工验收前的维护等工作内容所发生的费用。",{"id":6,"name":27,"category":28,"favorite":29},"[水利工程]建设工程计量与计价实务","建筑工程",0]