[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892678":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},892678,579,1,"单选题","下列关于石方开挖工程的说法错误的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","超挖量和施工附加量所发生的费用，应摊入有效工程量的工程单价中",false,{"key":16,"text":17,"correct":14},"B","石方开挖均包括弃土运输的工作内容",{"key":19,"text":20,"correct":21},"C","开挖与运输在同一标段的工程，应分别选取开挖与运输的工作内容计量",true,{"key":23,"text":24,"correct":14},"D","石方开挖工程工程量除预裂爆破项目外按设计图示轮廓尺寸计算的有效自然方体积计量","土方开挖工程，除场地平整按招标设计图示场地平整面积计量外，其他项目都按招标设计图示轮廓尺寸计算的有效自然方体积计量。施工过程中增加的超挖量和施工附加量所发生的费用，应摊入有效工程量的工程单价中。土方开挖工程清单项目均包括弃土运输的工作内容，开挖与运输不在同一标段的工程，应分别选取开挖与运输的工作内容计量。",{"id":6,"name":27,"category":28,"favorite":29},"[水利工程]建设工程计量与计价实务","建筑工程",0]