[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892675":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},892675,579,1,"单选题","关于模板工程的说法，错误的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","立模面积为混凝土与模板的接触面积",false,{"key":16,"text":17,"correct":14},"B","不与混凝土面接触的模板面积不予计量",{"key":19,"text":20,"correct":14},"C","不构成混凝土永久结构、作为模板周转使用的预制混凝土模板，应计入吊运、吊装的费用",{"key":22,"text":23,"correct":24},"D","模板工程结算的工程量，按计划完成周转使用的有效立模面积计算",true,"模板工程清单项目包括普通模板、滑动模板、移置模板、其他模板工程。模板工程结算的工程量，按实际完成周转使用的有效立模面积计算。",{"id":6,"name":27,"category":28,"favorite":29},"[水利工程]建设工程计量与计价实务","建筑工程",0]