[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892671":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},892671,579,1,"单选题","冬雨期施工增加费按基本直接费的（ ）计算。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1.0%",true,{"key":16,"text":17,"correct":18},"B","0.4%",false,{"key":20,"text":21,"correct":18},"C","0.6%",{"key":23,"text":24,"correct":18},"D","2.5%","其他直接费中，冬雨期施工增加费按基本直接费的1.0%计算。夜间施工增加费按基本直接费的百分率计算，建筑工程为0.4%，安装工程为0.6%。临时设施费按基本直接费的2.5%计算。",{"id":6,"name":27,"category":28,"favorite":29},"[水利工程]建设工程计量与计价实务","建筑工程",0]