[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892667":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},892667,579,1,"单选题","后评估阶段的内容不包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","影响评价",false,{"key":16,"text":17,"correct":14},"B","经济效益评价",{"key":19,"text":20,"correct":14},"C","过程评价",{"key":22,"text":23,"correct":24},"D","社会效益评价",true,"后评估是工程交付生产运行后一段时间内，一般经过1～2年生产运行后，对项目的立项决策、设计、施工、竣工验收、生产运行等全过程进行系统评估的一种技术经济活动。评估的主要包括以下内容：影响评价、经济效益评价和过程评价。",{"id":6,"name":27,"category":28,"favorite":29},"[水利工程]建设工程计量与计价实务","建筑工程",0]