[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-578-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":742},{"id":5,"name":6,"category":7,"favorite":8},578,"[交通运输工程]建设工程计量与计价实务","建筑工程",0,7,50,431,[13,38,53,68,83,98,113,128,142,157,172,187,202,216,231,245,260,275,290,304,318,333,347,361,375,389,403,417,432,446,460,475,489,503,517,531,545,560,573,587,601,615,629,643,658,672,686,700,714,728],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},892498,2,"多选题","人工种植灌木计量的工程内容包括（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","种植草皮",false,{"key":24,"text":25,"correct":26},"B","苗木栽植",true,{"key":28,"text":29,"correct":26},"C","换填种植土",{"key":31,"text":32,"correct":26},"D","废弃物装卸运输",{"key":34,"text":35,"correct":26},"E","除杂草","BCDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},892499,"填石路堤施工前，通过修筑试验路段来确定的路堤施工的相应孔隙率标准的参数有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"松铺厚度",{"key":24,"text":45,"correct":26},"压实机械型号及组合",{"key":28,"text":47,"correct":22},"整平机械型号及整平速度",{"key":31,"text":49,"correct":26},"压实速度及压实遍数",{"key":34,"text":51,"correct":22},"孔隙率","ABD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},892500,"关于软土地区路基施工主要的处理方法，以下说法正确的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"浅层处置法适用于表层软土厚度小于5m的浅层软弱地基处理",{"key":24,"text":60,"correct":22},"垫层处理法中垫层处理深度不宜大于2m",{"key":28,"text":62,"correct":26},"竖向排水法在处理淤泥质土和淤泥地基时，宜与预压法联合使用",{"key":31,"text":64,"correct":26},"预压法分真空预压和超载预压两种",{"key":34,"text":66,"correct":26},"加固土桩法以水泥、石灰、粉煤灰等材料作固化剂的主剂","CDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},892501,"关于重力式挡土墙施工，以下说法错误的有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"墙身应整体砌筑",{"key":24,"text":75,"correct":22},"伸缩缝与沉降缝内两侧壁应竖直平齐，无错叠",{"key":28,"text":77,"correct":22},"泄水孔应在砌筑墙身过程中设置",{"key":31,"text":79,"correct":26},"当墙身的强度达到设计强度的90%时方可进行回填等工作",{"key":34,"text":81,"correct":22},"在距墙背0.5～1m以内时，不宜用重型压路机碾压","AD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},892502,"关于截水沟施工，以下说法正确的有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"截水沟应后施工，与其他排水设施应衔接平顺",{"key":24,"text":90,"correct":26},"截水沟应离开弃土堆脚1～5m",{"key":28,"text":92,"correct":22},"山坡上路堤的截水沟离开路堤坡脚至少10m",{"key":31,"text":94,"correct":26},"修筑向沟倾斜坡度为2%的护坡道或土台，使路堤内侧地面水流入截水沟排出",{"key":34,"text":96,"correct":26},"截水沟长度一般不宜超过500m","BDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},892503,"下列关于填石渗沟的说法符合施工规定的有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"渗水材料的顶面（指封闭层以下）不得低于原地下水位",{"key":24,"text":105,"correct":22},"砂宜采用粉砂、细砂，含泥量应小于2%",{"key":28,"text":107,"correct":26},"用于排除层间水时，渗沟底部应埋置在最下面的不透水层",{"key":31,"text":109,"correct":26},"在冰冻地区，渗沟埋置深度不得小于当地最小冻结深度",{"key":34,"text":111,"correct":26},"填石渗沟纵坡不宜小于1%","ACDE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},892504,"下列粒料类基层中，属于嵌锁型的包括（ ）。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"级配碎石",{"key":24,"text":120,"correct":26},"泥结碎石",{"key":28,"text":122,"correct":26},"泥灰结碎石",{"key":31,"text":124,"correct":22},"天然砂砾",{"key":34,"text":126,"correct":26},"填隙碎石","BCE",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":67,"analysis":37},892505,"关于热拌沥青碎石施工，以下说法正确的有（ ）。",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"沥青混合料必须在沥青拌合场拌制，必须使用间歇式拌合机",{"key":24,"text":135,"correct":22},"热拌沥青混合料应采用较小吨位的自卸汽车运输",{"key":28,"text":137,"correct":26},"运料车应用篷布覆盖，用以保温、防雨、防污染",{"key":31,"text":139,"correct":26},"当高速公路和一级公路施工气温低于10℃、其他等级公路施工气温低于5℃时，不宜摊铺热拌沥青混合料",{"key":34,"text":141,"correct":26},"沥青混合料的分层压实厚度不得大于10cm",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},892506,"封层按施工类型可分为可采用拌和法或层铺法的单层式表面处置，下列关于封层的施工说法正确的有（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"下封层的厚度不宜大于6mm",{"key":24,"text":149,"correct":26},"封层施工前较宽的裂缝应清理灌缝",{"key":28,"text":151,"correct":26},"封层宜选在干燥或较热的季节施工",{"key":31,"text":153,"correct":22},"矿料级配应根据封层的目的、道路等级进行选择",{"key":34,"text":155,"correct":22},"稀浆封层两幅纵缝搭接宽度不宜超过60mm，横向接缝宜为对接缝","BC",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},892507,"下列关于路面工程的说法错误的有（ ）。",[161,163,165,167,169],{"key":20,"text":162,"correct":26},"混凝土板达到设计强度30%后，行人方可通行",{"key":24,"text":164,"correct":22},"沥青混合料的机械摊铺松铺系数为1.15～1.30",{"key":28,"text":166,"correct":26},"改性沥青混合料一般应在温度降至100℃前结束碾压作业",{"key":31,"text":168,"correct":22},"黏层所使用的基层基质沥青等级宜与主层沥青混合料相同",{"key":34,"text":170,"correct":22},"路面结构层自下而上依次为：垫层、底基层、基层、面层","AC",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":186,"analysis":37},892508,"下列关于模板、拱架和支架的设计及施工说法错误的有（ ）。",[176,178,180,182,184],{"key":20,"text":177,"correct":22},"外露面模板板面宜采用胶合板",{"key":24,"text":179,"correct":26},"模板拆除应先支先拆，后支后拆",{"key":28,"text":181,"correct":22},"拱架需验算强度、刚度及稳定性",{"key":31,"text":183,"correct":22},"模板板面应保证结构物线条流畅",{"key":34,"text":185,"correct":26},"大面积混凝土每块模板的面积宜小于10m2","BE",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":201,"analysis":37},892509,"下列关于预应力混凝土施工的说法，错误的有（ ）。",[191,193,195,197,199],{"key":20,"text":192,"correct":26},"锚具只能满足整束张拉的要求",{"key":24,"text":194,"correct":22},"锚垫板下应有配套的局部加强钢筋",{"key":28,"text":196,"correct":26},"预应力筋的刚性管道是波纹状的金属管",{"key":31,"text":198,"correct":22},"后张构件应避免振动器碰撞预应力钢筋的管道、预埋件",{"key":34,"text":200,"correct":26},"金属波纹管宜采用镀锌扁钢带制作且壁厚不宜小于0.2mm","ACE",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":127,"analysis":37},892510,"下列关于基坑工程施工的说法，正确的有（ ）。",[206,208,210,212,214],{"key":20,"text":207,"correct":22},"孔底注浆的压力不得小于0.5MPa",{"key":24,"text":209,"correct":26},"当支护结构受力过大时，应加设临时支撑",{"key":28,"text":211,"correct":26},"放坡开挖场地受到限制时应对坑壁进行支护",{"key":31,"text":213,"correct":22},"基坑坑壁采用喷射混凝土加固时，施工前不需验证",{"key":34,"text":215,"correct":26},"基坑较浅且渗水量不大时可采用竹排对坑壁进行支护",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":230,"analysis":37},892511,"下列关于明挖扩大基础施工的说法，正确的有（ ）。",[220,222,224,226,228],{"key":20,"text":221,"correct":22},"孔深＞3m时，宜先注浆后插入锚杆",{"key":24,"text":223,"correct":26},"开挖过程中排水时应不对基坑的安全产生影响",{"key":28,"text":225,"correct":26},"基底超挖时应清除松动部分，并对基底进行处理",{"key":31,"text":227,"correct":26},"坑壁或边坡上有明显出水点时，应设置导管排水",{"key":34,"text":229,"correct":22},"扩大基础基底为岩石时，施工前应润湿并浇筑混凝土垫层","BCD",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":67,"analysis":37},892512,"关于钻孔灌注桩施工，下列说法错误的有（ ）。",[235,237,239,241,243],{"key":20,"text":236,"correct":22},"护筒埋置深度在旱地宜为2～4m",{"key":24,"text":238,"correct":22},"首批混凝土入孔后，应连续灌注，不得中断",{"key":28,"text":240,"correct":26},"钢筋笼外侧控制保护层厚度的垫块竖向间距为2.5m",{"key":31,"text":242,"correct":26},"冲击钻进过程中孔内水位应高于护筒底口100mm以上",{"key":34,"text":244,"correct":26},"水下混凝土的灌注时间不得超过首批混凝土的终凝时间",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":259,"analysis":37},892513,"关于桩基和承台施工，下列说法正确的有（ ）。",[249,251,253,255,257],{"key":20,"text":250,"correct":26},"桩头预留钢筋上的泥土及鳞锈等应清理干净",{"key":24,"text":252,"correct":26},"承台基地为软弱土层时，应按设计要求采取措施",{"key":28,"text":254,"correct":26},"承台施工前，应进行桩基等隐蔽工程的质量验收",{"key":31,"text":256,"correct":26},"沉桩施工方法主要有锤击沉桩、振动沉桩、射水沉桩",{"key":34,"text":258,"correct":22},"挖孔灌注桩孔口处应设置高出地面至少200mm的护圈","ABCD",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":274,"analysis":37},892514,"关于桥墩与桥台施工，下列说法正确的有（ ）。",[264,266,268,270,272],{"key":20,"text":265,"correct":26},"墩台养护时间不少于7天",{"key":24,"text":267,"correct":26},"钢筋施工时其分节高度不宜大于9m",{"key":28,"text":269,"correct":22},"钢筋与模板之间厚度正偏差不得大于3mm",{"key":31,"text":271,"correct":22},"轻型墩台设置沉降缝应与基础沉降缝保持垂直",{"key":34,"text":273,"correct":26},"每级混凝土浇筑前应将已浇混凝土表面凿毛处理","ABE",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":289,"analysis":37},892515,"上部结构的施工方法可分为预制拼装和现浇两大类，桥梁上部结构预制安装方法包括（ ）。",[279,281,283,285,287],{"key":20,"text":280,"correct":26},"预制梁安装",{"key":24,"text":282,"correct":22},"预制墩安装",{"key":28,"text":284,"correct":22},"预制承台安装",{"key":31,"text":286,"correct":26},"整跨箱梁预制吊装",{"key":34,"text":288,"correct":26},"预制节段式块件拼装","ADE",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":127,"analysis":37},892516,"下列关于桥梁上部结构施工的说法，正确的有（ ）。",[294,296,298,300,302],{"key":20,"text":295,"correct":22},"悬臂现浇法需要建立落地支架",{"key":24,"text":297,"correct":26},"悬臂拼装法适用于工期较短的工程",{"key":28,"text":299,"correct":26},"劲性骨架可作为主拱结构承重部分",{"key":31,"text":301,"correct":22},"转体法不可用于斜拉桥和刚构桥施工",{"key":34,"text":303,"correct":26},"悬臂现浇法适用于大跨径的连续梁桥施工",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":52,"analysis":37},892517,"斜拉桥索塔现浇施工的方法包括（ ）。",[308,310,312,314,316],{"key":20,"text":309,"correct":26},"翻模法",{"key":24,"text":311,"correct":26},"爬模法",{"key":28,"text":313,"correct":22},"顶推法",{"key":31,"text":315,"correct":26},"滑模法",{"key":34,"text":317,"correct":22},"悬臂现浇法",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":332,"analysis":37},892518,"下列关于斜拉桥拉索施工的说法中错误的有（ ）。",[322,324,326,328,330],{"key":20,"text":323,"correct":22},"拉索可在塔端或梁端单端进行张拉",{"key":24,"text":325,"correct":22},"张拉拉索时应采用专门设计制作的施工平台",{"key":28,"text":327,"correct":26},"张拉时应按索塔的顺桥向两侧对称不同步进行",{"key":31,"text":329,"correct":26},"千斤顶同步之差不得小于油表读数的最小分格",{"key":34,"text":331,"correct":22},"设计拉力不同的拉索应按设计规定的索力分级同步张拉","CD",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":67,"analysis":37},892519,"下列关于斜拉桥施工的说法中正确的有（ ）。",[337,339,341,343,345],{"key":20,"text":338,"correct":22},"斜拉桥可看作多跨弹塑性支承连续梁",{"key":24,"text":340,"correct":22},"湿接缝混凝土浇筑后的养护时间应不少于3天",{"key":28,"text":342,"correct":26},"漂浮体系斜拉桥主梁施工期间塔梁应临时固结",{"key":31,"text":344,"correct":26},"钢主梁制造完成后应在工厂进行试拼装和涂装",{"key":34,"text":346,"correct":26},"主梁合龙期间桥面上临时施工荷载应严格控制",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":112,"analysis":37},892520,"悬索桥是利用主缆和吊索作为加劲梁的悬吊体系，将荷载作用传递到索塔和锚碇的桥梁，其施工步骤包括（ ）。",[351,353,355,357,359],{"key":20,"text":352,"correct":26},"桥面系施工",{"key":24,"text":354,"correct":22},"斜拉索安装",{"key":28,"text":356,"correct":26},"上部结构安装",{"key":31,"text":358,"correct":26},"索塔、锚碇施工",{"key":34,"text":360,"correct":26},"索塔、锚碇基础施工",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":52,"analysis":37},892521,"下列属于拱式桥施工常用拱架的有（ ）。",[365,367,369,371,373],{"key":20,"text":366,"correct":26},"土牛拱",{"key":24,"text":368,"correct":26},"木拱架",{"key":28,"text":370,"correct":22},"混凝土拱架",{"key":31,"text":372,"correct":26},"钢拱架",{"key":34,"text":374,"correct":22},"角钢拱架",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":274,"analysis":37},892522,"根据隧道穿越地层的不同情况和目前隧道施工技术的发展，浅埋及软土隧道的施工方法包括（ ）。",[379,381,383,385,387],{"key":20,"text":380,"correct":26},"明挖法",{"key":24,"text":382,"correct":26},"盾构法",{"key":28,"text":384,"correct":22},"沉管法",{"key":31,"text":386,"correct":22},"新奥法",{"key":34,"text":388,"correct":26},"浅埋暗挖法",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":332,"analysis":37},892523,"关于新奥法施工，下列说法错误的有（ ）。",[393,395,397,399,401],{"key":20,"text":394,"correct":22},"新奥法施工过程主要是开挖、喷锚、模筑混凝土",{"key":24,"text":396,"correct":22},"新奥法通过监测控制围岩的变形以充分发挥围岩自承能力",{"key":28,"text":398,"correct":26},"初次柔性支护，是在洞身开挖之前必须立即进行的支护工作",{"key":31,"text":400,"correct":26},"新奥法以喷射混凝土和锚杆作为辅助支护手段",{"key":34,"text":402,"correct":22},"装饰是整个隧道贯通之后才进行的",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":201,"analysis":37},892524,"二次衬砌可以与初期支护共同组成复合式衬砌。下列关于二次衬砌施工的说法正确的有（ ）。",[407,409,411,413,415],{"key":20,"text":408,"correct":26},"仰拱应先于衬砌浇筑完成",{"key":24,"text":410,"correct":22},"浇筑仰拱从仰拱两侧向中心对称进行",{"key":28,"text":412,"correct":26},"二次衬砌必须重视模筑混凝土的抗冻性",{"key":31,"text":414,"correct":22},"隧道纵向需分段浇筑，分段长度为8～10m",{"key":34,"text":416,"correct":26},"全断面开挖隧道应尽量使用混凝土整体衬砌",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":431,"analysis":37},892525,"隧道施工的防、排水以“防、截、排、堵相结合，因地制宜、综合治理”为原则，下列关于隧道防排水设施的说法错误的有（ ）。",[421,423,425,427,429],{"key":20,"text":422,"correct":26},"坡顶的截水沟应在洞口开挖后修建",{"key":24,"text":424,"correct":26},"洞内反坡排水时。不能采取水泵抽水",{"key":28,"text":426,"correct":26},"防水板搭接应保证防水层与喷层完全密贴",{"key":31,"text":428,"correct":22},"洞内大面积渗漏水宜采用钻孔将水引入排水沟",{"key":34,"text":430,"correct":22},"隧道施工中应根据实际情况完善防、排水措施","ABC",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":127,"analysis":37},892526,"下列关于通风防尘及水电施工的说法错误的有（ ）。",[436,438,440,442,444],{"key":20,"text":437,"correct":22},"瓦斯地段应采用防爆型照明器材",{"key":24,"text":439,"correct":26},"瓦斯地段照明电压不得超过220V",{"key":28,"text":441,"correct":26},"凿岩机在钻眼时，必须先送风后送水",{"key":31,"text":443,"correct":22},"巷道式通风适用于有平行坑道的长隧道",{"key":34,"text":445,"correct":26},"防尘措施不能达到规定标准时允许采用干式凿岩",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":289,"analysis":37},892527,"下列供电线路布置和安装符合要求的有（ ）。",[450,452,454,456,458],{"key":20,"text":451,"correct":26},"竖井使用铠装电缆",{"key":24,"text":453,"correct":22},"瓦斯地段的电缆悬空架设",{"key":28,"text":455,"correct":22},"瓦斯地段的输电线使用皮线",{"key":31,"text":457,"correct":26},"施工地段的临时电线路采用橡套电缆",{"key":34,"text":459,"correct":26},"竖井内的电气装置有可靠的切换装置",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":474,"analysis":37},892528,"隧道地质超前预报方法主要有地质调查法和（ ）。",[464,466,468,470,472],{"key":20,"text":465,"correct":26},"物理勘探法",{"key":24,"text":467,"correct":26},"超前导坑法",{"key":28,"text":469,"correct":26},"超前钻探法",{"key":31,"text":471,"correct":22},"化学勘探法",{"key":34,"text":473,"correct":26},"水力联系观测法","ABCE",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":112,"analysis":37},892529,"下列属于填石路堤的填筑方法的有（ ）。",[479,481,483,485,487],{"key":20,"text":480,"correct":26},"倾填法",{"key":24,"text":482,"correct":22},"横向填筑法",{"key":28,"text":484,"correct":26},"碾压法",{"key":31,"text":486,"correct":26},"冲击压实法",{"key":34,"text":488,"correct":26},"强力夯实法",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":274,"analysis":37},892530,"下列关于膨胀土路基施工的说法正确的有（ ）。",[493,495,497,499,501],{"key":20,"text":494,"correct":26},"膨胀土地区路基施工，应避开雨季作业，加强现场排水",{"key":24,"text":496,"correct":26},"强膨胀土不得作为路堤填料",{"key":28,"text":498,"correct":22},"胀缩总率超过0.7%的弱膨胀土可直接填筑",{"key":31,"text":500,"correct":22},"膨胀土地区路堑施工中，边坡要一次挖到设计线",{"key":34,"text":502,"correct":26},"填筑膨胀土路堤时，应及时对路堤边坡及顶面进行防护",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":259,"analysis":37},892531,"排除滑坡地下水的设施有（ ）。",[507,509,511,513,515],{"key":20,"text":508,"correct":26},"支撑渗沟",{"key":24,"text":510,"correct":26},"边坡渗沟",{"key":28,"text":512,"correct":26},"暗沟",{"key":31,"text":514,"correct":26},"平孔",{"key":34,"text":516,"correct":22},"天沟",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":82,"analysis":37},892532,"关于路基支挡工程中的挡土墙施工的相关说法中，正确的有（ ）。",[521,523,525,527,529],{"key":20,"text":522,"correct":26},"挡土墙施工宜避开雨季，并做好截、排水及防渗设施",{"key":24,"text":524,"correct":22},"重力式挡土墙的泄水孔应在砌筑墙身之前设置，确保排水通畅",{"key":28,"text":526,"correct":22},"钢筋混凝土悬臂式挡土墙采用整体浇筑时，需分两次完成混凝土灌注",{"key":31,"text":528,"correct":26},"锚定板挡土墙具有结构轻、柔性大的特点",{"key":34,"text":530,"correct":22},"加筋土挡土墙适宜用在挖方路段或地形陡峭的山坡",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":201,"analysis":37},892533,"下面适用于各级公路的基层和底基层的是（ ）。",[535,537,539,541,543],{"key":20,"text":536,"correct":26},"水泥稳定碎石",{"key":24,"text":538,"correct":22},"石灰稳定土",{"key":28,"text":540,"correct":26},"水泥稳定土",{"key":31,"text":542,"correct":22},"石灰粉煤灰土",{"key":34,"text":544,"correct":26},"石灰粉煤灰碎石",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":559,"analysis":37},892534,"关于钢筋工程施工，以下说法正确的有（ ）。",[549,551,553,555,557],{"key":20,"text":550,"correct":26},"钢筋应具有出厂质量证明书和试验报告单",{"key":24,"text":552,"correct":22},"进场时主要检查其外观和标志",{"key":28,"text":554,"correct":26},"钢筋在运输过程中应避免锈蚀、污染或被压弯",{"key":31,"text":556,"correct":26},"在工地存放时，应按不同品种、规格，分批分别堆置整齐，不得混杂",{"key":34,"text":558,"correct":22},"存放的时间不宜超过3个月","ACD",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":97,"analysis":37},892535,"关于灌注水下混凝土，以下说法正确的有（ ）。",[564,566,568,569,571],{"key":20,"text":565,"correct":22},"水下混凝土配制，粗集料宜选用砾石",{"key":24,"text":567,"correct":26},"当桩径D＜1.5m时，其坍落度宜为180～220mm",{"key":28,"text":244,"correct":22},{"key":31,"text":570,"correct":26},"首批灌注混凝土的数量应能满足导管首次埋置深度1.0m以上的需要",{"key":34,"text":572,"correct":26},"在灌注中，应保持孔内的水头高度，导管的埋置深度宜控制在2～6m",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":201,"analysis":37},892536,"下列关于钢筋工程施工的说法，正确的有（ ）。",[577,579,581,583,585],{"key":20,"text":578,"correct":26},"钢筋使用前表明的鳞锈应清除干净",{"key":24,"text":580,"correct":22},"钢筋绑扎连接的直径不宜小于28mm",{"key":28,"text":582,"correct":26},"钢筋外表有裂纹夹砂缺陷时不得使用",{"key":31,"text":584,"correct":22},"受力钢筋焊接或绑扎接头应设置在内力较大处",{"key":34,"text":586,"correct":26},"偏心受压构件的受压钢筋绑扎连接直径不大于32mm",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":127,"analysis":37},892537,"关于墩台模板施工，下列说法正确的有（ ）。",[591,593,595,597,599],{"key":20,"text":592,"correct":22},"脚手架工作平台下铺木板，上挂安全网",{"key":24,"text":594,"correct":26},"模板在安装过程中应设置防倾覆措施",{"key":28,"text":596,"correct":26},"模板安装应保证高墩的垂直度满足规范的要求",{"key":31,"text":598,"correct":22},"模板分段整体吊装时根据模板高度确定分段尺寸",{"key":34,"text":600,"correct":26},"高墩施工宜采用翻转模板、爬升模板或滑升模板",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":289,"analysis":37},892538,"斜拉桥的主梁结构采用混凝土结构、钢结构或者钢混组合结构，下列关于斜拉桥主梁的说法中正确的有（ ）。",[605,607,609,611,613],{"key":20,"text":606,"correct":26},"按截面形式分为开口和闭口截面",{"key":24,"text":608,"correct":22},"斜拉桥的主梁跨越能力小于梁式桥",{"key":28,"text":610,"correct":22},"相比梁式桥，斜拉桥的主梁高跨比较大",{"key":31,"text":612,"correct":26},"钢混组合梁安装时不得破坏剪力连接装置",{"key":34,"text":614,"correct":26},"钢混组合梁的湿接缝采用微膨胀低收缩混凝土",{"id":616,"libraryId":5,"type":15,"typeLabel":16,"stem":617,"options":618,"answer":67,"analysis":37},892539,"明洞工程应先施工完成，为加速隧道施工创造条件。下列关于明洞工程施工的说法，错误的有（ ）。",[619,621,623,625,627],{"key":20,"text":620,"correct":22},"防水层敷设搭接长度不小于100mm",{"key":24,"text":622,"correct":22},"边坡松软易坍塌宜采用先拱后墙法",{"key":28,"text":624,"correct":26},"仰坡易坍塌时宜由内向外进行施工",{"key":31,"text":626,"correct":26},"顶部两侧回填的土面高差不得大于0.3m",{"key":34,"text":628,"correct":26},"人工填筑拱顶中心回填高度达到0.6m时拆除拱架",{"id":630,"libraryId":5,"type":15,"typeLabel":16,"stem":631,"options":632,"answer":559,"analysis":37},892540,"隧道施工过程中，当遇到软弱破碎围岩时，其自支护能力是比较弱的，经常采用的超前支护措施有超前锚杆和（ ）等。",[633,635,637,639,641],{"key":20,"text":634,"correct":26},"管棚支护",{"key":24,"text":636,"correct":22},"管桩支护",{"key":28,"text":638,"correct":26},"预注浆方法",{"key":31,"text":640,"correct":26},"超前小导管",{"key":34,"text":642,"correct":22},"超前大导管",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":657,"analysis":37},892541,"轨道式水泥混凝土摊铺机由下列哪些机械组成？（ ）",[647,649,651,653,655],{"key":20,"text":648,"correct":26},"布料机",{"key":24,"text":650,"correct":26},"振实机",{"key":28,"text":652,"correct":22},"拌料机",{"key":31,"text":654,"correct":26},"整平机",{"key":34,"text":656,"correct":26},"表面抹光机","ABDE",{"id":659,"libraryId":5,"type":15,"typeLabel":16,"stem":660,"options":661,"answer":559,"analysis":37},892542,"按行走装置的不同，单斗挖掘机可分为（ ）。",[662,664,666,668,670],{"key":20,"text":663,"correct":26},"履带式",{"key":24,"text":665,"correct":22},"正铲挖掘机",{"key":28,"text":667,"correct":26},"轮胎式",{"key":31,"text":669,"correct":26},"汽车式",{"key":34,"text":671,"correct":22},"拉铲挖掘机",{"id":673,"libraryId":5,"type":15,"typeLabel":16,"stem":674,"options":675,"answer":431,"analysis":37},892543,"混凝土搅拌机根据其结构形式可分为（ ）。",[676,678,680,682,684],{"key":20,"text":677,"correct":26},"鼓筒式",{"key":24,"text":679,"correct":26},"双锥反转出料式",{"key":28,"text":681,"correct":26},"强制式",{"key":31,"text":683,"correct":22},"半强制式",{"key":34,"text":685,"correct":22},"密闭式",{"id":687,"libraryId":5,"type":15,"typeLabel":16,"stem":688,"options":689,"answer":52,"analysis":37},892544,"施工机械一般检验的方法和步骤可分为（ ）。",[690,692,694,696,698],{"key":20,"text":691,"correct":26},"外部检验",{"key":24,"text":693,"correct":26},"空运转试验",{"key":28,"text":695,"correct":22},"内部检验",{"key":31,"text":697,"correct":26},"重载试验",{"key":34,"text":699,"correct":22},"联合试运行试验",{"id":701,"libraryId":5,"type":15,"typeLabel":16,"stem":702,"options":703,"answer":201,"analysis":37},892545,"公路施工组织设计中的资源组织计划包括（ ）。",[704,706,708,710,712],{"key":20,"text":705,"correct":26},"劳动力配置计划",{"key":24,"text":707,"correct":22},"辅助材料计划",{"key":28,"text":709,"correct":26},"主要施工机具、设备计划",{"key":31,"text":711,"correct":22},"永久工程计划",{"key":34,"text":713,"correct":26},"技术组织措施计划",{"id":715,"libraryId":5,"type":15,"typeLabel":16,"stem":716,"options":717,"answer":657,"analysis":37},892546,"现代工程管理的总体要求的指导思想包括（ ）。",[718,720,722,724,726],{"key":20,"text":719,"correct":26},"发展理念人本化",{"key":24,"text":721,"correct":26},"项目管理专业化",{"key":28,"text":723,"correct":22},"工程成本最小化",{"key":31,"text":725,"correct":26},"工程施工标准化",{"key":34,"text":727,"correct":26},"日常管理精细化",{"id":729,"libraryId":5,"type":15,"typeLabel":16,"stem":730,"options":731,"answer":97,"analysis":37},892547,"施工组织设计分为标前设计和标后设计，下列关于二者区别的说法正确的有（ ）。",[732,734,736,738,740],{"key":20,"text":733,"correct":22},"标前设计服务于投标，标后设计服务于签约至验收",{"key":24,"text":735,"correct":26},"标前设计编制于投标书编制前，标后设计编制于签约后开工前",{"key":28,"text":737,"correct":22},"标前设计由项目管理层编制，标后设计由经营管理层编制",{"key":31,"text":739,"correct":26},"标前设计具有规划性，标后设计具有作业性",{"key":34,"text":741,"correct":26},"标前设计追求中标和经济效益，标后设计追求施工效率和效益",[743,747,750,753,756,759],{"id":744,"name":745,"category":7,"favorite":746},1,"领导干部任职前廉政法规知识测试题",92,{"id":748,"name":749,"category":7,"favorite":744},595,"建筑结构与设备",{"id":751,"name":752,"category":7,"favorite":744},715,"招标采购专业知识与法律法规",{"id":754,"name":755,"category":7,"favorite":744},848,"市政方向-通用基础",{"id":757,"name":758,"category":7,"favorite":8},534,"BIM工程师",{"id":760,"name":758,"category":7,"favorite":8},535]