[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-578-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":730},{"id":5,"name":6,"category":7,"favorite":8},578,"[交通运输工程]建设工程计量与计价实务","建筑工程",0,6,50,431,[13,34,46,64,79,94,109,123,137,152,167,180,194,209,224,238,253,267,282,297,311,326,340,354,369,383,397,411,426,440,454,468,482,496,510,524,538,552,566,580,593,607,621,635,648,662,676,690,703,716],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},892448,1,"单选题","水泥的（ ）是混凝土产生凝结的主要原因。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","水化反应",true,{"key":24,"text":25,"correct":26},"B","热化反应",false,{"key":28,"text":29,"correct":26},"C","氧化反应",{"key":31,"text":32,"correct":26},"D","气化反应","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},892449,"关于混凝土的抗渗性，说法错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"混凝土的抗渗性以抗渗等级来表示",{"key":24,"text":41,"correct":26},"采用标准养护28d的试件，按规定的方法进行试验",{"key":28,"text":43,"correct":22},"按混凝土所能承受的最大水压力，将混凝土的抗渗等级分为四个等级",{"key":31,"text":45,"correct":26},"渗透性能是混凝土耐久性的重要因素",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":63,"analysis":33},892450,2,"多选题","冬季施工增加费的内容包括（ ）。",[52,54,56,58,60],{"key":20,"text":53,"correct":22},"因冬季施工所需增加的一切人工、机械与材料的支出",{"key":24,"text":55,"correct":26},"材料因受潮、受湿的耗损费用",{"key":28,"text":57,"correct":22},"施工机械所需修建的暖棚，增加其他保温设备购置费用",{"key":31,"text":59,"correct":22},"因施工组织设计确定，需增加的一切保温、加温等有关支出",{"key":61,"text":62,"correct":26},"E","因防止雨水必须采取的防护措施的费用","ACD",{"id":65,"libraryId":5,"type":48,"typeLabel":49,"stem":66,"options":67,"answer":78,"analysis":33},892451,"下列关于各类基本费用的计算，说法错误的有（ ）。",[68,70,72,74,76],{"key":20,"text":69,"correct":22},"财务费以定额间接费乘以相应费率计算",{"key":24,"text":71,"correct":26},"财务费以定额直接费乘以相应费率计算",{"key":28,"text":73,"correct":26},"职工探亲路费以定额直接费乘以相应费率计算",{"key":31,"text":75,"correct":22},"主副食运费补贴以清单直接费乘以相应费率计算",{"key":61,"text":77,"correct":26},"主副食运费补贴以定额直接费乘以相应费率计算","AD",{"id":80,"libraryId":5,"type":48,"typeLabel":49,"stem":81,"options":82,"answer":93,"analysis":33},892452,"土地使用及拆迁补偿费内容包括（ ）。",[83,85,87,89,91],{"key":20,"text":84,"correct":22},"复耕费",{"key":24,"text":86,"correct":22},"拆迁补偿费",{"key":28,"text":88,"correct":26},"工伤保险费",{"key":31,"text":90,"correct":22},"耕地开垦费",{"key":61,"text":92,"correct":22},"水土保持补偿费","ABDE",{"id":95,"libraryId":5,"type":48,"typeLabel":49,"stem":96,"options":97,"answer":108,"analysis":33},892453,"工程建设其他费包含建设项目管理费、研究试验费、建设项目前期工作费、专项评价（估）费等费用。下列不属于建设项目管理费的有（ ）。",[98,100,102,104,106],{"key":20,"text":99,"correct":26},"业主管理费",{"key":24,"text":101,"correct":22},"职工保险费",{"key":28,"text":103,"correct":26},"工程监理费",{"key":31,"text":105,"correct":22},"施工单位管理费",{"key":61,"text":107,"correct":26},"设计文件审查费","BD",{"id":110,"libraryId":5,"type":48,"typeLabel":49,"stem":111,"options":112,"answer":108,"analysis":33},892454,"以下属于专项费用的有（ ）。",[113,115,117,119,121],{"key":20,"text":114,"correct":26},"办公费",{"key":24,"text":116,"correct":22},"施工场地建设费",{"key":28,"text":118,"correct":26},"工程排污费",{"key":31,"text":120,"correct":22},"安全生产费",{"key":61,"text":122,"correct":26},"主副食运费补贴",{"id":124,"libraryId":5,"type":48,"typeLabel":49,"stem":125,"options":126,"answer":136,"analysis":33},892455,"工程建设其他费包括（ ）。",[127,129,131,133,135],{"key":20,"text":128,"correct":22},"工程保险费",{"key":24,"text":130,"correct":22},"研究试验费",{"key":28,"text":132,"correct":22},"建设项目前期工作费",{"key":31,"text":134,"correct":22},"专项评价（估）费",{"key":61,"text":103,"correct":26},"ABCD",{"id":138,"libraryId":5,"type":48,"typeLabel":49,"stem":139,"options":140,"answer":151,"analysis":33},892456,"人工费的内容主要包括（ ）。",[141,143,145,147,149],{"key":20,"text":142,"correct":26},"设备购置费",{"key":24,"text":144,"correct":22},"计时工资或计件工资",{"key":28,"text":146,"correct":22},"津贴、补贴",{"key":31,"text":148,"correct":22},"特殊情况下支付的工资",{"key":61,"text":150,"correct":26},"采购及保管费","BCD",{"id":153,"libraryId":5,"type":48,"typeLabel":49,"stem":154,"options":155,"answer":166,"analysis":33},892457,"特殊地区施工增加费包括（ ）。",[156,158,160,162,164],{"key":20,"text":157,"correct":26},"高寒地区施工增加费",{"key":24,"text":159,"correct":22},"高原地区施工增加费",{"key":28,"text":161,"correct":26},"溶洞地区施工增加费",{"key":31,"text":163,"correct":22},"风沙地区施工增加费",{"key":61,"text":165,"correct":22},"沿海地区工程施工增加费","BDE",{"id":168,"libraryId":5,"type":48,"typeLabel":49,"stem":169,"options":170,"answer":136,"analysis":33},892458,"下列属于基本费用内容的有（ ）。",[171,172,174,176,178],{"key":20,"text":114,"correct":22},{"key":24,"text":173,"correct":22},"差旅交通费",{"key":28,"text":175,"correct":22},"管理人员工资",{"key":31,"text":177,"correct":22},"固定资产使用费",{"key":61,"text":179,"correct":26},"职工探亲路费",{"id":181,"libraryId":5,"type":48,"typeLabel":49,"stem":182,"options":183,"answer":193,"analysis":33},892459,"规费指按法律、法规、规章、规程规定施工企业必须缴纳的费用，下列属于规费的有（ ）。",[184,185,187,189,191],{"key":20,"text":118,"correct":26},{"key":24,"text":186,"correct":22},"失业保险费",{"key":28,"text":188,"correct":22},"医疗保险费",{"key":31,"text":190,"correct":22},"住房公积金",{"key":61,"text":192,"correct":22},"养老保险费","BCDE",{"id":195,"libraryId":5,"type":48,"typeLabel":49,"stem":196,"options":197,"answer":208,"analysis":33},892460,"下列关于基本预备费费率的说法，正确的有（ ）。",[198,200,202,204,206],{"key":20,"text":199,"correct":22},"设计概算按5%计列",{"key":24,"text":201,"correct":26},"修正概算按5%计列",{"key":28,"text":203,"correct":26},"施工图预算按4%计列",{"key":31,"text":205,"correct":26},"项目建议书投资估算按10%计列",{"key":61,"text":207,"correct":22},"工程可行性研究报告投资估算按9%计列","AE",{"id":210,"libraryId":5,"type":48,"typeLabel":49,"stem":211,"options":212,"answer":223,"analysis":33},892461,"定额按使用要求可分为（ ）。",[213,215,217,219,221],{"key":20,"text":214,"correct":22},"施工定额",{"key":24,"text":216,"correct":26},"费用定额",{"key":28,"text":218,"correct":22},"预算定额",{"key":31,"text":220,"correct":22},"估算指标",{"key":61,"text":222,"correct":22},"概算定额","ACDE",{"id":225,"libraryId":5,"type":48,"typeLabel":49,"stem":226,"options":227,"answer":93,"analysis":33},892462,"关于材料消耗定额的说法，正确的有（ ）。",[228,230,232,234,236],{"key":20,"text":229,"correct":22},"是在节约和合理使用材料的条件下，完成一定合格产品所需消耗材料的数量标准",{"key":24,"text":231,"correct":22},"材料是指工程建设中使用的原材料、产品、半成品、构配件、燃料以及水、电等动力资源的统称",{"key":28,"text":233,"correct":26},"材料消耗量的多少关系到资源的有效利用，但是对市场供求状况几乎不影响",{"key":31,"text":235,"correct":22},"材料消耗定额还有两种表现形式，即材料产品定额和材料周转定额",{"key":61,"text":237,"correct":22},"材料消耗定额＝完成单位合格产品的材料净用量×（1＋材料损耗率）",{"id":239,"libraryId":5,"type":48,"typeLabel":49,"stem":240,"options":241,"answer":252,"analysis":33},892463,"关于投标报价编制说明的说法，正确的有（ ）。",[242,244,246,248,250],{"key":20,"text":243,"correct":26},"工程量清单中的每一子目须填入单价或价格，且不超过两个报价",{"key":24,"text":245,"correct":22},"工程量清单中投标人没有填入单价或价格的子目，其费用视为已分摊在工程量清单中其他相关子目的单价或价格之中",{"key":28,"text":247,"correct":22},"工程量清单中各项金额均以人民币（元）结算",{"key":31,"text":249,"correct":26},"暂列金额（含计日工总额）的数量及拟用子目的说明",{"key":61,"text":251,"correct":22},"暂估价的数量及拟用子目的说明","BCE",{"id":254,"libraryId":5,"type":48,"typeLabel":49,"stem":255,"options":256,"answer":193,"analysis":33},892464,"下列关于投标报价编制原则的说法，正确的有（ ）。",[257,259,261,263,265],{"key":20,"text":258,"correct":26},"确定投标报价时不需要考虑发承包模式",{"key":24,"text":260,"correct":22},"以施工方案、技术措施等作为投标报价计算的基本条件",{"key":28,"text":262,"correct":22},"以反映企业技术和管理水平的企业定额作为计算人工、材料和机械台班消耗量的基本依据",{"key":31,"text":264,"correct":22},"充分利用现场考察、调研成果、市场价格信息和行情资料，编制基价，确定调价方法",{"key":61,"text":266,"correct":22},"报价计算方法要科学严谨、简明适用",{"id":268,"libraryId":5,"type":48,"typeLabel":49,"stem":269,"options":270,"answer":281,"analysis":33},892465,"计算计日工材料基本单价，需要考虑的有（ ）。",[271,273,275,277,279],{"key":20,"text":272,"correct":22},"运杂费",{"key":24,"text":274,"correct":22},"供货价",{"key":28,"text":276,"correct":22},"保险费",{"key":31,"text":278,"correct":26},"人员工资费",{"key":61,"text":280,"correct":22},"仓库管理费","ABCE",{"id":283,"libraryId":5,"type":48,"typeLabel":49,"stem":284,"options":285,"answer":296,"analysis":33},892466,"关于因变更引起的价格调整的说法，正确的有（ ）。",[286,288,290,292,294],{"key":20,"text":287,"correct":22},"如果取消某项工作，则该项工作的总额价不予支付",{"key":24,"text":289,"correct":22},"已投标报价工程量清单中有适用于变更工作的子目的，采用该子目的单价",{"key":28,"text":291,"correct":26},"已投标报价工程量清单中无适用于变更工作的子目，但有类似子目的，可在合理范围内参照类似子目的单价，由建设单位负责人商定或确定变更工作的单价",{"key":31,"text":293,"correct":22},"如果本工程的变更指示是因承包人过错，则这种违约引起的任何额外费用应由承包人承担",{"key":61,"text":295,"correct":26},"已投标报价工程量清单中无适用或类似子目的单价，可在综合考虑承包人在投标时所提供的单价分析表的基础上，由建设单位负责人商定或确定变更工作的单价","ABD",{"id":298,"libraryId":5,"type":48,"typeLabel":49,"stem":299,"options":300,"answer":193,"analysis":33},892467,"工程价款价差调整的主要方法包括（ ）。",[301,303,305,307,309],{"key":20,"text":302,"correct":26},"实际文件评估法",{"key":24,"text":304,"correct":22},"调值公式法",{"key":28,"text":306,"correct":22},"实际价格调整法",{"key":31,"text":308,"correct":22},"调价文件计算法",{"key":61,"text":310,"correct":22},"工程造价指数调整法",{"id":312,"libraryId":5,"type":48,"typeLabel":49,"stem":313,"options":314,"answer":325,"analysis":33},892468,"采用计日工计价的任何一项变更工作，承包人应在变更的实施过程中，每天提交（ ）。",[315,317,319,321,323],{"key":20,"text":316,"correct":22},"工作名称、内容和数量",{"key":24,"text":318,"correct":22},"投入该工作所有人员的姓名、工种、级别和耗用工时",{"key":28,"text":320,"correct":22},"投入该工作的材料类别和数量",{"key":31,"text":322,"correct":26},"承包单位提交的其他资料和凭证",{"key":61,"text":324,"correct":26},"工程的基本档案信息","ABC",{"id":327,"libraryId":5,"type":48,"typeLabel":49,"stem":328,"options":329,"answer":93,"analysis":33},892469,"按时间分类，支付可分为（ ）。",[330,332,334,336,338],{"key":20,"text":331,"correct":22},"预付",{"key":24,"text":333,"correct":22},"期中支付",{"key":28,"text":335,"correct":26},"交工决算",{"key":31,"text":337,"correct":22},"交工结算",{"key":61,"text":339,"correct":22},"最终结清",{"id":341,"libraryId":5,"type":48,"typeLabel":49,"stem":342,"options":343,"answer":136,"analysis":33},892470,"进度付款申请单应包括（ ）。",[344,346,348,350,352],{"key":20,"text":345,"correct":22},"截至本次付款周期末已实施工程的价款",{"key":24,"text":347,"correct":22},"应增加和扣减的索赔金额",{"key":28,"text":349,"correct":22},"应扣减的质量保证金",{"key":31,"text":351,"correct":22},"应增加和扣减的变更金额",{"key":61,"text":353,"correct":26},"应扣减的投标保证金",{"id":355,"libraryId":5,"type":48,"typeLabel":49,"stem":356,"options":357,"answer":368,"analysis":33},892471,"关于进度付款证书和支付时间的说法，正确的有（ ）。",[358,360,362,364,366],{"key":20,"text":359,"correct":22},"如果该付款周期应结算的价款经扣留和扣回后的款额少于项目专用合同条款数据表中列明的进度付款证书的最低金额，则该付款周期监理工程师可不核证支付",{"key":24,"text":361,"correct":22},"发包人应在监理工程师收到进度付款申请单且承包人提交了合格的增值税专用发票后的28d内，将进度应付款支付给承包人",{"key":28,"text":363,"correct":26},"发包人不按期支付的，违约金计算基数为合同价",{"key":31,"text":365,"correct":26},"监理工程师出具进度付款证书，应视为监理人已同意、批准或接受了承包人完成的该部分工作",{"key":61,"text":367,"correct":22},"进度付款涉及政府投资资金的，按照国库集中支付等国家相关规定和专用合同条款的约定办理","ABE",{"id":370,"libraryId":5,"type":48,"typeLabel":49,"stem":371,"options":372,"answer":223,"analysis":33},892472,"竣工决算的作用包括（ ）。",[373,375,377,379,381],{"key":20,"text":374,"correct":22},"是国家对基本建设投资实行计划管理的重要手段",{"key":24,"text":376,"correct":26},"是隐蔽工程验收的主要依据",{"key":28,"text":378,"correct":22},"是确定建设单位新增固定资产价值的依据",{"key":31,"text":380,"correct":22},"是基本建设成果和财务情况的综合反映",{"key":61,"text":382,"correct":22},"为工程定额修订提供资料",{"id":384,"libraryId":5,"type":48,"typeLabel":49,"stem":385,"options":386,"answer":281,"analysis":33},892473,"竣工决算的编制步骤包括（ ）。",[387,389,391,393,395],{"key":20,"text":388,"correct":22},"收集、整理和分析有关依据资料",{"key":24,"text":390,"correct":22},"清理各项账务、债务和结余物资",{"key":28,"text":392,"correct":22},"填写竣工决算报表",{"key":31,"text":394,"correct":26},"编写建设工程量决算清单",{"key":61,"text":396,"correct":22},"上报主管部门审查编制竣工决算的程序",{"id":398,"libraryId":5,"type":48,"typeLabel":49,"stem":399,"options":400,"answer":193,"analysis":33},892474,"按照新的财务制度和企业会计准则，新增资产按资产性质可分为（ ）。",[401,403,405,407,409],{"key":20,"text":402,"correct":26},"独立资产",{"key":24,"text":404,"correct":22},"流动资产",{"key":28,"text":406,"correct":22},"无形资产",{"key":31,"text":408,"correct":22},"固定资产",{"key":61,"text":410,"correct":22},"其他资产",{"id":412,"libraryId":5,"type":48,"typeLabel":49,"stem":413,"options":414,"answer":425,"analysis":33},892475,"以下关于无形资产价值的计价原则和计价方式的说法，正确的有（ ）。",[415,417,419,421,423],{"key":20,"text":416,"correct":26},"购入的无形资产，按照合同价款计价",{"key":24,"text":418,"correct":26},"企业自创并依法申请取得的，按照合同价款计价",{"key":28,"text":420,"correct":22},"企业接受捐赠的无形资产，按照发票账单所列金额或者同类无形资产市价作价",{"key":31,"text":422,"correct":22},"无形资产计价入账后，应在其有效使用期内分期摊销",{"key":61,"text":424,"correct":22},"投资者按无形资产作为资本金或者合作条件投入时，按评估确认或合同协议约定的金额计价","CDE",{"id":427,"libraryId":5,"type":48,"typeLabel":49,"stem":428,"options":429,"answer":136,"analysis":33},892476,"工程量清单编制的原则包括（ ）。",[430,432,434,436,438],{"key":20,"text":431,"correct":22},"必须能满足建设工程项目招标和投标计价的需要",{"key":24,"text":433,"correct":22},"必须能满足控制实物工程量的要求",{"key":28,"text":435,"correct":22},"必须能满足市场竞争形成价格的价格运行机制的要求",{"key":31,"text":437,"correct":22},"必须有利于规范建筑市场的计价行为",{"key":61,"text":439,"correct":26},"必须有利于建设方获取更多利润",{"id":441,"libraryId":5,"type":48,"typeLabel":49,"stem":442,"options":443,"answer":325,"analysis":33},892477,"编写工程量清单时需要注意的有（ ）。",[444,446,448,450,452],{"key":20,"text":445,"correct":22},"将开办项目作为独立的工程子目单列出",{"key":24,"text":447,"correct":22},"合理划分工程子目",{"key":28,"text":449,"correct":22},"工程量的计算整理要细致准确",{"key":31,"text":451,"correct":26},"计日工数量要注明",{"key":61,"text":453,"correct":26},"主要计量单位要准确",{"id":455,"libraryId":5,"type":48,"typeLabel":49,"stem":456,"options":457,"answer":325,"analysis":33},892478,"关于工程量计量规则说明的说法，正确的有（ ）。",[458,460,462,464,466],{"key":20,"text":459,"correct":22},"计量规则各章节是按“技术规范”的相应章节编号的",{"key":24,"text":461,"correct":22},"规则所有工程项目，除个别注明者外，均采用我国法定的计量单位",{"key":28,"text":463,"correct":22},"规则的计量与支付，应与合同条款、工程量清单以及图纸同时阅读，工程量清单中的支付项目号和规则的章节编号是一致的",{"key":31,"text":465,"correct":26},"一切计量工作都应在监理人在场情况下，由承包人测量、记录",{"key":61,"text":467,"correct":26},"一些简单的工程可以不按监理人书面指示进行",{"id":469,"libraryId":5,"type":48,"typeLabel":49,"stem":470,"options":471,"answer":252,"analysis":33},892479,"称重计量时应满足（ ）。",[472,474,476,478,480],{"key":20,"text":473,"correct":26},"施工单位在场",{"key":24,"text":475,"correct":22},"称重记录",{"key":28,"text":477,"correct":22},"载明包装材料、支撑装置、垫块、捆束物等质量的说明书在称重前提交给监理人作为依据",{"key":31,"text":479,"correct":26},"建设单位在场",{"key":61,"text":481,"correct":22},"监理人在场",{"id":483,"libraryId":5,"type":48,"typeLabel":49,"stem":484,"options":485,"answer":325,"analysis":33},892480,"工程一切险是为（ ）所投的保险。",[486,488,490,492,494],{"key":20,"text":487,"correct":22},"永久工程",{"key":24,"text":489,"correct":22},"临时工程和设备",{"key":28,"text":491,"correct":22},"已运至施工工地用于永久工程的材料",{"key":31,"text":493,"correct":26},"工程所有劳务人员",{"key":61,"text":495,"correct":26},"运输过程中的材料",{"id":497,"libraryId":5,"type":48,"typeLabel":49,"stem":498,"options":499,"answer":151,"analysis":33},892481,"路基工程内容包括（ ）。",[500,502,504,506,508],{"key":20,"text":501,"correct":26},"路肩培土",{"key":24,"text":503,"correct":22},"清理与挖除",{"key":28,"text":505,"correct":22},"路基填方",{"key":31,"text":507,"correct":22},"锚定板挡土墙",{"key":61,"text":509,"correct":26},"垫层",{"id":511,"libraryId":5,"type":48,"typeLabel":49,"stem":512,"options":513,"answer":223,"analysis":33},892482,"借土填方计量的工程包括（ ）。",[514,516,518,520,522],{"key":20,"text":515,"correct":22},"地貌恢复",{"key":24,"text":517,"correct":26},"脚手架的搭拆",{"key":28,"text":519,"correct":22},"场地清理",{"key":31,"text":521,"correct":22},"填方材料的开挖",{"key":61,"text":523,"correct":22},"临时排水与防护",{"id":525,"libraryId":5,"type":48,"typeLabel":49,"stem":526,"options":527,"answer":281,"analysis":33},892483,"清理现场计量的工程内容包括（ ）。",[528,530,532,534,536],{"key":20,"text":529,"correct":22},"灌木、竹林、胸径小于10cm树木的砍伐及挖根",{"key":24,"text":531,"correct":22},"与清理现场有关的一切挖方、坑穴的回填、整平、压实",{"key":28,"text":533,"correct":22},"适用材料的装卸、移运、堆放及非适用材料的移运处理",{"key":31,"text":535,"correct":26},"清除与清理现场有关的一切挖方地表面20～50cm范围内的垃圾",{"key":61,"text":537,"correct":22},"现场清理",{"id":539,"libraryId":5,"type":48,"typeLabel":49,"stem":540,"options":541,"answer":136,"analysis":33},892484,"排水管计量的工程内容包括（ ）。",[542,544,546,548,550],{"key":20,"text":543,"correct":22},"基槽开挖填筑",{"key":24,"text":545,"correct":22},"垫层（基础）铺筑",{"key":28,"text":547,"correct":22},"出水口处理",{"key":31,"text":549,"correct":22},"安放排水管",{"key":61,"text":551,"correct":26},"钢筋制作与安装",{"id":553,"libraryId":5,"type":48,"typeLabel":49,"stem":554,"options":555,"answer":93,"analysis":33},892485,"路肩培土计量的工程内容包括（ ）。",[556,558,560,562,564],{"key":20,"text":557,"correct":22},"分层填筑、压实",{"key":24,"text":559,"correct":22},"挖运土",{"key":28,"text":561,"correct":26},"模板制作、安装、拆除、修理",{"key":31,"text":563,"correct":22},"修整路肩横坡",{"key":61,"text":565,"correct":22},"路基整修、培土、整形",{"id":567,"libraryId":5,"type":48,"typeLabel":49,"stem":568,"options":569,"answer":151,"analysis":33},892486,"桥梁涵洞工程，附属结构包括（ ）。",[570,572,574,576,578],{"key":20,"text":571,"correct":26},"盖板涵",{"key":24,"text":573,"correct":22},"人行道",{"key":28,"text":575,"correct":22},"防撞墙",{"key":31,"text":577,"correct":22},"护栏",{"key":61,"text":579,"correct":26},"通道的钢筋",{"id":581,"libraryId":5,"type":48,"typeLabel":49,"stem":582,"options":583,"answer":281,"analysis":33},892487,"以下属于挖孔灌注桩计量工程内容的有（ ）。",[584,586,588,590,591],{"key":20,"text":585,"correct":22},"设置支撑与护壁",{"key":24,"text":587,"correct":22},"挖孔、清孔",{"key":28,"text":589,"correct":22},"混凝土制拌",{"key":31,"text":519,"correct":26},{"key":61,"text":592,"correct":22},"破桩头",{"id":594,"libraryId":5,"type":48,"typeLabel":49,"stem":595,"options":596,"answer":325,"analysis":33},892488,"桥梁涵洞工程中，作为钢筋工程的附属工作的有（ ）。",[597,599,601,603,605],{"key":20,"text":598,"correct":22},"钢筋除锈",{"key":24,"text":600,"correct":22},"制作安装",{"key":28,"text":602,"correct":22},"成品运输",{"key":31,"text":604,"correct":26},"钢筋储存",{"key":61,"text":606,"correct":26},"钢筋试验",{"id":608,"libraryId":5,"type":48,"typeLabel":49,"stem":609,"options":610,"answer":93,"analysis":33},892489,"桩的检验荷载试验（暂定工程量）分不同的（ ）以每一试桩为单位计量。",[611,613,615,617,619],{"key":20,"text":612,"correct":22},"柱径",{"key":24,"text":614,"correct":22},"桩长",{"key":28,"text":616,"correct":26},"桩重",{"key":31,"text":618,"correct":22},"检验荷载等级",{"key":61,"text":620,"correct":22},"混凝土强度等级",{"id":622,"libraryId":5,"type":48,"typeLabel":49,"stem":623,"options":624,"answer":325,"analysis":33},892490,"以下属于预制安装混凝土沟槽计量的工程内容的有（ ）。",[625,627,629,631,633],{"key":20,"text":626,"correct":22},"沟槽开挖",{"key":24,"text":628,"correct":22},"基底检查",{"key":28,"text":630,"correct":22},"铺设垫层",{"key":31,"text":632,"correct":26},"土工合成材料铺设",{"key":61,"text":634,"correct":26},"接缝处理",{"id":636,"libraryId":5,"type":48,"typeLabel":49,"stem":637,"options":638,"answer":252,"analysis":33},892491,"钢筋作业的附属工作包括（ ）。",[639,640,642,644,646],{"key":20,"text":606,"correct":26},{"key":24,"text":641,"correct":22},"定位架立钢筋",{"key":28,"text":643,"correct":22},"钢筋接头",{"key":31,"text":645,"correct":26},"钢筋制作",{"key":61,"text":647,"correct":22},"吊装钢筋",{"id":649,"libraryId":5,"type":48,"typeLabel":49,"stem":650,"options":651,"answer":136,"analysis":33},892492,"隧道工程内容包括（ ）。",[652,654,656,658,660],{"key":20,"text":653,"correct":22},"洞口与明洞工程",{"key":24,"text":655,"correct":22},"防水与排水",{"key":28,"text":657,"correct":22},"洞身开挖",{"key":31,"text":659,"correct":22},"监控量测",{"key":61,"text":661,"correct":26},"墙体加固",{"id":663,"libraryId":5,"type":48,"typeLabel":49,"stem":664,"options":665,"answer":223,"analysis":33},892493,"石砌护墙计量的工程内容包括（ ）。",[666,668,670,672,674],{"key":20,"text":667,"correct":22},"泄水预留孔",{"key":24,"text":669,"correct":26},"管箱安装",{"key":28,"text":671,"correct":22},"勾缝抹灰",{"key":31,"text":673,"correct":22},"弃方处理",{"key":61,"text":675,"correct":22},"砌体砌筑",{"id":677,"libraryId":5,"type":48,"typeLabel":49,"stem":678,"options":679,"answer":281,"analysis":33},892494,"安全设施及预埋管线工程内容包括（ ）。",[680,682,684,686,688],{"key":20,"text":681,"correct":22},"隔离栅",{"key":24,"text":683,"correct":22},"道路交通标志",{"key":28,"text":685,"correct":22},"预埋（预留）基础",{"key":31,"text":687,"correct":26},"桩基础",{"key":61,"text":689,"correct":22},"道路交通标线",{"id":691,"libraryId":5,"type":48,"typeLabel":49,"stem":692,"options":693,"answer":108,"analysis":33},892495,"管道工程不扣除（ ）。",[694,695,697,699,701],{"key":20,"text":667,"correct":26},{"key":24,"text":696,"correct":22},"人孔",{"key":28,"text":698,"correct":26},"沉降缝",{"key":31,"text":700,"correct":22},"手孔",{"key":61,"text":702,"correct":26},"施工缝",{"id":704,"libraryId":5,"type":48,"typeLabel":49,"stem":705,"options":706,"answer":296,"analysis":33},892496,"播撒草种（含喷播）计量的工程内容包括（ ）。",[707,708,710,712,714],{"key":20,"text":519,"correct":22},{"key":24,"text":709,"correct":22},"种植及覆盖",{"key":28,"text":711,"correct":26},"沉降后补填",{"key":31,"text":713,"correct":22},"施肥",{"key":61,"text":715,"correct":26},"路面清洁保护",{"id":717,"libraryId":5,"type":48,"typeLabel":49,"stem":718,"options":719,"answer":136,"analysis":33},892497,"绿化及环境保护设施工程内容包括（ ）。",[720,722,724,726,728],{"key":20,"text":721,"correct":22},"铺设表土",{"key":24,"text":723,"correct":22},"撒播草种",{"key":28,"text":725,"correct":22},"铺植草皮",{"key":31,"text":727,"correct":22},"设置声屏障工程",{"key":61,"text":729,"correct":26},"清除杂草",[731,734,737,740,743,746],{"id":15,"name":732,"category":7,"favorite":733},"领导干部任职前廉政法规知识测试题",92,{"id":735,"name":736,"category":7,"favorite":15},595,"建筑结构与设备",{"id":738,"name":739,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":741,"name":742,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":744,"name":745,"category":7,"favorite":8},534,"BIM工程师",{"id":747,"name":745,"category":7,"favorite":8},535]