[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-578-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":622},{"id":5,"name":6,"category":7,"favorite":8},578,"[交通运输工程]建设工程计量与计价实务","建筑工程",0,3,50,431,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,574,586,598,610],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},892297,1,"单选题","公路工程中的路基施工内容不包括（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","路基施工技术准备",false,{"key":24,"text":25,"correct":22},"B","路基土石方工程",{"key":27,"text":28,"correct":22},"C","排水工程",{"key":30,"text":31,"correct":32},"D","路基加固工程",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},892298,"挖方路基施工中，土质路堑的施工工艺中包括：①路槽整修；②开挖截水沟；③边坡修理；④开挖边沟。正确的排序是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"②—①—④—③",{"key":24,"text":41,"correct":32},"②—③—④—①",{"key":27,"text":43,"correct":22},"①—②—③—④",{"key":30,"text":45,"correct":22},"①—③—②—④",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},892299,"土质路堑的开挖方法不包括（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"横向挖掘法",{"key":24,"text":53,"correct":32},"斜向挖掘法",{"key":27,"text":55,"correct":22},"纵向挖掘法",{"key":30,"text":57,"correct":22},"混合式挖掘法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},892300,"土质路堑纵向挖掘多采用机械作业，具体方法不包括（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"分层纵挖法",{"key":24,"text":65,"correct":22},"通道纵挖法",{"key":27,"text":67,"correct":22},"分段纵挖法",{"key":30,"text":69,"correct":32},"分块纵挖法",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},892301,"压实机械对土进行碾压时，一般以慢速效果最好，除羊足碾或凸块式碾外，压实速度以（ ）最为适宜。",[74,76,78,80],{"key":20,"text":75,"correct":22},"1～2km\u002Fh",{"key":24,"text":77,"correct":32},"2～4km\u002Fh",{"key":27,"text":79,"correct":22},"4～5km\u002Fh",{"key":30,"text":81,"correct":22},"5～7km\u002Fh",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},892302,"填石路堤压实质量标准的控制指标宜采用（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":32},"孔隙率",{"key":24,"text":89,"correct":22},"压实度",{"key":27,"text":91,"correct":22},"沉降差",{"key":30,"text":93,"correct":22},"密度",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},892303,"下列不属于滑坡防治工程措施的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"滑坡排水",{"key":24,"text":101,"correct":32},"植树造林",{"key":27,"text":103,"correct":22},"力学平衡",{"key":30,"text":105,"correct":22},"改变滑带土",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},892304,"一般情况下，同一路段应先施工的路基地面排水设施是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"边沟",{"key":24,"text":113,"correct":22},"急流槽",{"key":27,"text":115,"correct":32},"截水沟",{"key":30,"text":117,"correct":22},"拦水带",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},892305,"渗沟包括填石渗沟、管式渗沟和洞式渗沟，这三种渗沟均应设置的结构不包括（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"排水层",{"key":24,"text":125,"correct":22},"反滤层",{"key":27,"text":127,"correct":22},"封闭层",{"key":30,"text":129,"correct":32},"过滤层",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},892306,"用以支挡边坡、保持土体稳定、加强路基强度和稳定性、避免边坡在水流条件变化时发生破坏的工程称做（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"路基防护工程",{"key":24,"text":137,"correct":22},"路基排水工程",{"key":27,"text":139,"correct":32},"路基支挡工程",{"key":30,"text":141,"correct":22},"挡土墙",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},892307,"沥青稳定类基层又称柔性基层，下列不属于沥青稳定类基层的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"贯入式沥青碎石",{"key":24,"text":149,"correct":22},"乳化沥青碎石",{"key":27,"text":151,"correct":32},"冷拌沥青碎石",{"key":30,"text":153,"correct":22},"热拌沥青碎石",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},892308,"无机结合料稳定类基层，也称半刚性基层，其主要分类不包括（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"石灰稳定类",{"key":24,"text":161,"correct":22},"水泥稳定类",{"key":27,"text":163,"correct":32},"沥青稳定类",{"key":30,"text":165,"correct":22},"石灰工业废渣稳定集料类",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":30,"analysis":33},892309,"粒料类基层按强度构成原理可分为嵌锁型与级配型。下列关于粒料类基层施工的说法，正确的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"填隙碎石基层施工前填隙料应用水润湿",{"key":24,"text":173,"correct":22},"级配碎（砾）石基层碾压时遵循先重后轻的原则",{"key":27,"text":175,"correct":22},"粒料类基层未洒透层沥青或未铺封层时可直接开放交通",{"key":30,"text":177,"correct":32},"填隙碎石基层单层压实厚度宜为公称最大直径的1.5～2倍",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},892310,"下列关于热拌沥青混合料路面施工的说法，正确的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"底面层施工前两天在基层上洒黏层油",{"key":24,"text":185,"correct":22},"出厂的混合料不符要求时应酌情使用",{"key":27,"text":187,"correct":32},"混合料运至施工现场的温度控制在120～150℃",{"key":30,"text":189,"correct":22},"从拌和机向运料汽车上放料时车辆位置不得移动",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":30,"analysis":33},892311,"公路隧道洞内行车道路面宜采用（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"沥青贯入式路面",{"key":24,"text":197,"correct":22},"级配碎石路面",{"key":27,"text":199,"correct":22},"沥青混凝土路面",{"key":30,"text":201,"correct":32},"水泥混凝土路面",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":30,"analysis":33},892312,"模板、拱架和支架均应进行施工图设计，经批准后方可用于施工。其设计原则不包括（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"制作装拆方便",{"key":24,"text":209,"correct":22},"接缝严密不漏浆",{"key":27,"text":211,"correct":22},"需验算刚度及稳定性",{"key":30,"text":213,"correct":32},"优先使用胶合板和木模板",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},892313,"关于混凝土的生产和运输，下列说法正确的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"混凝土配合比应以体积比表示",{"key":24,"text":221,"correct":32},"混凝土拌和物不得有离析和泌水现象",{"key":27,"text":223,"correct":22},"集中搅拌时水泥数量允许偏差为±2%",{"key":30,"text":225,"correct":22},"运至搅拌地点后坍落度不符合要求时应废弃",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},892314,"下列关于预应力混凝土施工的说法，错误的是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":32},"预应力筋制作时下料可采用电弧切割",{"key":24,"text":233,"correct":22},"锚垫板上的压浆孔内径不宜小于20mm",{"key":27,"text":235,"correct":22},"刚性管道为壁厚不小于2mm的平滑钢管",{"key":30,"text":237,"correct":22},"预应力筋的孔道可以采取抽芯法进行预留",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},892315,"下列关于预应力张拉的说法，正确的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"先张法台座的锚固横梁受力后挠度不大于5mm",{"key":24,"text":245,"correct":22},"实际伸长值与理论伸长值的差值为5%时应暂停张拉",{"key":27,"text":247,"correct":32},"实施张拉时千斤顶与锚具的中心线应位于同一轴线上",{"key":30,"text":249,"correct":22},"未防腐的预应力筋安装后至压浆的容许间隔时间为7天",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":27,"analysis":33},892316,"关于桥梁上部结构预制安装施工，下列说法错误的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"当桥址为深谷、急流时采用缆索吊装法架设",{"key":24,"text":257,"correct":22},"海上长大桥梁的架设安装可采用浮吊架设法",{"key":27,"text":259,"correct":32},"30m跨径的陆上预制梁架设可采用自行式吊车",{"key":30,"text":261,"correct":22},"节段式预应力混凝土连续梁架设可采用逐孔拼装法",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":27,"analysis":33},892317,"斜拉桥索塔的施工可视其结构、体形、材料、施工设备和设计综合考虑选用合适的方法。索塔现浇施工方法不包括（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"翻模法",{"key":24,"text":269,"correct":22},"滑模法",{"key":27,"text":271,"correct":32},"悬拼法",{"key":30,"text":273,"correct":22},"爬模法",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},892318,"斜拉桥主梁施工方法与梁式桥基本相同，下列关于斜拉桥主梁施工的说法，不正确的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"现浇梁段和第一预制梁段间宜设湿接头",{"key":24,"text":281,"correct":32},"预制桥面板安装应遵循先安装后预制原则",{"key":27,"text":283,"correct":22},"悬浇施工挂篮应主梁浇筑时抗风振刚度要求",{"key":30,"text":285,"correct":22},"悬拼施工梁段的预制可采用长线法或短线法台座",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},892319,"关于斜拉桥的拉索施工，下列说法不正确的是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"张拉机具能力应大于最大拉索拉力",{"key":24,"text":293,"correct":32},"拉索可在塔端或梁端两侧进行张拉",{"key":27,"text":295,"correct":22},"索塔横桥向两侧张拉应对称同步进行",{"key":30,"text":297,"correct":22},"两侧不对称拉索应按设计规定的索力分级同步张拉",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":30,"analysis":33},892320,"悬索桥是利用主缆和吊索作为加劲梁的悬吊体系，其特点不包括（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"受力合理",{"key":24,"text":305,"correct":22},"造价经济",{"key":27,"text":307,"correct":22},"最大限度发挥材料强度",{"key":30,"text":309,"correct":32},"跨越能力小",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},892321,"悬索桥是跨越千米以上障碍物最理想的桥型，其施工的一般步骤为（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":32},"索塔、锚碇基础→索塔、锚碇→上部结构→桥面系",{"key":24,"text":317,"correct":22},"索塔、锚碇基础→上部结构→索塔、锚碇→桥面系",{"key":27,"text":319,"correct":22},"索塔、锚碇→索塔、锚碇基础→上部结构→桥面系",{"key":30,"text":321,"correct":22},"索塔、锚碇→索塔、锚碇基础→桥面系→上部结构",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},892322,"根据隧道穿越地层的不同情况和目前隧道施工技术的发展，山岭隧道的支护方法不包括（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"新奥法",{"key":24,"text":329,"correct":32},"盖挖法",{"key":27,"text":331,"correct":22},"掘进机法",{"key":30,"text":333,"correct":22},"传统矿山法",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":30,"analysis":33},892323,"隧道仰拱或二次衬砌到掌子面的安全距离称为隧道安全步距，下列关于安全步距说法错误的是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"Ⅲ级围岩仰拱与掌子面的距离不得超过90m",{"key":24,"text":341,"correct":22},"Ⅳ级围岩仰拱与掌子面的距离不得超过50m",{"key":27,"text":343,"correct":22},"Ⅴ级围岩二次衬砌距掌子面的距离不得大于70m",{"key":30,"text":345,"correct":32},"Ⅳ级围岩二次衬砌距掌子面的距离不得大于70m",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":30,"analysis":33},892324,"隧道施工的临时防、排水应与永久防、排水设施相结合，下列关于防排水措施说法错误的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"洞内应顺坡排水，其坡度与线路坡度一致",{"key":24,"text":353,"correct":22},"洞内水位较高时，可采用井点降水法处理",{"key":27,"text":355,"correct":22},"浇筑二次衬砌前发现防水层有破损必须进行处理",{"key":30,"text":357,"correct":32},"塑料止水带，其接头形式应采用搭接或复合接",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},892325,"二级及二级以上公路路堤和填方高度小于（ ）的公路路堤，应将路基基底范围内的树根全部挖除并将坑穴填平夯实。",[362,364,366,368],{"key":20,"text":363,"correct":22},"0.5m",{"key":24,"text":365,"correct":32},"1m",{"key":27,"text":367,"correct":22},"1.5m",{"key":30,"text":369,"correct":22},"2m",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":27,"analysis":33},892326,"路基施工前应做好的三大准备不包括（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"组织",{"key":24,"text":377,"correct":22},"物资",{"key":27,"text":379,"correct":32},"合同",{"key":30,"text":381,"correct":22},"技术",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},892327,"公路建设中常用的是凿岩穿孔机械是凿岩机，凿岩机在公路工程中常用的是（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":32},"风动凿岩机",{"key":24,"text":389,"correct":22},"液压凿岩机",{"key":27,"text":391,"correct":22},"电动凿岩机",{"key":30,"text":393,"correct":22},"内燃凿岩机",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":27,"analysis":33},892328,"粉料撒布机的撒布宽度小于3m，撒布厚度在（ ）以下。",[398,400,402,404],{"key":20,"text":399,"correct":22},"60mm",{"key":24,"text":401,"correct":22},"70mm",{"key":27,"text":403,"correct":32},"80mm",{"key":30,"text":405,"correct":22},"90mm",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},892329,"下列不属于沥青乳化机构造形式的是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"搅拌式",{"key":24,"text":413,"correct":32},"悬挂式",{"key":27,"text":415,"correct":22},"胶体磨式",{"key":30,"text":417,"correct":22},"喷嘴式",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":24,"analysis":33},892330,"沥青混凝土摊铺机通常每台摊铺机的摊铺宽度不宜超过（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"5m",{"key":24,"text":425,"correct":32},"7.5m",{"key":27,"text":427,"correct":22},"8.5m",{"key":30,"text":429,"correct":22},"10m",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},892331,"当运距在（ ）m以内时，推土机的生产率较高。",[434,436,438,440],{"key":20,"text":435,"correct":32},"100",{"key":24,"text":437,"correct":22},"200",{"key":27,"text":439,"correct":22},"300",{"key":30,"text":441,"correct":22},"500",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":27,"analysis":33},892332,"下列属于拉铲挖掘机挖土特点的是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"前进向上，强制切土",{"key":24,"text":449,"correct":22},"后退向下，强制切土",{"key":27,"text":451,"correct":32},"后退向下，自重切土",{"key":30,"text":453,"correct":22},"直上直下，自重切土",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":30,"analysis":33},892333,"履带式拖拉机一般配备______人，轮胎式拖拉机一般配备______人。（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"2；2",{"key":24,"text":461,"correct":22},"1；2",{"key":27,"text":463,"correct":22},"1；1",{"key":30,"text":465,"correct":32},"2；1",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},892334,"作为一种循环作业式的铲土运输机械，铲运机的工序中不包括（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":32},"碎土",{"key":24,"text":473,"correct":22},"装土",{"key":27,"text":475,"correct":22},"运土",{"key":30,"text":477,"correct":22},"卸土",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},892335,"压实大块石堆砌基础和碎石路面一般采用的光轮压路机类型是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"中型",{"key":24,"text":485,"correct":22},"特轻型",{"key":27,"text":487,"correct":32},"特重型",{"key":30,"text":489,"correct":22},"重型",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},892336,"（ ）用于灌注桩、深层搅拌桩、混凝土预制桩钻打结合法等工艺，适用土质的地质条件。",[494,496,498,500],{"key":20,"text":495,"correct":22},"旋转钻机",{"key":24,"text":497,"correct":32},"螺旋钻机",{"key":27,"text":499,"correct":22},"冲击钻机",{"key":30,"text":501,"correct":22},"回转斗钻机",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":27,"analysis":33},892338,"施工组织设计资料收集过程中，基本要求不包括（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":22},"座谈有纪要",{"key":24,"text":509,"correct":22},"协商有协议",{"key":27,"text":511,"correct":32},"讲究经济性",{"key":30,"text":513,"correct":22},"有文件规定的要索取的书面资料",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":20,"analysis":33},892339,"不属于施工平面图内容的是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":32},"单位工程施工平面图",{"key":24,"text":521,"correct":22},"单项工程施工平面图",{"key":27,"text":523,"correct":22},"分部分项工程施工平面图",{"key":30,"text":525,"correct":22},"施工总平面图",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":27,"analysis":33},892340,"施工图预算的主要组成部分不包括（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"设备、工具、器具及家具购置费",{"key":24,"text":533,"correct":22},"工程建设其他费用",{"key":27,"text":535,"correct":32},"规费",{"key":30,"text":537,"correct":22},"建筑安装工程费",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":27,"analysis":33},892341,"下列关于施工中的安全管理原则的说法不正确的是（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":22},"预防为主，综合考虑",{"key":24,"text":545,"correct":22},"安全管理应贯穿于施工全过程",{"key":27,"text":547,"correct":32},"进行针对性管理，安全第一",{"key":30,"text":549,"correct":22},"管生产必须同时管安全",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},892342,"关于辅助工程的说法，错误的是（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":32},"没有具体的服务工程对象",{"key":24,"text":557,"correct":22},"不构成主体工程的实体",{"key":27,"text":559,"correct":22},"将其费用综合在相应的使用对象工程造价内",{"key":30,"text":561,"correct":22},"不得作为计量支付的依据",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":20,"analysis":33},892343,"下列关于施工组织设计的说法不正确的是（ ）。",[566,568,570,572],{"key":20,"text":567,"correct":32},"施工组织设计是根据工程发包组织的需要编制的技术经济文件",{"key":24,"text":569,"correct":22},"施工组织设计具有组织、规划和据以指挥、协调、控制的作用",{"key":27,"text":571,"correct":22},"施工组织设计是全局性的文件，即文件内容是全面的，发挥作用是全方位的",{"key":30,"text":573,"correct":22},"施工组织设计指导承包全过程，从投标开始，到竣工结束",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},892344,"下列不属于单位工程施工组织设计编制依据的是（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":22},"水、电供应情况",{"key":24,"text":581,"correct":32},"设备材料订货指标",{"key":27,"text":583,"correct":22},"施工现场的具体情况",{"key":30,"text":585,"correct":22},"建设用地征购、拆迁情况",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":24,"analysis":33},892345,"公路施工前需要对施工现场进行勘察，勘察的主要对象不包括（ ）。",[590,592,594,596],{"key":20,"text":591,"correct":22},"路线",{"key":24,"text":593,"correct":32},"地质",{"key":27,"text":595,"correct":22},"桥位",{"key":30,"text":597,"correct":22},"大型土石方地段",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":27,"analysis":33},892346,"适合表示公路、隧道等线形工程的总体施工进度的图是（ ）。",[602,604,606,608],{"key":20,"text":603,"correct":22},"斜率图",{"key":24,"text":605,"correct":22},"网络图",{"key":27,"text":607,"correct":32},"垂直图",{"key":30,"text":609,"correct":22},"“S”曲线",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":30,"analysis":33},892347,"施工组织计划的内容不包括（ ）。",[614,616,618,620],{"key":20,"text":615,"correct":22},"工程进度图",{"key":24,"text":617,"correct":22},"主要材料计划表",{"key":27,"text":619,"correct":22},"临时工程表",{"key":30,"text":621,"correct":32},"施工方案的修正",[623,626,629,632,635,638],{"id":15,"name":624,"category":7,"favorite":625},"领导干部任职前廉政法规知识测试题",92,{"id":627,"name":628,"category":7,"favorite":15},595,"建筑结构与设备",{"id":630,"name":631,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":633,"name":634,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":636,"name":637,"category":7,"favorite":8},534,"BIM工程师",{"id":639,"name":637,"category":7,"favorite":8},535]