[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-578-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":620},{"id":5,"name":6,"category":7,"favorite":8},578,"[交通运输工程]建设工程计量与计价实务","建筑工程",0,2,50,431,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,200,212,224,236,248,260,272,284,296,308,320,332,344,356,368,380,392,404,416,428,440,452,464,476,488,500,512,524,536,548,560,572,584,596,608],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},892246,1,"单选题","以下计量单位是“m2”的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","中粒式沥青混凝土",true,{"key":24,"text":25,"correct":26},"B","现浇混凝土加固土路肩",false,{"key":28,"text":29,"correct":26},"C","混凝土预制加固土路肩",{"key":31,"text":32,"correct":26},"D","混凝土预制块路缘石","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},892247,"下列哪项不包含在浇筑不同厚度水泥混凝土面层的工程项目中？（ ）",[38,40,42,44],{"key":20,"text":39,"correct":26},"水泥混凝土路面模板制作安装",{"key":24,"text":41,"correct":26},"水泥混凝土路面养护用的养护剂",{"key":28,"text":43,"correct":26},"水泥混凝土路面胀缝的填灌缝材料",{"key":31,"text":45,"correct":22},"水泥混凝土路面垫层施工材料",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},892248,"石灰稳定土基层计量的工程内容不包括（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"清理下承层",{"key":24,"text":53,"correct":26},"拌和",{"key":28,"text":55,"correct":22},"清除路基上的浮土",{"key":31,"text":57,"correct":26},"初期养护",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},892249,"集水井计量的工程内容不包括（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"基坑开挖及废方弃运",{"key":24,"text":65,"correct":26},"地基平整夯实",{"key":28,"text":67,"correct":26},"混凝土拌和",{"key":31,"text":69,"correct":22},"修整路肩横坡",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},892250,"以下不属于桥梁涵洞工程内容的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"钢筋混凝土沉井",{"key":24,"text":77,"correct":26},"钢架拱上部构造",{"key":28,"text":79,"correct":26},"伸缩缝装置",{"key":31,"text":81,"correct":22},"结构柱的制作",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},892251,"陆上钻孔灌注桩的计量单位是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"m",{"key":24,"text":89,"correct":26},"m2",{"key":28,"text":91,"correct":26},"m3",{"key":31,"text":93,"correct":26},"根",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},892252,"依据图纸所示构件长度计算的预应力钢丝，分不同（ ）以千克为单位计量。",[98,100,102,104],{"key":20,"text":99,"correct":26},"形状",{"key":24,"text":101,"correct":26},"型号",{"key":28,"text":103,"correct":26},"面积",{"key":31,"text":105,"correct":22},"材质",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},892254,"浆砌护面墙中不扣除的体积不包含（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"沉降缝所占体积",{"key":24,"text":113,"correct":26},"泄水孔所占体积",{"key":28,"text":115,"correct":22},"添加剂所占体积",{"key":31,"text":117,"correct":26},"预埋件所占体积",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},892255,"隧道工程工程量清单计量中，以下不另行计量的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"洞身开挖",{"key":24,"text":125,"correct":22},"核对图纸",{"key":28,"text":127,"correct":26},"明洞工程",{"key":31,"text":129,"correct":26},"洞身衬砌",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},892256,"石砌截水沟、排水沟应依据图纸所示位置及尺寸，按图示砌体体积分不同（ ）以立方米为单位计量。",[134,136,138,140],{"key":20,"text":135,"correct":22},"砂浆强度等级",{"key":24,"text":137,"correct":26},"尺寸大小",{"key":28,"text":139,"correct":26},"体积",{"key":31,"text":141,"correct":26},"重量",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},892257,"预制安装混凝土块计量的工程内容不包括（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"基坑开挖",{"key":24,"text":149,"correct":26},"构件预测",{"key":28,"text":151,"correct":26},"预制件安装",{"key":31,"text":153,"correct":22},"装修、养护",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},892258,"钢板网隔离栅不扣除钢管（型钢）所占沿线长度，（ ）起讫端按相应沿线路线长度的1\u002F2计量。",[158,160,162,164],{"key":20,"text":159,"correct":26},"长方形",{"key":24,"text":161,"correct":26},"正方形",{"key":28,"text":163,"correct":22},"三角形",{"key":31,"text":165,"correct":26},"菱形",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},892259,"关于安全设施及预埋管线工程工程量清单计量的说法，错误的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"石砌护墙不扣除砌体沉降缝、泄水孔所占体积",{"key":24,"text":173,"correct":26},"隔离栅不扣除混凝土立柱所占沿路线长度",{"key":28,"text":175,"correct":22},"三角形起讫端按相应沿路线长度的1\u002F3计量",{"key":31,"text":177,"correct":26},"防眩网不扣除立柱所占长度",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},892260,"波形梁钢护栏端头计量依据图纸所示位置、断面尺寸，按图示各端头（ ），以个位单位计量。",[182,184,186,188],{"key":20,"text":183,"correct":26},"尺寸",{"key":24,"text":185,"correct":22},"数量",{"key":28,"text":187,"correct":26},"直径",{"key":31,"text":189,"correct":26},"长度",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},892261,"热熔型涂料路面标线按图示标线（ ）进行计量。",[194,195,196,198],{"key":20,"text":103,"correct":22},{"key":24,"text":189,"correct":26},{"key":28,"text":197,"correct":26},"线性",{"key":31,"text":199,"correct":26},"类型",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":24,"analysis":33},892262,"撒播草种和铺植草皮不扣除（ ）所占面积。",[204,206,208,210],{"key":20,"text":205,"correct":26},"结构工程防护",{"key":24,"text":207,"correct":22},"散栽苗木",{"key":28,"text":209,"correct":26},"攀缘植物",{"key":31,"text":211,"correct":26},"密栽灌木",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":20,"analysis":33},892263,"开挖并铺设表土计量的工程内容不包括（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"种植草皮",{"key":24,"text":219,"correct":26},"填前场地清理",{"key":28,"text":221,"correct":26},"回填种植土",{"key":31,"text":223,"correct":26},"清除杂物",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},892264,"吸声砖声屏障的附属工作是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":26},"结构柱",{"key":24,"text":231,"correct":22},"基础",{"key":28,"text":233,"correct":26},"墙体",{"key":31,"text":235,"correct":26},"屋顶",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":28,"analysis":33},892265,"胸径应为地表面向上（ ）处树干直径。",[240,242,244,246],{"key":20,"text":241,"correct":26},"1m",{"key":24,"text":243,"correct":26},"1.1m",{"key":28,"text":245,"correct":22},"1.2m",{"key":31,"text":247,"correct":26},"1.3m",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":28,"analysis":33},892266,"关于路基加宽施工技术要点的说法，错误的是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":26},"老路堤与新路堤交界的坡面挖除清理的厚度不宜小于0.3m",{"key":24,"text":255,"correct":26},"老路堤高度小于2m时，老路堤坡面处理后，可直接填筑新路堤",{"key":28,"text":257,"correct":22},"垫层材料一般为砂砾或碎石，含泥量不大于3%",{"key":31,"text":259,"correct":26},"拓宽路堤的填料宜选用与老路堤相同的填料，或者选用水稳性较好的砂砾、碎石等填料",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":20,"analysis":33},892267,"单层横向全宽挖掘法适用于挖掘（ ）的土质路堑。",[264,266,268,270],{"key":20,"text":265,"correct":22},"浅且短",{"key":24,"text":267,"correct":26},"深且短",{"key":28,"text":269,"correct":26},"长且一侧堑壁较薄",{"key":31,"text":271,"correct":26},"深且长",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":24,"analysis":33},892268,"高速公路、一级公路和铺设高级路面的其他等级公路的填石路堤采用（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":26},"倾填法",{"key":24,"text":279,"correct":22},"碾压法",{"key":28,"text":281,"correct":26},"冲击压实法",{"key":31,"text":283,"correct":26},"强力夯实法",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":31,"analysis":33},892269,"下列不属于土质路堤填筑方法的是（ ）。",[288,290,292,294],{"key":20,"text":289,"correct":26},"联合填筑",{"key":24,"text":291,"correct":26},"水平分层填筑",{"key":28,"text":293,"correct":26},"纵向分层填筑",{"key":31,"text":295,"correct":22},"横向分层填筑",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":28,"analysis":33},892270,"软土地基的浅层处置方法不包括（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":26},"换填法",{"key":24,"text":303,"correct":26},"抛石挤淤",{"key":28,"text":305,"correct":22},"缝接法",{"key":31,"text":307,"correct":26},"爆炸挤淤",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":31,"analysis":33},892271,"在路基工程中，用于排除地下水的设施是（ ）。",[312,314,316,318],{"key":20,"text":313,"correct":26},"拦水带",{"key":24,"text":315,"correct":26},"急流槽",{"key":28,"text":317,"correct":26},"截水沟",{"key":31,"text":319,"correct":22},"渗井",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":24,"analysis":33},892272,"下列路面结构层中，属于柔性基层的是（ ）。",[324,326,328,330],{"key":20,"text":325,"correct":26},"水泥稳定碎石基层",{"key":24,"text":327,"correct":22},"贯入式沥青碎石基层",{"key":28,"text":329,"correct":26},"二灰碎石基层",{"key":31,"text":331,"correct":26},"石灰稳定土基层",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":31,"analysis":33},892273,"沥青稳定类基层包括热拌沥青碎石、贯入式沥青碎石、乳化沥青碎石混合料基层等。下列关于沥青稳定类基层施工的说法，错误的是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":26},"施工前，承包人应做200m的试验路段",{"key":24,"text":339,"correct":26},"机械摊铺的混合料，不应用人工反复修整",{"key":28,"text":341,"correct":26},"沥青混合料的分层压实厚度不得大于10cm",{"key":31,"text":343,"correct":22},"压路机应从中心向外侧碾压，相邻碾压带应重叠1\u002F3～1\u002F2轮宽",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},892274,"涵身一般每隔（ ）m设沉降缝一道沉降缝。",[348,350,352,354],{"key":20,"text":349,"correct":22},"4～6",{"key":24,"text":351,"correct":26},"3～5",{"key":28,"text":353,"correct":26},"5～7",{"key":31,"text":355,"correct":26},"2～4",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":28,"analysis":33},892275,"后张法预制梁板施工时，当预制梁跨大于（ ）时，要按规定设置反拱。",[360,362,364,366],{"key":20,"text":361,"correct":26},"10m",{"key":24,"text":363,"correct":26},"15m",{"key":28,"text":365,"correct":22},"20m",{"key":31,"text":367,"correct":26},"25m",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":31,"analysis":33},892276,"现浇法不包括（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":26},"固定支架法",{"key":24,"text":375,"correct":26},"悬臂现浇法",{"key":28,"text":377,"correct":26},"顶推法",{"key":31,"text":379,"correct":22},"逐孔拼装法",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":28,"analysis":33},892277,"下列关于钢筋工程施工的说法，错误的是（ ）。",[384,386,388,390],{"key":20,"text":385,"correct":26},"钢筋外表有严重锈蚀时不得使用",{"key":24,"text":387,"correct":26},"轴心受拉构件不应采用绑扎接头",{"key":28,"text":389,"correct":22},"钢筋连接宜采用焊接接头或绑扎接头",{"key":31,"text":391,"correct":26},"预制成的钢筋骨架必须具有足够的稳定性",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":28,"analysis":33},892278,"下列关于后张法的张拉和锚固的说法，错误的是（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":26},"预应力张拉前应进行摩阻测试",{"key":24,"text":399,"correct":26},"直线筋或螺纹筋可在一端张拉",{"key":28,"text":401,"correct":22},"预应力钢筋张拉锚固后应在24h内完成压浆",{"key":31,"text":403,"correct":26},"切割后预应力钢筋的外露长度不应小于30mm",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":20,"analysis":33},892279,"下列关于基坑开挖的说法，正确的是（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":22},"基坑顶面应设置防止地面水流入基坑的设施",{"key":24,"text":411,"correct":26},"基坑深度较大且坑壁土层不稳定时可放坡开挖",{"key":28,"text":413,"correct":26},"放坡开挖工程量不大时，应按设计要求对坑壁进行支护",{"key":31,"text":415,"correct":26},"基顶有动荷载时，其边缘与动荷载之间护道宽不小于2m",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":28,"analysis":33},892280,"关于基坑支护，下列说法正确的是（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":26},"基坑深度＞4m时，可采用槽钢支护",{"key":24,"text":423,"correct":26},"基坑深度≤4m时，宜采用锁口钢管桩围堰支护",{"key":28,"text":425,"correct":22},"锚杆加固孔深≤3m时，宜用先注浆后插入锚杆工艺",{"key":31,"text":427,"correct":26},"采用孔底注浆法的注浆管应插至距孔底100～150mm处",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":31,"analysis":33},892281,"关于挖基施工和排水，下列说法错误的是（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":26},"挖基施工宜安排在枯水季节进行",{"key":24,"text":435,"correct":26},"排水困难时，宜采用水下挖基方法",{"key":28,"text":437,"correct":26},"挖至基底前预留一定厚度由人工开挖至设计高程",{"key":31,"text":439,"correct":22},"采用机械开挖时发现超挖，应直接回填至设计标高",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":31,"analysis":33},892282,"下列关于钻孔灌注桩施工中钻孔和清底的说法中错误的是（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":26},"开钻时应慢速钻进",{"key":24,"text":447,"correct":26},"清孔排渣时应保持孔内水位",{"key":28,"text":449,"correct":26},"冲击钻停钻时，应及时向孔内补水",{"key":31,"text":451,"correct":22},"旋挖钻钻进时泥浆面应始终不低于护筒底部",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":28,"analysis":33},892283,"下列关于钢筋笼吊装和混凝土灌注的说法中正确的是（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":26},"导管的埋置深度宜控制在2～4m",{"key":24,"text":459,"correct":26},"安装钢筋骨架时可接将钢筋骨架支承在孔底",{"key":28,"text":461,"correct":22},"钢筋笼骨架外侧设置应控制保护层厚度的垫块",{"key":31,"text":463,"correct":26},"当桩径D＜1.5m时，其坍落度宜为160～200mm",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":31,"analysis":33},892284,"下列关于墩台钢筋施工的说法中正确的是（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":26},"高度大于20m的桥墩安装时宜设置劲性骨架",{"key":24,"text":471,"correct":26},"钢筋施工时其分节高度不宜大于6m",{"key":28,"text":473,"correct":26},"钢筋施工时其分节高度不宜大于12m",{"key":31,"text":475,"correct":22},"上段混凝土强度超2.5MPa时绑扎下段钢筋",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":20,"analysis":33},892285,"下列关于墩台模板施工的说法中错误的是（ ）。",[480,482,484,486],{"key":20,"text":481,"correct":22},"钢筋与模板之间厚度不允许有正偏差",{"key":24,"text":483,"correct":26},"模板采用分段整体吊装需保证整体性",{"key":28,"text":485,"correct":26},"高墩首节模板安装竖直度应严格控制",{"key":31,"text":487,"correct":26},"风力较大地区的高墩模板考虑抗风稳定性",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":31,"analysis":33},892286,"下列关于墩台帽和盖梁施工的说法中正确的是（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":26},"支架宜直接支承在承台以外的地基",{"key":24,"text":495,"correct":26},"盖梁与墩身连接处模板与墩台身应有间隙",{"key":28,"text":497,"correct":26},"支承在软弱地基上的支架不能施加预压力",{"key":31,"text":499,"correct":22},"支架等临时结构应进行受力分析计算与验算",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":31,"analysis":33},892287,"桥梁上部结构的施工方法的种类较多，大致可分为预制安装和现浇两大类，预制安装类不包括（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":26},"预制梁安装",{"key":24,"text":507,"correct":26},"预制节段式块件",{"key":28,"text":509,"correct":26},"整跨箱梁预制吊装",{"key":31,"text":511,"correct":22},"预制桥墩、桥台安装",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},892288,"斜拉桥的拉索按材料和制作方式的不同可分为不同形式，拉索形式不包括（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":26},"单股钢绞缆",{"key":24,"text":519,"correct":26},"封闭式钢缆",{"key":28,"text":521,"correct":26},"平行钢筋索",{"key":31,"text":523,"correct":22},"双股钢绞缆",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":28,"analysis":33},892289,"新奥法施工过程不包括（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":26},"开挖",{"key":24,"text":531,"correct":26},"喷锚",{"key":28,"text":533,"correct":22},"打锚杆",{"key":31,"text":535,"correct":26},"模筑混凝土",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":31,"analysis":33},892290,"新奥法是奥地利学者从长期的隧道施工实践中从岩体力学的观点出发而提出的一种合理施工的方法，下列关于新奥法的说法，不正确的是（ ）。",[540,542,544,546],{"key":20,"text":541,"correct":26},"充分发挥围岩的自承能力",{"key":24,"text":543,"correct":26},"采用毫秒爆破和光面爆破技术",{"key":28,"text":545,"correct":26},"以喷射混凝土和锚杆作为主要支护手段",{"key":31,"text":547,"correct":22},"新奥法施工工序可划分为开挖、喷锚和装饰",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":24,"analysis":33},892291,"关于隧道施工方法，下列说法不正确的是（ ）。",[552,554,556,558],{"key":20,"text":553,"correct":26},"明挖法适用于埋置较浅的工程",{"key":24,"text":555,"correct":22},"矿山法施工进度快、建设周期短",{"key":28,"text":557,"correct":26},"掘进机是开挖与出渣联合作业的掘进机械",{"key":31,"text":559,"correct":26},"初次柔性支护在洞身开挖之后必须立即进行",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},892292,"隧道洞口与明洞工程应按照隧道施工组织设计的顺序安排，按设计要求应先施工完成，下列关于洞口和明洞工程施工的说法，正确的是（ ）。",[564,566,568,570],{"key":20,"text":565,"correct":26},"洞口土石方开挖可采用大爆破以缩短工期",{"key":24,"text":567,"correct":22},"洞门端墙的砌筑与墙背回填应两侧同时进行",{"key":28,"text":569,"correct":26},"明洞段顶部回填土方每层厚度不得小于0.3m",{"key":31,"text":571,"correct":26},"当明洞与暗洞衔接时，施工宜采用先墙后拱法",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":24,"analysis":33},892293,"超前支护措施的选用应视围岩条件、涌水状况、施工方法、环境要求等情况而定，适用于围岩压力来得快、来得大的支护方式是（ ）。",[576,578,580,582],{"key":20,"text":577,"correct":26},"超前锚杆",{"key":24,"text":579,"correct":22},"管棚支护",{"key":28,"text":581,"correct":26},"预注浆方法",{"key":31,"text":583,"correct":26},"超前小导管",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":24,"analysis":33},892294,"隧道初期支护措施，应紧随开挖面及时施作，确保施工安全。下列关于初期支护说法错误的是（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":26},"Ⅳ级围岩必要时可加设钢支撑",{"key":24,"text":591,"correct":22},"Ⅲ级围岩支护可采用局部锚杆",{"key":28,"text":593,"correct":26},"钢支撑常用于软弱破碎围岩隧道中",{"key":31,"text":595,"correct":26},"喷射混凝土作为永久支护时必须配置钢筋网",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":28,"analysis":33},892295,"二次衬砌是隧道工程施工在初期支护内侧施作的模筑混凝土或钢筋混凝土衬砌，二次衬砌施作时间应满足的条件不包括（ ）。",[600,602,604,606],{"key":20,"text":601,"correct":26},"位移率明显减缓并已基本稳定",{"key":24,"text":603,"correct":26},"拱顶下沉速率小于0.07～0.15mm\u002F天",{"key":28,"text":605,"correct":22},"周边位移速率小于0.05～0.25mm\u002F天",{"key":31,"text":607,"correct":26},"已产生位移已达预计位移量的80%～90%",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":20,"analysis":33},892296,"机械通风按照风道的类型和通风机安装位置分为风管式通风、巷道式通风、风墙式通风。一般隧道通风采用（ ）。",[612,614,616,618],{"key":20,"text":613,"correct":22},"风管式通风",{"key":24,"text":615,"correct":26},"巷道式通风",{"key":28,"text":617,"correct":26},"风墙式通风",{"key":31,"text":619,"correct":26},"风板式通风",[621,624,627,630,633,636],{"id":15,"name":622,"category":7,"favorite":623},"领导干部任职前廉政法规知识测试题",92,{"id":625,"name":626,"category":7,"favorite":15},595,"建筑结构与设备",{"id":628,"name":629,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":631,"name":632,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":634,"name":635,"category":7,"favorite":8},534,"BIM工程师",{"id":637,"name":635,"category":7,"favorite":8},535]