[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-578-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":601},{"id":5,"name":6,"category":7,"favorite":8},578,"[交通运输工程]建设工程计量与计价实务","建筑工程",0,1,50,431,[13,33,45,57,69,81,93,105,117,128,140,151,163,175,187,199,211,222,234,246,255,267,279,291,303,315,327,339,348,359,371,383,395,407,419,431,443,452,464,476,488,498,509,521,533,545,557,565,577,589],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":29,"analysis":32},892196,"单选题","下列哪些不属于措施费？（ ）",[18,22,25,28],{"key":19,"text":20,"correct":21},"A","冬季施工增加费",false,{"key":23,"text":24,"correct":21},"B","行车干扰工程施工增加费",{"key":26,"text":27,"correct":21},"C","施工辅助费",{"key":29,"text":30,"correct":31},"D","工程机械使用费",true,"",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":26,"analysis":32},892197,"下列哪项不属于土地使用及拆迁补偿费？（ ）",[37,39,41,43],{"key":19,"text":38,"correct":21},"永久占地费",{"key":23,"text":40,"correct":21},"拆迁补偿费",{"key":26,"text":42,"correct":31},"工程保通管理费",{"key":29,"text":44,"correct":21},"水土保持补偿费",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":26,"analysis":32},892198,"造价文件编制完成后，应写出（ ），文字力求简明扼要。",[49,51,53,55],{"key":19,"text":50,"correct":21},"编制计划",{"key":23,"text":52,"correct":21},"编制依据",{"key":26,"text":54,"correct":31},"编制说明",{"key":29,"text":56,"correct":21},"编制办法",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":29,"analysis":32},892199,"公路工程造价的编制原则不包括（ ）。",[61,63,65,67],{"key":19,"text":62,"correct":21},"正确合理地采用工程计价依据",{"key":23,"text":64,"correct":21},"要严格遵守国家的方针、政策和有关制度",{"key":26,"text":66,"correct":21},"要认真做好造价分析，有步骤、有目的地配合设计人员开展限额设计和优化设计",{"key":29,"text":68,"correct":31},"拟定现场调查提要与地质勘探和设计人员相互配合提供资料等要求",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":26,"analysis":32},892200,"（ ）是招标工作的核心内容。",[73,75,77,79],{"key":19,"text":74,"correct":21},"合同价",{"key":23,"text":76,"correct":21},"合同工期",{"key":26,"text":78,"correct":31},"标底",{"key":29,"text":80,"correct":21},"工程量清单",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":26,"analysis":32},892201,"建设项目全寿命周期的建筑信息模型（Building Information Modeling）的费用属于（ ）。",[85,87,89,91],{"key":19,"text":86,"correct":21},"工程建设其他费",{"key":23,"text":88,"correct":21},"企业管理费",{"key":26,"text":90,"correct":31},"建设项目信息化费",{"key":29,"text":92,"correct":21},"措施项目费",{"id":94,"libraryId":5,"type":9,"typeLabel":15,"stem":95,"options":96,"answer":26,"analysis":32},892202,"定额的费用项目划分为不变费用和可变费用两类。其中，不变费用不包括（ ）。",[97,99,101,103],{"key":19,"text":98,"correct":21},"折旧费",{"key":23,"text":100,"correct":21},"维护费",{"key":26,"text":102,"correct":31},"动力燃料费",{"key":29,"text":104,"correct":21},"安拆辅助费",{"id":106,"libraryId":5,"type":9,"typeLabel":15,"stem":107,"options":108,"answer":19,"analysis":32},892203,"下列属于建筑安装工程费的是（ ）。",[109,111,113,115],{"key":19,"text":110,"correct":31},"直接费、设备购置费、措施费",{"key":23,"text":112,"correct":21},"人工费、材料费、施工机械使用费",{"key":26,"text":114,"correct":21},"冬季施工增加费、雨季施工增加费、夜间施工增加费",{"key":29,"text":116,"correct":21},"基本费用、主副食运费补贴、职工探亲路费",{"id":118,"libraryId":5,"type":9,"typeLabel":15,"stem":119,"options":120,"answer":23,"analysis":32},892204,"下列属于企业管理费的是（ ）。",[121,122,124,126],{"key":19,"text":27,"correct":21},{"key":23,"text":123,"correct":31},"主副食运费补贴",{"key":26,"text":125,"correct":21},"辅助生产间接费",{"key":29,"text":127,"correct":21},"材料费",{"id":129,"libraryId":5,"type":9,"typeLabel":15,"stem":130,"options":131,"answer":19,"analysis":32},892205,"利润指施工企业完成所承包工程获得的盈利，按定额直接费及措施费、企业管理费之和的（ ）计算。",[132,134,136,138],{"key":19,"text":133,"correct":31},"7.42%",{"key":23,"text":135,"correct":21},"7.41%",{"key":26,"text":137,"correct":21},"7.44%",{"key":29,"text":139,"correct":21},"7.43%",{"id":141,"libraryId":5,"type":9,"typeLabel":15,"stem":142,"options":143,"answer":23,"analysis":32},892206,"下列哪项不属于工程建设其他费？（ ）",[144,146,147,149],{"key":19,"text":145,"correct":21},"建设项目管理费",{"key":23,"text":44,"correct":31},{"key":26,"text":148,"correct":21},"建设项目前期工作费",{"key":29,"text":150,"correct":21},"联合试运转费",{"id":152,"libraryId":5,"type":9,"typeLabel":15,"stem":153,"options":154,"answer":29,"analysis":32},892207,"研究试验费不包括（ ）。",[155,157,159,161],{"key":19,"text":156,"correct":21},"建设过程中必须进行研究和试验所需的费用",{"key":23,"text":158,"correct":21},"支付科技成果的一次性技术转让费",{"key":26,"text":160,"correct":21},"支付专利、先进技术的一次性技术转让费",{"key":29,"text":162,"correct":31},"应由前期工作费开支的项目",{"id":164,"libraryId":5,"type":9,"typeLabel":15,"stem":165,"options":166,"answer":23,"analysis":32},892208,"基本预备费计算以建筑安装工程费、土地征用及拆迁补偿费、工程建设其他费用之和为基数，工程可行性研究报告投资估算按（ ）计列。",[167,169,171,173],{"key":19,"text":168,"correct":21},"11%",{"key":23,"text":170,"correct":31},"9%",{"key":26,"text":172,"correct":21},"5%",{"key":29,"text":174,"correct":21},"4%",{"id":176,"libraryId":5,"type":9,"typeLabel":15,"stem":177,"options":178,"answer":26,"analysis":32},892209,"在编制工程造价之前，造价工程师必须进行现场调查，收集有关资料，其中不包括（ ）。",[179,181,183,185],{"key":19,"text":180,"correct":21},"社会条件",{"key":23,"text":182,"correct":21},"自然条件",{"key":26,"text":184,"correct":31},"地质条件",{"key":29,"text":186,"correct":21},"技术经济条件",{"id":188,"libraryId":5,"type":9,"typeLabel":15,"stem":189,"options":190,"answer":19,"analysis":32},892210,"以下不属于公路工程造价特点的是（ ）。",[191,193,195,197],{"key":19,"text":192,"correct":31},"分项计价",{"key":23,"text":194,"correct":21},"单件性",{"key":26,"text":196,"correct":21},"多次计价",{"key":29,"text":198,"correct":21},"组合计价",{"id":200,"libraryId":5,"type":9,"typeLabel":15,"stem":201,"options":202,"answer":23,"analysis":32},892211,"某公路工程人工夯实填土，工程量为5000m3，在该地区发布的人工单价是100元\u002F工日，该项目的预算人工费为（ ）元。",[203,205,207,209],{"key":19,"text":204,"correct":21},"41000",{"key":23,"text":206,"correct":31},"42500",{"key":26,"text":208,"correct":21},"40000",{"key":29,"text":210,"correct":21},"38900",{"id":212,"libraryId":5,"type":9,"typeLabel":15,"stem":213,"options":214,"answer":19,"analysis":32},892212,"工程排污费属于（ ）。",[215,216,218,220],{"key":19,"text":88,"correct":31},{"key":23,"text":217,"correct":21},"规费",{"key":26,"text":219,"correct":21},"其他费用",{"key":29,"text":221,"correct":21},"间接费",{"id":223,"libraryId":5,"type":9,"typeLabel":15,"stem":224,"options":225,"answer":23,"analysis":32},892213,"联合试运转费以定额建筑安装工程费为基数，按（ ）的费率计算。",[226,228,230,232],{"key":19,"text":227,"correct":21},"0.03%",{"key":23,"text":229,"correct":31},"0.04%",{"key":26,"text":231,"correct":21},"0.05%",{"key":29,"text":233,"correct":21},"0.07%",{"id":235,"libraryId":5,"type":9,"typeLabel":15,"stem":236,"options":237,"answer":19,"analysis":32},892214,"（ ）是在建筑安装工人的正常施工条件下，完成单位合格产品的劳动力、材料、机械消耗的数量标准。",[238,240,242,244],{"key":19,"text":239,"correct":31},"施工定额",{"key":23,"text":241,"correct":21},"预算定额",{"key":26,"text":243,"correct":21},"概算定额",{"key":29,"text":245,"correct":21},"估算指标",{"id":247,"libraryId":5,"type":9,"typeLabel":15,"stem":248,"options":249,"answer":26,"analysis":32},892215,"预算定额是在（ ）的基础上经综合扩大。",[250,251,252,253],{"key":19,"text":243,"correct":21},{"key":23,"text":245,"correct":21},{"key":26,"text":239,"correct":31},{"key":29,"text":254,"correct":21},"材料消耗量定额",{"id":256,"libraryId":5,"type":9,"typeLabel":15,"stem":257,"options":258,"answer":26,"analysis":32},892216,"以下哪项不符合定额抽换条件？（ ）",[259,261,263,265],{"key":19,"text":260,"correct":21},"就地浇筑钢筋混凝土梁用的支架及拱券用的拱盔、支架，如确因施工安排达不到规定的周转次数",{"key":23,"text":262,"correct":21},"在使用预算定额时，路面基层材料、混凝土、砂浆的配合比与定额不相符",{"key":26,"text":264,"correct":31},"钢筋工程中，当设计用Ⅲ、Ⅳ级钢筋比例和定额比例不同",{"key":29,"text":266,"correct":21},"如施工中必须使用特殊机械，可按具体情况进行换算",{"id":268,"libraryId":5,"type":9,"typeLabel":15,"stem":269,"options":270,"answer":29,"analysis":32},892217,"关于计日工说明的说法，错误的是（ ）。",[271,273,275,277],{"key":19,"text":272,"correct":21},"计日工不调价",{"key":23,"text":274,"correct":21},"投标人应在计日工单价表中填列计日工子目的基本单价或租价",{"key":26,"text":276,"correct":21},"未经监理人书面指令，任何工程不得按计日工施工",{"key":29,"text":278,"correct":31},"接到监理工程师按计日工施工的书面指令，承包人可以拒绝",{"id":280,"libraryId":5,"type":9,"typeLabel":15,"stem":281,"options":282,"answer":23,"analysis":32},892218,"下列对投标报价分析的评估方法说法错误的是（ ）。",[283,285,287,289],{"key":19,"text":284,"correct":21},"投标报价的宏观审核",{"key":23,"text":286,"correct":31},"投标报价的定额分析",{"key":26,"text":288,"correct":21},"投标报价的动态分析",{"key":29,"text":290,"correct":21},"投标报价的盈亏分析",{"id":292,"libraryId":5,"type":9,"typeLabel":15,"stem":293,"options":294,"answer":26,"analysis":32},892219,"公路工程工程量清单计价应采用（ ）。",[295,297,299,301],{"key":19,"text":296,"correct":21},"综合单价",{"key":23,"text":298,"correct":21},"工料单价",{"key":26,"text":300,"correct":31},"全费用综合单价",{"key":29,"text":302,"correct":21},"定额单价",{"id":304,"libraryId":5,"type":9,"typeLabel":15,"stem":305,"options":306,"answer":29,"analysis":32},892220,"报价中的清单复核不包括（ ）。",[307,309,311,313],{"key":19,"text":308,"correct":21},"清单工程量准确性",{"key":23,"text":310,"correct":21},"清单项目完整性",{"key":26,"text":312,"correct":21},"清单项目一致性",{"key":29,"text":314,"correct":31},"清单工程量计算规范性",{"id":316,"libraryId":5,"type":9,"typeLabel":15,"stem":317,"options":318,"answer":29,"analysis":32},892221,"开工预付款在达到签约合同价（ ）之后，开始按工程进度以固定比率分期从各月的进度付款证书中扣回。",[319,321,323,325],{"key":19,"text":320,"correct":21},"15%",{"key":23,"text":322,"correct":21},"20%",{"key":26,"text":324,"correct":21},"25%",{"key":29,"text":326,"correct":31},"30%",{"id":328,"libraryId":5,"type":9,"typeLabel":15,"stem":329,"options":330,"answer":19,"analysis":32},892222,"以下关于承包人违约导致合同终止后的结算的说法，错误的是（ ）。",[331,333,335,337],{"key":19,"text":332,"correct":31},"合同解除后，发包人应暂停对承包人的一切付款，查清各项付款和已扣款金额，不包括承包人应支付的违约金",{"key":23,"text":334,"correct":21},"合同双方确认上述往来款项后，出具最终结清付款证书，结清全部合同款项",{"key":26,"text":336,"correct":21},"合同解除后，发包人应按合同的约定向承包人索赔由于解除合同给发包人造成的损失",{"key":29,"text":338,"correct":21},"发包人和承包人未能就解除合同后的结清达成一致而形成争议的，按合同的约定办理",{"id":340,"libraryId":5,"type":9,"typeLabel":15,"stem":341,"options":342,"answer":23,"analysis":32},892223,"国内开工预付款金额一般应为（ ）签约合同价。",[343,344,346,347],{"key":19,"text":172,"correct":21},{"key":23,"text":345,"correct":31},"10%",{"key":26,"text":320,"correct":21},{"key":29,"text":326,"correct":21},{"id":349,"libraryId":5,"type":9,"typeLabel":15,"stem":350,"options":351,"answer":19,"analysis":32},892224,"材料、设备预付款按项目（ ）数据表中所列主要材料、设备单据费用的百分比支付。",[352,354,356,357],{"key":19,"text":353,"correct":31},"专用合同条款",{"key":23,"text":355,"correct":21},"通用合同条款",{"key":26,"text":80,"correct":21},{"key":29,"text":358,"correct":21},"协议书",{"id":360,"libraryId":5,"type":9,"typeLabel":15,"stem":361,"options":362,"answer":23,"analysis":32},892225,"监理人在收到承包人进度付款申请单以及相应的支持性证明文件后的（ ）内完成核查。",[363,365,367,369],{"key":19,"text":364,"correct":21},"7d",{"key":23,"text":366,"correct":31},"14d",{"key":26,"text":368,"correct":21},"28d",{"key":29,"text":370,"correct":21},"30d",{"id":372,"libraryId":5,"type":9,"typeLabel":15,"stem":373,"options":374,"answer":26,"analysis":32},892226,"关于质量保证金的支付与返还的说法，错误的是（ ）。",[375,377,379,381],{"key":19,"text":376,"correct":21},"交工验收证书签发后14d内，承包人应向发包人缴纳质量保证金",{"key":23,"text":378,"correct":21},"质量保证金可采用银行保函或现金、支票形式",{"key":26,"text":380,"correct":31},"质量保证金采用现金、支票形式提交的，发包人应在项目通用合同条款数据表中明确是否计付利息以及利息的计算方式",{"key":29,"text":382,"correct":21},"保证金预留比率不得高于工程价款结算总额的3%",{"id":384,"libraryId":5,"type":9,"typeLabel":15,"stem":385,"options":386,"answer":26,"analysis":32},892227,"建设单位编制的竣工决算报告须提交（ ）审查。",[387,389,391,393],{"key":19,"text":388,"correct":21},"政府部门",{"key":23,"text":390,"correct":21},"质量验收部门",{"key":26,"text":392,"correct":31},"竣工验收委员会",{"key":29,"text":394,"correct":21},"造价主管部门",{"id":396,"libraryId":5,"type":9,"typeLabel":15,"stem":397,"options":398,"answer":23,"analysis":32},892228,"（ ）是以实物数量和货币指标为计量单位，综合反映竣工项目从筹建开始到项目竣工交付使用为止的全部建设费用、投资效果和财务情况的总结性文件。",[399,401,403,405],{"key":19,"text":400,"correct":21},"竣工结算",{"key":23,"text":402,"correct":31},"竣工决算",{"key":26,"text":404,"correct":21},"最终结清",{"key":29,"text":406,"correct":21},"清账",{"id":408,"libraryId":5,"type":9,"typeLabel":15,"stem":409,"options":410,"answer":19,"analysis":32},892229,"竣工决算的编制是以（ ）为主。",[411,413,415,417],{"key":19,"text":412,"correct":31},"建设单位",{"key":23,"text":414,"correct":21},"施工单位",{"key":26,"text":416,"correct":21},"设计单位",{"key":29,"text":418,"correct":21},"监理单位",{"id":420,"libraryId":5,"type":9,"typeLabel":15,"stem":421,"options":422,"answer":29,"analysis":32},892230,"竣工决算报告表不包含（ ）。",[423,425,427,429],{"key":19,"text":424,"correct":21},"决算审批表",{"key":23,"text":426,"correct":21},"工程概况专用表",{"key":26,"text":428,"correct":21},"财务通用表",{"key":29,"text":430,"correct":31},"决算规范型审查表",{"id":432,"libraryId":5,"type":9,"typeLabel":15,"stem":433,"options":434,"answer":29,"analysis":32},892231,"新增固定资产价值是以独立发挥生产能力的（ ）为对象。",[435,437,439,441],{"key":19,"text":436,"correct":21},"分项工程",{"key":23,"text":438,"correct":21},"分部工程",{"key":26,"text":440,"correct":21},"单位工程",{"key":29,"text":442,"correct":31},"单项工程",{"id":444,"libraryId":5,"type":9,"typeLabel":15,"stem":445,"options":446,"answer":23,"analysis":32},892232,"招标工程的工程量清单通常由（ ）提供。",[447,448,450,451],{"key":19,"text":414,"correct":21},{"key":23,"text":449,"correct":31},"业主",{"key":26,"text":416,"correct":21},{"key":29,"text":418,"correct":21},{"id":453,"libraryId":5,"type":9,"typeLabel":15,"stem":454,"options":455,"answer":26,"analysis":32},892233,"分项清单表中单价或金额栏的数字一般由（ ）投标时填写。",[456,458,460,462],{"key":19,"text":457,"correct":21},"招标代理机构",{"key":23,"text":459,"correct":21},"建设方",{"key":26,"text":461,"correct":31},"承包人",{"key":29,"text":463,"correct":21},"评标委员会",{"id":465,"libraryId":5,"type":9,"typeLabel":15,"stem":466,"options":467,"answer":26,"analysis":32},892234,"工程计量的组织类型不包括（ ）。",[468,470,472,474],{"key":19,"text":469,"correct":21},"监理工程师独立计量",{"key":23,"text":471,"correct":21},"承包人进行计量",{"key":26,"text":473,"correct":31},"建设单位进行计量",{"key":29,"text":475,"correct":21},"监理工程师与承包人共同计量",{"id":477,"libraryId":5,"type":9,"typeLabel":15,"stem":478,"options":479,"answer":29,"analysis":32},892235,"以下哪项不属于计量分析阶段所做的工作？（ ）",[480,482,484,486],{"key":19,"text":481,"correct":21},"对计量的表格应统一，使其标准化和规范化",{"key":23,"text":483,"correct":21},"设计好表格让承包人和具体从事计量的人员按此填写",{"key":26,"text":485,"correct":21},"将实际工程量与原设计的工程量进行对比，发现偏差并分析偏差的原因",{"key":29,"text":487,"correct":31},"记录工程量清单中所列出的分类细目的数量与计量后数量的差异及双方同意的任何进度支付证书应付的款额",{"id":489,"libraryId":5,"type":9,"typeLabel":15,"stem":490,"options":491,"answer":19,"analysis":32},892236,"暂列金额的设置不宜超过工程量清单第100～700章合计金额的（ ）。",[492,494,495,496],{"key":19,"text":493,"correct":31},"3%",{"key":23,"text":172,"correct":21},{"key":26,"text":345,"correct":21},{"key":29,"text":497,"correct":21},"12%",{"id":499,"libraryId":5,"type":9,"typeLabel":15,"stem":500,"options":501,"answer":19,"analysis":32},892237,"水泥混凝土的计量应按（ ）认可的并已完工工程的净尺寸计算。",[502,504,505,507],{"key":19,"text":503,"correct":31},"监理人",{"key":23,"text":449,"correct":21},{"key":26,"text":506,"correct":21},"施工负责人",{"key":29,"text":508,"correct":21},"技术负责人",{"id":510,"libraryId":5,"type":9,"typeLabel":15,"stem":511,"options":512,"answer":26,"analysis":32},892238,"关于临时工程用地的说法，错误的是（ ）。",[513,515,517,519],{"key":19,"text":514,"correct":21},"临时工程用地明确拌合场、堆料场、机械设备停放场等用地都作为临时用地",{"key":23,"text":516,"correct":21},"临时用地费是承包人为完成工程建设，临时占用土地的租用费",{"key":26,"text":518,"correct":31},"临时用地费不包含临时占地恢复费",{"key":29,"text":520,"correct":21},"未经审批的占地和超过批准的占地使用时间所发生的一切费用和后果由承包人自负",{"id":522,"libraryId":5,"type":9,"typeLabel":15,"stem":523,"options":524,"answer":26,"analysis":32},892239,"安全生产费按投标价的（ ）以固定金额形式计入工程量清单支付子目中。",[525,527,529,531],{"key":19,"text":526,"correct":21},"0.5%",{"key":23,"text":528,"correct":21},"1%",{"key":26,"text":530,"correct":31},"1.5%",{"key":29,"text":532,"correct":21},"2%",{"id":534,"libraryId":5,"type":9,"typeLabel":15,"stem":535,"options":536,"answer":23,"analysis":32},892240,"承包人应统一配备发包人指定的工程信息化系统，并建立网络系统。网络带宽不宜小于（ ）。",[537,539,541,543],{"key":19,"text":538,"correct":21},"10M",{"key":23,"text":540,"correct":31},"20M",{"key":26,"text":542,"correct":21},"30M",{"key":29,"text":544,"correct":21},"40M",{"id":546,"libraryId":5,"type":9,"typeLabel":15,"stem":547,"options":548,"answer":26,"analysis":32},892241,"路床顶面以下挖松深（ ）再压实作为挖土方的附属工作，不另行计量。",[549,551,553,555],{"key":19,"text":550,"correct":21},"100mm",{"key":23,"text":552,"correct":21},"200mm",{"key":26,"text":554,"correct":31},"300mm",{"key":29,"text":556,"correct":21},"500mm",{"id":558,"libraryId":5,"type":9,"typeLabel":15,"stem":559,"options":560,"answer":29,"analysis":32},892242,"土石方体积用平均断面积法计算，但与似棱体公式计算方式计算结果比较，如果误差超过（ ），采用似棱体公式计算。",[561,562,563,564],{"key":19,"text":532,"correct":21},{"key":23,"text":493,"correct":21},{"key":26,"text":174,"correct":21},{"key":29,"text":172,"correct":31},{"id":566,"libraryId":5,"type":9,"typeLabel":15,"stem":567,"options":568,"answer":26,"analysis":32},892243,"路基填料中石料含量等于或大于（ ）时，按填石路堤计量。",[569,571,573,575],{"key":19,"text":570,"correct":21},"40%",{"key":23,"text":572,"correct":21},"50%",{"key":26,"text":574,"correct":31},"70%",{"key":29,"text":576,"correct":21},"80%",{"id":578,"libraryId":5,"type":9,"typeLabel":15,"stem":579,"options":580,"answer":23,"analysis":32},892244,"关于利用土石混填工程量计量，以下说法错误的是（ ）。",[581,583,585,587],{"key":19,"text":582,"correct":21},"依据图纸所示地面线、路基设计横断面图，按平均断面积法计算压实的体积，以立方米为单位计量",{"key":23,"text":584,"correct":31},"应用于当填料中石料含量大于50%、小于70%时",{"key":26,"text":586,"correct":21},"满足施工需要，预留路基宽度宽填的填方量作为路基填筑的附属工作，不另行计量",{"key":29,"text":588,"correct":21},"地面下沉增加的填方量按填料来源参照本条计量",{"id":590,"libraryId":5,"type":9,"typeLabel":15,"stem":591,"options":592,"answer":23,"analysis":32},892245,"以下计量单位不是“m3”的是（ ）。",[593,595,597,599],{"key":19,"text":594,"correct":21},"混凝土锚固板",{"key":23,"text":596,"correct":31},"钢筋锚杆",{"key":26,"text":598,"correct":21},"浆砌片石铺砌",{"key":29,"text":600,"correct":21},"抛石防护",[602,605,608,611,614,617],{"id":9,"name":603,"category":7,"favorite":604},"领导干部任职前廉政法规知识测试题",92,{"id":606,"name":607,"category":7,"favorite":9},595,"建筑结构与设备",{"id":609,"name":610,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":612,"name":613,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":615,"name":616,"category":7,"favorite":8},534,"BIM工程师",{"id":618,"name":616,"category":7,"favorite":8},535]