[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892568":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},892568,578,2,"多选题","地下排水设施有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","明沟、暗沟",true,{"key":16,"text":17,"correct":14},"B","排水槽、暗管",{"key":19,"text":20,"correct":21},"C","河流",false,{"key":23,"text":24,"correct":14},"D","渗沟、渗井",{"key":26,"text":27,"correct":14},"E","隔离层","ABDE","地下排水设施有：①明沟、暗沟、排水槽、暗管。当地下水位高、潜水层埋藏不深时，可采用明沟或排水槽，截流地下水或降低地下水位，明沟或排水槽必须深入到潜水层。为排除泉水或地下集中水流，可采用暗沟或暗管。高等级公路的中央分隔带也需要采用纵向、横向的暗沟及暗管将集水排出路基之外。②渗沟、渗井。为降低地下水或拦截地下含水层中的水流可设置渗沟。渗沟是常见的地下排水沟渠，可视地下水流情况纵、横向设置。③隔离层。当地下水位高，路线纵面设计难以满足最小填土高度时，可在路基内设置隔离层。隔离层由透水材料或不透水材料筑成。隔离层应设在最高地下水位之上，同时应高出边沟水位0.2m；隔离层至路基边缘的高度视公路等级而定，一般为0.45～0.70m。",{"id":6,"name":31,"category":32,"favorite":33},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]