[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892531":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},892531,578,2,"多选题","排除滑坡地下水的设施有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","支撑渗沟",true,{"key":16,"text":17,"correct":14},"B","边坡渗沟",{"key":19,"text":20,"correct":14},"C","暗沟",{"key":22,"text":23,"correct":14},"D","平孔",{"key":25,"text":26,"correct":27},"E","天沟",false,"ABCD","滑坡防治的工程措施主要有滑坡排水、力学平衡和改变滑带土三类。其中，滑坡防治的工程措施中排除地下水的方法有支撑渗沟、边坡渗沟、暗沟、平孔等。",{"id":6,"name":31,"category":32,"favorite":33},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]