[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892517":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},892517,578,2,"多选题","斜拉桥索塔现浇施工的方法包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","翻模法",true,{"key":16,"text":17,"correct":14},"B","爬模法",{"key":19,"text":20,"correct":21},"C","顶推法",false,{"key":23,"text":24,"correct":14},"D","滑模法",{"key":26,"text":27,"correct":21},"E","悬臂现浇法","ABD","斜拉桥索塔现浇施工的方法主要包括：①翻模法，应用较早，施工简单，能保证几何尺寸，外观整清。但模板空翻转操作危险，沿海地区不宜用此法。②滑模法，施工速度快，劳动强度小，但技术要求高，施工控制复杂，外观质量较差，且易污染。一般倾斜度较大，预留孔道及埋件多的索塔不宜用此法。③爬模法，爬模兼有滑模和翻模的优势，使用斜拉桥一般索塔的施工。施工安全，质量可靠，修补方便。国内外大多采用此法。",{"id":6,"name":31,"category":32,"favorite":33},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]