[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892501":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},892501,578,2,"多选题","关于重力式挡土墙施工，以下说法错误的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","墙身应整体砌筑",true,{"key":16,"text":17,"correct":18},"B","伸缩缝与沉降缝内两侧壁应竖直平齐，无错叠",false,{"key":20,"text":21,"correct":18},"C","泄水孔应在砌筑墙身过程中设置",{"key":23,"text":24,"correct":14},"D","当墙身的强度达到设计强度的90%时方可进行回填等工作",{"key":26,"text":27,"correct":18},"E","在距墙背0.5～1m以内时，不宜用重型压路机碾压","AD","重力式挡土墙的施工要求如下： ①墙身分层错缝砌筑，砌出地面后基坑及时回填夯实，完成顶面排水及防渗设施。 ②伸缩缝与沉降缝内两侧壁应竖直平齐，无错叠；缝中防水材料应按设计要求施工。 ③泄水孔应在砌筑墙身过程中设置，确保排水通畅，并应保证墙背反滤、防渗设施的施工质量。 ④当墙身的强度达到设计强度的75%时方可进行回填等工作。在距墙背0.5～1m以内时，不宜用重型压路机碾压。",{"id":6,"name":31,"category":32,"favorite":33},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]