[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892499":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},892499,578,2,"多选题","填石路堤施工前，通过修筑试验路段来确定的路堤施工的相应孔隙率标准的参数有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","松铺厚度",true,{"key":16,"text":17,"correct":14},"B","压实机械型号及组合",{"key":19,"text":20,"correct":21},"C","整平机械型号及整平速度",false,{"key":23,"text":24,"correct":14},"D","压实速度及压实遍数",{"key":26,"text":27,"correct":21},"E","孔隙率","ABD","路堤施工前，应先修筑试验路段，确定满足孔隙率标准的松铺厚度、压实机械型号及组合、压实速度及压实遍数、沉降差等参数。",{"id":6,"name":31,"category":32,"favorite":33},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]