[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892480":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},892480,578,2,"多选题","工程一切险是为（ ）所投的保险。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","永久工程",true,{"key":16,"text":17,"correct":14},"B","临时工程和设备",{"key":19,"text":20,"correct":14},"C","已运至施工工地用于永久工程的材料",{"key":22,"text":23,"correct":24},"D","工程所有劳务人员",false,{"key":26,"text":27,"correct":24},"E","运输过程中的材料","ABC","工程保险费是指在合同执行期内，施工企业按合同条款要求办理保险的费用，包括建筑工程一切险和第三方责任险。工程一切险是为永久工程、临时工程和设备及已运至施工工地用于永久工程的材料和设备所投的保险。",{"id":6,"name":31,"category":32,"favorite":33},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]