[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892463":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},892463,578,2,"多选题","关于投标报价编制说明的说法，正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工程量清单中的每一子目须填入单价或价格，且不超过两个报价",false,{"key":16,"text":17,"correct":18},"B","工程量清单中投标人没有填入单价或价格的子目，其费用视为已分摊在工程量清单中其他相关子目的单价或价格之中",true,{"key":20,"text":21,"correct":18},"C","工程量清单中各项金额均以人民币（元）结算",{"key":23,"text":24,"correct":14},"D","暂列金额（含计日工总额）的数量及拟用子目的说明",{"key":26,"text":27,"correct":18},"E","暂估价的数量及拟用子目的说明","BCE","A项，工程量清单中的每一子目须填入单价或价格，且只允许有一个报价。D项，暂列金额（不含计日工总额）的数量及拟用子目的说明。",{"id":6,"name":31,"category":32,"favorite":33},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]