[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892457":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},892457,578,2,"多选题","特殊地区施工增加费包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","高寒地区施工增加费",false,{"key":16,"text":17,"correct":18},"B","高原地区施工增加费",true,{"key":20,"text":21,"correct":14},"C","溶洞地区施工增加费",{"key":23,"text":24,"correct":18},"D","风沙地区施工增加费",{"key":26,"text":27,"correct":18},"E","沿海地区工程施工增加费","BDE","特殊地区施工增加费包括高原地区施工增加费、风沙地区施工增加费和沿海地区工程施工增加费三项。高原地区施工增加费指在海拔高度2000m以上地区施工，由于受气候、气压的影响，致使人工、机械效率降低而增加的费用。风沙地区施工增加费系指在沙漠地区施工时，由于受风沙影响，按照施工及验收规范的要求，为保证工程质量和安全生产而增加的有关费用。沿海地区工程施工增加费指工程项目在沿海地区施工受海风、海浪和潮汐的影响，致使人工、机械效率降低等所需增加的费用。",{"id":6,"name":31,"category":32,"favorite":33},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]