[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892450":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},892450,578,2,"多选题","冬季施工增加费的内容包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","因冬季施工所需增加的一切人工、机械与材料的支出",true,{"key":16,"text":17,"correct":18},"B","材料因受潮、受湿的耗损费用",false,{"key":20,"text":21,"correct":14},"C","施工机械所需修建的暖棚，增加其他保温设备购置费用",{"key":23,"text":24,"correct":14},"D","因施工组织设计确定，需增加的一切保温、加温等有关支出",{"key":26,"text":27,"correct":18},"E","因防止雨水必须采取的防护措施的费用","ACD","冬季施工增加费是指按照公路工程施工及验收规范所规定的冬季施工要求，为保证工程质量和安全生产所需采取的防寒保温设施、工效降低和机械作业效率降低以及技术操作过程的改变等所增加的有关费用。冬季施工增加费的内容包括：①因冬季施工所需增加的一切人工、机械与材料的支出；②施工机械所需修建的暖棚（包括拆、移），增加其他保温设备购置费用；③因施工组织设计确定，需增加的一切保温、加温等有关支出；④与冬季施工有关的其他各项费用。",{"id":6,"name":31,"category":32,"favorite":33},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]