[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892348":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},892348,578,1,"单选题","公路施工过程组织方法不包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","顺序作业法",false,{"key":16,"text":17,"correct":14},"B","平行作业法",{"key":19,"text":20,"correct":14},"C","流水作业法",{"key":22,"text":23,"correct":24},"D","搭接作业法",true,"为了做好施工组织设计，必须事先进行施工组织调查工作。公路施工过程组织方法有顺序作业法、平行作业法、流水作业法。",{"id":6,"name":27,"category":28,"favorite":29},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]