[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892342":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},892342,578,1,"单选题","关于辅助工程的说法，错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","没有具体的服务工程对象",true,{"key":16,"text":17,"correct":18},"B","不构成主体工程的实体",false,{"key":20,"text":21,"correct":18},"C","将其费用综合在相应的使用对象工程造价内",{"key":23,"text":24,"correct":18},"D","不得作为计量支付的依据","辅助工程是相对于主体工程而言的，它有具体的服务工程对象，但在施工过程中只起辅助性的作用，不构成主体工程的实体，通常是将其费用综合在相应的使用对象工程造价内，除个别外，一般都不单独反映这些辅助工程的内容，亦不得作为计量支付的依据。",{"id":6,"name":27,"category":28,"favorite":29},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]