[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892340":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},892340,578,1,"单选题","施工图预算的主要组成部分不包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","设备、工具、器具及家具购置费",false,{"key":16,"text":17,"correct":14},"B","工程建设其他费用",{"key":19,"text":20,"correct":21},"C","规费",true,{"key":23,"text":24,"correct":14},"D","建筑安装工程费","施工图预算的编制过程也是施工组织计划的过程。施工组织计划中的施工计划决定着施工图预算，反过来，施工图预算又制约着施工组织计划，两者是辩证统一的关系，是相辅相成的。从施工图预算的组成来分析，其主要是由建筑安装工程费，设备、工具、器具及家具购置费，工程建设其他费用，预留费等项组成。",{"id":6,"name":27,"category":28,"favorite":29},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]