[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892318":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},892318,578,1,"单选题","斜拉桥主梁施工方法与梁式桥基本相同，下列关于斜拉桥主梁施工的说法，不正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","现浇梁段和第一预制梁段间宜设湿接头",false,{"key":16,"text":17,"correct":18},"B","预制桥面板安装应遵循先安装后预制原则",true,{"key":20,"text":21,"correct":14},"C","悬浇施工挂篮应主梁浇筑时抗风振刚度要求",{"key":23,"text":24,"correct":14},"D","悬拼施工梁段的预制可采用长线法或短线法台座","斜拉桥主梁施工方法大体分为：悬臂现浇法、悬臂拼装法、顶推法、转体施工法和支架现浇法。A项，0号及其相邻的梁段为现浇时，在现浇梁段和第一节预制安装梁段间宜设湿接头，对湿接头结合面的梁段混凝土应进行凿毛并清洗干净。B项，预制桥面板安装前，应将钢梁与桥面板的结合面及剪力连接装置表面清理干净。安装应遵循先预制后安装的原则，安装时不得因桥面板就位困难而随意破坏剪力连接装置。C项，用于悬浇施工的挂篮应满足使用期的强度和稳定性要求，同时应考虑主梁在浇筑混凝土时抗风振的刚度要求。D项，混凝土主梁采用悬臂拼装法施工时。梁段的预制可采用长线法或短线法台座。",{"id":6,"name":27,"category":28,"favorite":29},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]