[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892277":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},892277,578,1,"单选题","下列关于钢筋工程施工的说法，错误的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","钢筋外表有严重锈蚀时不得使用",false,{"key":16,"text":17,"correct":14},"B","轴心受拉构件不应采用绑扎接头",{"key":19,"text":20,"correct":21},"C","钢筋连接宜采用焊接接头或绑扎接头",true,{"key":23,"text":24,"correct":14},"D","预制成的钢筋骨架必须具有足够的稳定性","A项，钢筋外表有严重锈蚀、麻坑、裂纹夹砂和夹层等缺陷时应予剔除，不得使用。BC两项，钢筋连接宜采用焊接接头或机械连接接头。绑扎接头仅当钢筋构造施工困难时方可采用，轴心受拉和小偏心受拉构件不应采用绑扎接头。D项，预制成的钢筋骨架，必须具有足够的刚度和稳定性。",{"id":6,"name":27,"category":28,"favorite":29},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]