[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892257":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},892257,578,1,"单选题","预制安装混凝土块计量的工程内容不包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","基坑开挖",false,{"key":16,"text":17,"correct":14},"B","构件预测",{"key":19,"text":20,"correct":14},"C","预制件安装",{"key":22,"text":23,"correct":24},"D","装修、养护",true,"预制安装混凝土块计量的工程内容包括：①基坑开挖、清理、夯实；②构件预测；③预制件安装，设置泄水孔及其滤水层；④接缝处理；⑤勾缝、抹面；⑥场地清理。",{"id":6,"name":27,"category":28,"favorite":29},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]