[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892256":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},892256,578,1,"单选题","石砌截水沟、排水沟应依据图纸所示位置及尺寸，按图示砌体体积分不同（ ）以立方米为单位计量。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","砂浆强度等级",true,{"key":16,"text":17,"correct":18},"B","尺寸大小",false,{"key":20,"text":21,"correct":18},"C","体积",{"key":23,"text":24,"correct":18},"D","重量","石砌截水沟、排水沟应依据图纸所示位置及尺寸，按图示砌体体积分不同砂浆强度等级以立方米为单位计量。",{"id":6,"name":27,"category":28,"favorite":29},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]