[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892251":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},892251,578,1,"单选题","陆上钻孔灌注桩的计量单位是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","m",true,{"key":16,"text":17,"correct":18},"B","m2",false,{"key":20,"text":21,"correct":18},"C","m3",{"key":23,"text":24,"correct":18},"D","根","陆上钻孔灌注桩的计量依据图纸所示柱长及混凝土强度等级，按照不同柱径的柱长以米为单位计量；施工图设计水深小于2m（含2m）的为陆上孔灌注柱。",{"id":6,"name":27,"category":28,"favorite":29},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]