[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892250":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},892250,578,1,"单选题","以下不属于桥梁涵洞工程内容的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","钢筋混凝土沉井",false,{"key":16,"text":17,"correct":14},"B","钢架拱上部构造",{"key":19,"text":20,"correct":14},"C","伸缩缝装置",{"key":22,"text":23,"correct":24},"D","结构柱的制作",true,"桥梁涵洞工程内容：桥梁荷载试验、补充地质勘探、钢筋、挖基、混凝土灌注桩、钢筋混凝土沉桩、钢筋混凝土沉井、扩大基础；现浇混凝土下部构造，混凝土上部构造，预应力钢材，现浇预应力上部构造，预制预应力混凝土上部构造，斜拉桥上部构造，钢架拱上部构造；浆砌块片石及混凝土预制块、桥面铺装、桥梁支座、伸缩缝装置、涵洞工程。",{"id":6,"name":27,"category":28,"favorite":29},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]