[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892221":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},892221,578,1,"单选题","开工预付款在达到签约合同价（ ）之后，开始按工程进度以固定比率分期从各月的进度付款证书中扣回。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","15%",false,{"key":16,"text":17,"correct":14},"B","20%",{"key":19,"text":20,"correct":14},"C","25%",{"key":22,"text":23,"correct":24},"D","30%",true,"开工预付款在进度付款证书的累计金额未达到签约合同价的30%之前不予扣回，在达到签约合同价30%之后，开始按工程进度以固定比率（每完成签约合同价的1%，扣回开工预付款的2%）分期从各月的进度付款证书中扣回，全部金额在进度付款证书的累计金额达到签约合同价的80%时扣完。",{"id":6,"name":27,"category":28,"favorite":29},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]