[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892201":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},892201,578,1,"单选题","建设项目全寿命周期的建筑信息模型（Building Information Modeling）的费用属于（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工程建设其他费",false,{"key":16,"text":17,"correct":14},"B","企业管理费",{"key":19,"text":20,"correct":21},"C","建设项目信息化费",true,{"key":23,"text":24,"correct":14},"D","措施项目费","建设项目信息化费是指建设单位（业主）和各参建单位用于建设项目的质量、安全、进度、费用等方面的信息化建设、运维及各种税费等费用，包括建设项目全寿命周期的建筑信息模型（Building Information Modeling）等相关费用。",{"id":6,"name":27,"category":28,"favorite":29},"[交通运输工程]建设工程计量与计价实务","建筑工程",0]