[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-577-29":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":629},{"id":5,"name":6,"category":7,"favorite":8},577,"[安装工程]建设工程计量与计价实务","建筑工程",0,29,50,1537,[13,38,53,68,81,94,106,119,131,143,155,167,180,192,204,217,227,239,251,263,276,289,301,311,323,335,347,359,367,379,391,403,415,427,439,451,463,475,487,499,511,523,534,546,558,569,581,593,605,617],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},892059,2,"多选题","《2017安装工程预算定额》的主要内容包括（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","文字说明",true,{"key":24,"text":25,"correct":22},"B","工程量计算规则",{"key":27,"text":28,"correct":29},"C","清单项目表",false,{"key":31,"text":32,"correct":29},"D","施工平面图",{"key":34,"text":35,"correct":22},"E","定额项目表","ABE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},892060,"增值税的计税方法包括（ ）方法。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"常规计税方法",{"key":24,"text":45,"correct":29},"特殊计税方法",{"key":27,"text":47,"correct":29},"定值计税方法",{"key":31,"text":49,"correct":22},"一般计税方法",{"key":34,"text":51,"correct":22},"简易计税方法","DE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},892061,"按照《通用安装工程工程量计算规范》，措施项目清单列项正确的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"当拟建工程中有工艺钢结构预制安装和工业管道预制安装时，措施项目清单可列项“平台铺设.拆除”",{"key":24,"text":60,"correct":22},"当拟建工程中有设备.管道冬雨季施工，有易燃易爆.有害环境施工，或设备.管道焊接质量要求较高时，措施项目清单可列项“设备.管道施工的安全防冻和焊接保护”",{"key":27,"text":62,"correct":29},"当拟建工程中有一类容器制作.安装，有超过9MPa的高压管道敷设时，措施项目清单可列项“工程系统检测.检验”",{"key":31,"text":64,"correct":22},"当拟建工程中有冶金炉窑时，措施项目清单可列项“焦炉烘炉.热态工程”",{"key":34,"text":66,"correct":29},"当拟建工程有质量大于50t的设备安装时，措施项目清单可列项“金属抱杆安装拆除.移位”","ABD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":80,"analysis":37},892062,"排水系统的排水管道的组成包括（ ）。",[72,74,76,78],{"key":20,"text":73,"correct":22},"排水横支管",{"key":24,"text":75,"correct":29},"通气管",{"key":27,"text":77,"correct":22},"排水立管",{"key":31,"text":79,"correct":22},"排出管","ACD",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":93,"analysis":37},892063,"依据《通用安装工程量计算规范》（GB 50856-2013）的规定，风管工程计量中风管长度一律以设计图示中心线长度为准。风管长度中包括（ ）。",[85,87,89,91],{"key":20,"text":86,"correct":22},"弯头长度",{"key":24,"text":88,"correct":22},"三通长度",{"key":27,"text":90,"correct":22},"天圆地方长度",{"key":31,"text":92,"correct":29},"部件长度","ABC",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":93,"analysis":37},892064,"有线通信传输常用介质为（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"光缆",{"key":24,"text":101,"correct":22},"同轴电缆",{"key":27,"text":103,"correct":22},"双绞线",{"key":31,"text":105,"correct":29},"钢芯铝绞线",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":118,"analysis":37},892065,"光在光纤中的传输模式可分为（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":29},"屏蔽光纤",{"key":24,"text":113,"correct":29},"非屏蔽光纤",{"key":27,"text":115,"correct":22},"多模光纤",{"key":31,"text":117,"correct":22},"单模光纤","CD",{"id":120,"libraryId":5,"type":15,"typeLabel":16,"stem":121,"options":122,"answer":93,"analysis":37},892066,"激光切割是一种无接触的切割方法，其切割的主要特点有（ ）。",[123,125,127,129],{"key":20,"text":124,"correct":22},"切割精度高",{"key":24,"text":126,"correct":22},"切割速度快",{"key":27,"text":128,"correct":22},"可切割金属与非金属材料",{"key":31,"text":130,"correct":29},"适用于各种厚度材料的切割",{"id":132,"libraryId":5,"type":15,"typeLabel":16,"stem":133,"options":134,"answer":67,"analysis":37},892067,"在安装专业措施项目清单中，在吊装加固项目工作内容及包含范围内的是（ ）。",[135,137,139,141],{"key":20,"text":136,"correct":22},"行车梁加固",{"key":24,"text":138,"correct":22},"桥式起重机加固及负荷试验",{"key":27,"text":140,"correct":29},"吊装设备吊耳的制作、加固及安装",{"key":31,"text":142,"correct":22},"整体吊装临时加固件、加固设施拆除、清理",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":93,"analysis":37},892068,"依据《通用安装工程工程量计算规范》（GB 50856—2013），属于安全文明施工措施项目的有（ ）。",[147,149,151,153],{"key":20,"text":148,"correct":22},"环境保护",{"key":24,"text":150,"correct":22},"安全施工",{"key":27,"text":152,"correct":22},"临时设施",{"key":31,"text":154,"correct":29},"已完工程及设备保护",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":93,"analysis":37},892069,"《2017安装预算定额》定额人工费单价的组成部分有劳动保险（个人缴纳），职工福利费，劳动保护费，工会经费，职工教育经费和（ ）。",[159,161,163,165],{"key":20,"text":160,"correct":22},"计时工资或计件工资",{"key":24,"text":162,"correct":22},"奖金和津贴补贴",{"key":27,"text":164,"correct":22},"加班加点工资和特殊情况下支付的工资",{"key":31,"text":166,"correct":29},"工资性质津贴",{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":179,"analysis":37},892070,"投标人投标报价时应应按照招标人提供的金额填写，不得变动的费用有（ ）。",[171,173,175,177],{"key":20,"text":172,"correct":22},"暂列金额",{"key":24,"text":174,"correct":22},"材料暂估价",{"key":27,"text":176,"correct":29},"计日工",{"key":31,"text":178,"correct":29},"总承包服务费","AB",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":93,"analysis":37},892071,"建设项目竣工决算应包括从筹集到竣工投产全过程的全部实际费用，即包括建筑工程费和（ ）。",[184,186,188,190],{"key":20,"text":185,"correct":22},"设备工器具购置费用",{"key":24,"text":187,"correct":22},"预备费",{"key":27,"text":189,"correct":22},"安装工程费",{"key":31,"text":191,"correct":29},"流动资金",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":179,"analysis":37},892072,"（ ）又称为建设项目竣工财务决算，是竣工决算的核心内容。",[196,198,200,202],{"key":20,"text":197,"correct":22},"A竣工财务决算说明书",{"key":24,"text":199,"correct":22},"竣工财务决算报表",{"key":27,"text":201,"correct":29},"工程竣工图",{"key":31,"text":203,"correct":29},"工程竣工造价对比分析",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":216,"analysis":37},892073,"卫生器具交工前应做试验为（ ）。",[208,210,212,214],{"key":20,"text":209,"correct":29},"灌水试验",{"key":24,"text":211,"correct":22},"通水试验",{"key":27,"text":213,"correct":22},"满水试验",{"key":31,"text":215,"correct":29},"冲洗和消毒","BC",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":67,"analysis":37},892074,"排水管道系统组成部分有（ ）。",[221,222,224,226],{"key":20,"text":73,"correct":22},{"key":24,"text":223,"correct":22},"埋地干管",{"key":27,"text":225,"correct":29},"进户管",{"key":31,"text":79,"correct":22},{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":118,"analysis":37},892075,"排水系统常用管材有（ ）。",[231,233,235,237],{"key":20,"text":232,"correct":29},"镀锌钢管",{"key":24,"text":234,"correct":29},"无缝钢管",{"key":27,"text":236,"correct":22},"排水铸铁管",{"key":31,"text":238,"correct":22},"硬聚氯乙烯排水管",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":118,"analysis":37},892076,"热水采暖系统机械循环双管上供下回式的特点有（ ）。",[243,245,247,249],{"key":20,"text":244,"correct":29},"对楼层、扩建有利",{"key":24,"text":246,"correct":29},"室内无供水干管，顶层房间美观",{"key":27,"text":248,"correct":22},"排气方便，室温可调节",{"key":31,"text":250,"correct":22},"易产生垂直失调",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":93,"analysis":37},892077,"用于输送凝结水的凝结水泵常设置在（ ）。",[255,257,259,261],{"key":20,"text":256,"correct":22},"热源",{"key":24,"text":258,"correct":22},"用户内",{"key":27,"text":260,"correct":22},"凝水回收站",{"key":31,"text":262,"correct":29},"中继站",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":275,"analysis":37},892078,"为提高燃气压力或输送燃气，目前在中、低压两级燃气输送系统中使用的压送设备有（ ）。",[267,269,271,273],{"key":20,"text":268,"correct":22},"罗茨式鼓风机",{"key":24,"text":270,"correct":29},"螺杆式鼓风机",{"key":27,"text":272,"correct":22},"往复式压送机",{"key":31,"text":274,"correct":29},"透平式压送机","AC",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":288,"analysis":37},892079,"按工程量清单计量规范规定，下列给排水、采暖、燃气管道工程量计量规则正确的为（ ）。",[280,282,284,286],{"key":20,"text":281,"correct":22},"室外管道碰头工程数量按设计图示以处计算",{"key":24,"text":283,"correct":29},"排水管道安装不包括立管检查口",{"key":27,"text":285,"correct":29},"管道工程量计算扣除阀门所占长度",{"key":31,"text":287,"correct":22},"管道工程量计算不扣除管件及附属构筑物所占长度","AD",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":179,"analysis":37},892080,"《安装工程计算规范》中管道刷油、设备与矩形管道刷油、铸铁管和暖气片刷油清单项目计量单位为（ ）。",[293,295,297,299],{"key":20,"text":294,"correct":22},"m",{"key":24,"text":296,"correct":22},"m2",{"key":27,"text":298,"correct":29},"m3",{"key":31,"text":300,"correct":29},"Kg",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":310,"analysis":37},892081,"《安装工程计算规范》中防潮层、保护层清单项目工程量计量单位为（ ）。",[305,306,307,308],{"key":20,"text":294,"correct":29},{"key":24,"text":296,"correct":22},{"key":27,"text":298,"correct":29},{"key":31,"text":309,"correct":22},"kg","BD",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":179,"analysis":37},892082,"《2017安装预算定额》第十册《给排水、采暖、燃气工程》排水管道室内外界限为（ ）。",[315,317,319,321],{"key":20,"text":316,"correct":22},"出户第一个排水检查井",{"key":24,"text":318,"correct":22},"无检查井时以出户距外墙皮3m处",{"key":27,"text":320,"correct":29},"墙外三通",{"key":31,"text":322,"correct":29},"市政管道碰头井",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":216,"analysis":37},892083,"下列关于《2017安装预算定额》第十二册《刷油、防腐蚀、绝热工程》内容正确的为（ ）。",[327,329,331,333],{"key":20,"text":328,"correct":29},"喷射除锈Sa3级，按人工、材料和机械乘以系数0.9",{"key":24,"text":330,"correct":22},"手工和动力工具除锈按St2标准确定，如按St3标准定额乘以系数1.10",{"key":27,"text":332,"correct":22},"通风管道绝热分材质、绝热层厚度以m2计量，按风管净面积计算",{"key":31,"text":334,"correct":29},"玻璃丝布、塑料布保护层定额按缠裹一层编制，缠裹两层其工程量乘以1.5",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":118,"analysis":37},892084,"全面通风可分为稀释通风、单向流通风、（ ）。",[339,341,343,345],{"key":20,"text":340,"correct":29},"循环通风",{"key":24,"text":342,"correct":29},"双向流通风",{"key":27,"text":344,"correct":22},"置换通风",{"key":31,"text":346,"correct":22},"均匀流通风",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":118,"analysis":37},892085,"换热器按结构分为 （ ）。",[351,353,355,357],{"key":20,"text":352,"correct":29},"间壁式换热器",{"key":24,"text":354,"correct":29},"蓄热式换热器",{"key":27,"text":356,"correct":22},"浮头式换热器",{"key":31,"text":358,"correct":22},"固定管板式换热器",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":93,"analysis":37},892086,"依据《通用安装工程量计算规范》（GB 50856－2013）的规定，风管工程量中风管长度一律以设计图示中心线长度为准。风管长度中包括（ ）。",[363,364,365,366],{"key":20,"text":86,"correct":22},{"key":24,"text":88,"correct":22},{"key":27,"text":90,"correct":22},{"key":31,"text":92,"correct":29},{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":179,"analysis":37},892087,"下列关于《2017安装预算定额》第七册《通风空调工程》内容正确的为（ ）。",[371,373,375,377],{"key":20,"text":372,"correct":22},"通风系统设计采用渐缩管均匀送风时，圆形风管按平均直径执行相应定额子目",{"key":24,"text":374,"correct":22},"通风空调工程系统调试费的计取方法，系统调试费按系统工程人工费的7%计算，其中系统调试费中的人工费占35%",{"key":27,"text":376,"correct":29},"镀锌钢板、铝板保护层厚度大于0.5mm，可换算板材价格，人工乘以系数1.1",{"key":31,"text":378,"correct":29},"不锈钢薄板作保护层时，执行本章镀锌钢板保护层定额子目，人工乘以系数1.2",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":275,"analysis":37},892088,"当室内消防用水量不能满足消防要求时，消防车可通过水泵接合器向室内管网供水灭火，水泵接合器的设置场合应为（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":22},"高层民用建筑",{"key":24,"text":386,"correct":29},"超过六层的其他多层民用建筑",{"key":27,"text":388,"correct":22},"高层工业建筑",{"key":31,"text":390,"correct":29},"超过三层的多层工业建筑",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":118,"analysis":37},892089,"避雷器类型除保护间隙、阀型外，还有（ ）。",[395,397,399,401],{"key":20,"text":396,"correct":29},"真空式",{"key":24,"text":398,"correct":29},"SF6",{"key":27,"text":400,"correct":22},"管型",{"key":31,"text":402,"correct":22},"氧化锌型",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":216,"analysis":37},892090,"接地系统中，接地体的连接应采用焊接，导体为钢材时，焊接时的搭接长度为（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":29},"扁钢与扁钢不应少于扁钢宽度的6倍",{"key":24,"text":410,"correct":22},"圆钢与圆钢不应少于圆钢直径的6倍",{"key":27,"text":412,"correct":22},"圆钢与扁钢不应少于圆钢直径的6倍",{"key":31,"text":414,"correct":29},"圆钢与扁钢不应少于扁钢宽度的2倍",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":275,"analysis":37},892091,"根据《通用安装工程工程量计算规范》，电力电缆安装工程计量单位正确的为（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":22},"电力电缆、控制电缆，m",{"key":24,"text":422,"correct":29},"电缆保护管，个",{"key":27,"text":424,"correct":22},"电力电缆头，个",{"key":31,"text":426,"correct":29},"防火隔板，个",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":118,"analysis":37},892092,"依据我国行业标准，建筑自动化系统可分为设备运行管理与监控子系统与（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":29},"电梯子系统",{"key":24,"text":434,"correct":29},"供配电子系统",{"key":27,"text":436,"correct":22},"消防子系统",{"key":31,"text":438,"correct":22},"安全防范子系统",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":310,"analysis":37},892093,"自动喷水湿式灭火系统的主要特点有（ ）。",[443,445,447,449],{"key":20,"text":444,"correct":29},"作用时间较干式系统迟缓",{"key":24,"text":446,"correct":22},"不适用于寒冷地区",{"key":27,"text":448,"correct":29},"要设置空压机等附属设备，投资较大",{"key":31,"text":450,"correct":22},"控制火势或灭火迅速",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":93,"analysis":37},892094,"用在管端起封闭作用的管件有（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"管帽",{"key":24,"text":458,"correct":22},"管堵",{"key":27,"text":460,"correct":22},"盲板",{"key":31,"text":462,"correct":29},"法兰",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":474,"analysis":37},892095,"综合布线电缆使用的传输媒体有（ ）。",[467,468,470,472],{"key":20,"text":105,"correct":29},{"key":24,"text":469,"correct":22},"屏蔽双绞线",{"key":27,"text":471,"correct":22},"非屏蔽双绞线",{"key":31,"text":473,"correct":22},"大对数铜缆","BCD",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":67,"analysis":37},892096,"可以按《安装工程计量规范》相应项目执行的有（ ）。",[479,481,483,485],{"key":20,"text":480,"correct":22},"住宅小区的道路路灯安装工程",{"key":24,"text":482,"correct":22},"厂区的庭院艺术喷泉等电气设备安装工程",{"key":27,"text":484,"correct":29},"厂区入口水表井为界以外的给水管道",{"key":31,"text":486,"correct":22},"市政管道碰头井为界以内的室外给排水、采暖、燃气管道",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":93,"analysis":37},892097,"《2017安装预算定额》预算单价组成有人工费、机械费和（ ）。",[491,493,495,497],{"key":20,"text":492,"correct":22},"利润",{"key":24,"text":494,"correct":22},"材料费",{"key":27,"text":496,"correct":22},"管理费",{"key":31,"text":498,"correct":29},"D风险费",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":288,"analysis":37},892098,"《2017安装预算定额》规费包括（ ）。",[503,505,507,509],{"key":20,"text":504,"correct":22},"住房公积金",{"key":24,"text":506,"correct":29},"残疾人就业保障金",{"key":27,"text":508,"correct":29},"教育费附加",{"key":31,"text":510,"correct":22},"水利建设基金",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":275,"analysis":37},892099,"《2017安装预算定额》中，总承包服务费的计取办法为（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":22},"当招标人仅要求对分包的专业工程进行总承包管理和协调时，按发包的专业工程估算造价的1.5%计算",{"key":24,"text":518,"correct":29},"当招标人要求对分包的专业工程进行总承包管理和协调，并同时要求提供配合服务时，按发包的专业工程估算造价的2%计算",{"key":27,"text":520,"correct":22},"招标人自行供应材料的，按招标人供应材料价值的1%计算",{"key":31,"text":522,"correct":29},"发包人要求总承包人为专业分包工程提供水电源并且支付水电费的，水电费的计算应进行事先约定，也可向发包人按分部分项工程费的1.5%计取",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":275,"analysis":37},892100,"工程量清单计价最高投标限价与投标报价组成费用中，应按照国家、行业和地方政府的法律法规及相关规定来计算的有（ ）。",[527,529,531,533],{"key":20,"text":528,"correct":22},"规费",{"key":24,"text":530,"correct":29},"企业管理费",{"key":27,"text":532,"correct":22},"安全文明施工费",{"key":31,"text":172,"correct":29},{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":474,"analysis":37},892101,"关于给水铸铁管正确的为（ ）。",[538,540,542,544],{"key":20,"text":539,"correct":29},"多用于DN≥50mm的给水管道中",{"key":24,"text":541,"correct":22},"适用于埋地铺设",{"key":27,"text":543,"correct":22},"采用承插连接",{"key":31,"text":545,"correct":22},"交通要道等振动较大的地段采用青铅接口",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":216,"analysis":37},892102,"给水管道与其他管道共架敷设时，宜敷设在给水管下面的管道有（ ）。",[550,552,554,556],{"key":20,"text":551,"correct":29},"热水管",{"key":24,"text":553,"correct":22},"排水管",{"key":27,"text":555,"correct":22},"冷冻管",{"key":31,"text":557,"correct":29},"蒸汽管",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":179,"analysis":37},892103,"室内采暖管道常采用管道类型为（ ）。",[562,564,565,567],{"key":20,"text":563,"correct":22},"焊接钢管",{"key":24,"text":232,"correct":22},{"key":27,"text":566,"correct":29},"钢板卷焊管",{"key":31,"text":568,"correct":29},"交联聚乙烯（PE-X）管",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":80,"analysis":37},892104,"燃气输配系统组成除包括燃气输配管网、储配站外，还有（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"调压计量装置",{"key":24,"text":576,"correct":29},"恒流计量站",{"key":27,"text":578,"correct":22},"运行监控系统",{"key":31,"text":580,"correct":22},"数据采集系统",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":179,"analysis":37},892105,"在燃气管道系统中，组成一级系统的管网有（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":22},"低压管网",{"key":24,"text":588,"correct":22},"中压管网",{"key":27,"text":590,"correct":29},"次高压管网",{"key":31,"text":592,"correct":29},"高压管网",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":93,"analysis":37},892106,"外表面应设置防潮层的设备或管道为（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":22},"设备保冷层",{"key":24,"text":600,"correct":22},"管道保冷层",{"key":27,"text":602,"correct":22},"地沟内管道的保温层",{"key":31,"text":604,"correct":29},"架空管道的保温层",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":179,"analysis":37},892107,"在计算管道工程的工程量时，给水管道室内外划分界限为（ ）。",[609,611,613,615],{"key":20,"text":610,"correct":22},"入口设阀门者以阀门为界",{"key":24,"text":612,"correct":22},"建筑物外墙皮1.5m为界",{"key":27,"text":614,"correct":29},"墙外三通为界",{"key":31,"text":616,"correct":29},"室内第一个阀门为界",{"id":618,"libraryId":5,"type":15,"typeLabel":16,"stem":619,"options":620,"answer":216,"analysis":37},892108,"空调系统中，对空气进行减湿处理的设备有（ ）。",[621,623,625,627],{"key":20,"text":622,"correct":29},"蒸发器",{"key":24,"text":624,"correct":22},"表面式冷却器",{"key":27,"text":626,"correct":22},"喷水室",{"key":31,"text":628,"correct":29},"加热器",[630,634,637,640,643,646],{"id":631,"name":632,"category":7,"favorite":633},1,"领导干部任职前廉政法规知识测试题",92,{"id":635,"name":636,"category":7,"favorite":631},595,"建筑结构与设备",{"id":638,"name":639,"category":7,"favorite":631},715,"招标采购专业知识与法律法规",{"id":641,"name":642,"category":7,"favorite":631},848,"市政方向-通用基础",{"id":644,"name":645,"category":7,"favorite":8},534,"BIM工程师",{"id":647,"name":645,"category":7,"favorite":8},535]