[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892159":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},892159,577,2,"多选题","排水、采暖、燃气管道工程量计量规则，管道支吊架与设备支吊架两个分项工程清单项目的计量单位为（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","个",false,{"key":16,"text":17,"correct":18},"B","套",true,{"key":20,"text":21,"correct":18},"C","kg",{"key":23,"text":24,"correct":14},"D","m",{"key":26,"text":27,"correct":14},"E","10m","BC","知识点:给排水、采暖、燃气工程计量及应用。管道支吊架与设备支吊架两个分项工程清单项目有两种计量方式，以“kg”计量，按设计图示质量计算；以“套”计量，按设计图示数量计算。参见教材P99。",{"id":6,"name":31,"category":32,"favorite":33},"[安装工程]建设工程计量与计价实务","建筑工程",0]