[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892147":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},892147,577,2,"多选题","依据《通用安装工程工程量计算规范》（GB 50856—2013），下列项目中属于专业措施项目的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","夜间施工增加",false,{"key":16,"text":17,"correct":18},"B","安全与施工同时进行施工增加",true,{"key":20,"text":21,"correct":18},"C","在有害身体健康环境中施工增加",{"key":23,"text":24,"correct":18},"D","特殊地区施工增加",{"key":26,"text":27,"correct":14},"E","二次搬运费","BCD","知识点:安装工程措施项目清单。通用措施项目中包括：安全文明施工、夜间施工增加、非夜间施工增加、二次搬运、冬雨季施工增加、已完工程及设备保护、高层施工增加。专业措施项目有特殊地区施工增加、安装与生产同时进行施工增加、在有害身体健康环境中施工增加。参见教材P41～43。",{"id":6,"name":31,"category":32,"favorite":33},"[安装工程]建设工程计量与计价实务","建筑工程",0]