[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892120":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},892120,577,2,"多选题","安装工程项目的特点有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设的短期性",false,{"key":16,"text":17,"correct":18},"B","工程运行危险性",true,{"key":20,"text":21,"correct":18},"C","环境条件苛刻性",{"key":23,"text":24,"correct":14},"D","工程实体的多件性","BC","本题考查的是安装工程项目的特点。建设项目普遍的特点-单件性、固着性和建设的长期性，形体庞大性。 安装工程项目的特点：设计的多样性、工程运行的危险性、环境条件苛刻性。",{"id":6,"name":28,"category":29,"favorite":30},"[安装工程]建设工程计量与计价实务","建筑工程",0]