[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892115":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},892115,577,2,"多选题","在接地电阻达不到标准时，应采取的措施有（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","加“降阻剂”",true,{"key":16,"text":17,"correct":14},"B","增加接地极的数量",{"key":19,"text":20,"correct":21},"C","增加接地极的埋入深度",false,{"key":23,"text":24,"correct":14},"D","更换接地极的位置","ABD","本题考查的是建筑电气工程施工技术。如接地装置的接地电阻达不到上述标准时，应加“降阻剂”或增加接地极的数量或更换接地极的位置后，再测试接地电阻，直到合乎标准为止。",{"id":6,"name":28,"category":29,"favorite":30},"[安装工程]建设工程计量与计价实务","建筑工程",0]