[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-892002":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},892002,577,2,"多选题","综合单价包括完成一个规定清单项目所需的人工费、材料（设备）费、施工机具使用费、企业管理费和利润，并考虑（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","风险费用的分摊",true,{"key":16,"text":17,"correct":14},"B","价格竞争因素",{"key":19,"text":20,"correct":21},"C","规费",false,{"key":23,"text":24,"correct":21},"D","法律法规变化","AB","分部分项工程和单价措施项目清单与计价表编制过程最主要的内容是确定综合单价。 综合单价包括：人工费、材料费、施工机具使用费、企业管理费和利润，并考虑风险费用的分摊及价格竞争因素。",{"id":6,"name":28,"category":29,"favorite":30},"[安装工程]建设工程计量与计价实务","建筑工程",0]