[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891990":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},891990,577,2,"多选题","依据《通用安装工程工程量计算规范》（GB50856-2013），在编制某建设项目分部分项工程量清单时，包括五部分内容，其中有（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目名称",true,{"key":16,"text":17,"correct":14},"B","项目编码",{"key":19,"text":20,"correct":21},"C","计算规则",false,{"key":23,"text":24,"correct":21},"D","工作内","AB","部分分别为：项目编码、项目名称、项目特征、计量单位、工程量。",{"id":6,"name":28,"category":29,"favorite":30},"[安装工程]建设工程计量与计价实务","建筑工程",0]